Loading...
HomeMy WebLinkAboutM002.1ACG BG BB AB A2B C1 C1 CG1 DB D1B EB FG FB V1 V2 V3 V4 V5 V6 V7 V9 V12 V15 V18 V10 V13 V16 V8 V11 V14 V17 V19 V20 PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB1 PB PB JUS26 JUS26 JUS26 JUS26 JUS26 JUS26 JUS26 JUS28 JUS26 JUS28 JUS28 JUS28 JUS28 JUS28 JUS28 JUS28 JUS26 HUS26 JUS26 HUS26 JUS26 JUS26 HUS26 JUS26 JUS26 JUS26 JUS28 JUS28 JUS28 JUS28 JUS28 JUS28 JUS28 JUS28 JUS28 JUS28 JUS28 JUS28 A2(3) A1(7) C(5) D1(12) D(3) E(3) A(3) A3(2) 11-08 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-11-08 2-00-00 2-00-00 2-00-00 2-00-00 1-09-12 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-09-12 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-10-08 1-06-00 1-05-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 Order #: 18040137 The Grove @ Legacy - 16A 7214 Cherry Creek Boulevard Carmel, Indiana 46033 Carter Lumber 2901 N. Morton St. Franklin, Indiana 46131 (317) 346-1300 THIS IS A TRUSS PLACEMENT DIAGRAM ONLY. These trusses are designed as individual building components to be incorporated into the building design at the specification of the buildingdesigner. Seeindividualdesignsheetsforeachtrussdesign identified on the placement drawing. The building designer is responsiblefortemporaryandpermanentbracingoftheroofandfloorsystem and for the overall structure. The design of the truss support structure including headers, beams, walls, and columns is the responsibility of the building designer. For general guidance regarding bracing, consult "Bracing of Wood Trusses" available from the Truss Plate Institute, 583 D'Onifrio Drive; Madison, WI 53179. SHOP DRAWING APPROVAL THIS LAYOUT IS THE SOLE SOURCE FOR FABRICATION OF TRUSSES AND VOIDS ALL PREVIOUS ARCHITECTURAL OR OTHER TRUSS LAYOUTS. REVIEW AND APPROVAL OF THIS LAYOUT MUST BE RECEIVED BEFORE ANY TRUSSES WILL BE BUILT. VERIFY ALL CONDITIONS TO INSURE AGAINST CHANGES THAT WILL RESULT IN EXTRA CHARGES TO YOU. REVIEWED BY:__________________________ APPROVED BY:______________________________ DATE:___________ Pyatt Builders Scale: NTS Date: 5/8/18 Drawn By: K. Bronnenberg Model Austin Notes: 1) Valley trusses are designed to sit on sheathing. 2) Installation of all temporary and permanent braces is essential. See truss drawings, BCSI-1 Building Component Safety information and building designers requirements. 3) Provide solid bearing for beams and girders. See Code and/or building deigners requirements. 4) Truss are NOT designed to be field modified unless noted otherwise. If any alterations are to be considered ALWAYS consult a qualified truss designer or engineer BEFORE making any alterations. 5) Add/remove overhangs as needed. Multi-Ply Girder Truss: See drawing of multi-ply girders for fastening pattern to connect plys so they act as one. All plys must be fastened together before supported trusses or framing is attached to girders. Hangers: Install all hangers per manufacturers requirements.