HomeMy WebLinkAboutM002.1ACG
BG
BB
AB
A2B
C1
C1
CG1
DB
D1B
EB
FG
FB
V1
V2
V3
V4
V5
V6
V7
V9
V12
V15
V18
V10
V13
V16
V8
V11
V14
V17
V19
V20
PB1
PB1
PB1
PB1
PB1
PB1
PB1
PB1
PB1
PB1
PB1
PB1
PB1
PB1
PB1 PB
PB
JUS26
JUS26
JUS26
JUS26
JUS26
JUS26
JUS26
JUS28 JUS26
JUS28
JUS28
JUS28
JUS28
JUS28
JUS28
JUS28
JUS26
HUS26
JUS26
HUS26
JUS26
JUS26
HUS26
JUS26
JUS26
JUS26
JUS28
JUS28
JUS28
JUS28
JUS28
JUS28
JUS28
JUS28
JUS28
JUS28
JUS28
JUS28
A2(3) A1(7)
C(5)
D1(12) D(3)
E(3)
A(3) A3(2)
11-08
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
1-11-08
2-00-00
2-00-00
2-00-00
2-00-00
1-09-12
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
1-09-12
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
1-10-08
1-06-00 1-05-00
2-00-00
2-00-00
2-00-00
2-00-00
2-00-00
Order #: 18040137
The Grove @ Legacy - 16A
7214 Cherry Creek Boulevard
Carmel, Indiana 46033
Carter Lumber
2901 N. Morton St.
Franklin, Indiana 46131
(317) 346-1300
THIS IS A TRUSS PLACEMENT DIAGRAM ONLY. These trusses are designed as individual building components to be incorporated
into the building design at the specification of the buildingdesigner. Seeindividualdesignsheetsforeachtrussdesign identified on
the placement drawing. The building designer is responsiblefortemporaryandpermanentbracingoftheroofandfloorsystem and
for the overall structure. The design of the truss support structure including headers, beams, walls, and columns is the responsibility of
the building designer. For general guidance regarding bracing, consult "Bracing of Wood Trusses" available from the Truss Plate
Institute, 583 D'Onifrio Drive; Madison, WI 53179.
SHOP DRAWING APPROVAL
THIS LAYOUT IS THE SOLE SOURCE FOR FABRICATION OF TRUSSES AND VOIDS ALL PREVIOUS ARCHITECTURAL OR
OTHER TRUSS LAYOUTS. REVIEW AND APPROVAL OF THIS LAYOUT MUST BE RECEIVED BEFORE ANY TRUSSES WILL
BE BUILT. VERIFY ALL CONDITIONS TO INSURE AGAINST CHANGES THAT WILL RESULT IN EXTRA CHARGES TO YOU.
REVIEWED BY:__________________________ APPROVED BY:______________________________ DATE:___________
Pyatt Builders
Scale: NTS Date: 5/8/18 Drawn By: K. Bronnenberg
Model
Austin
Notes:
1) Valley trusses are designed to sit on sheathing.
2) Installation of all temporary and permanent braces is essential.
See truss drawings, BCSI-1 Building Component Safety information
and building designers requirements.
3) Provide solid bearing for beams and girders. See Code and/or
building deigners requirements.
4) Truss are NOT designed to be field modified unless noted
otherwise. If any alterations are to be considered ALWAYS consult
a qualified truss designer or engineer BEFORE making any alterations.
5) Add/remove overhangs as needed.
Multi-Ply Girder Truss:
See drawing of multi-ply girders for fastening pattern to connect plys
so they act as one. All plys must be fastened together before supported
trusses or framing is attached to girders.
Hangers:
Install all hangers per manufacturers requirements.