Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A200.0 SECOND FLOOR FRAMING
2'4" 2'4" 2'4" 2'6" 2'6" 3060 S/H 3060 S/H 3060 S/H 2'4" 8" 8" HALL BATH BATH #4 BEDROOM #3 BEDROOM #2 GAMEROOM DN OPEN TO BELOW 12'-2 1/2" 8'-8 1/2" 3'-9" 1'-8 1/2" 6'-8 1/2" 5'-0" 23'-10 1/2" 4" 3'-1" 4" 14'-9" 4'-0 1/2" 3'-10 1/2" 6'-6 1/2" 5'-6" 3'-7" 8'-3" 15'-7 1/2" 1'-0" 15'-4" 21'-4 1/2" 36'-8 1/2" 30'-0 1/2" 42'-3" 36'-8 1/2" 15'-4" 21'-4 1/2" 4'-9" 5'-6" 5'-1" 14'-6" 6'-10 1/2" 6" 3060 S/H 3060 S/H 3060 S/H 3060 S/H 8'-0" 13'-6 1/2" 12'-2 1/2" 14'-1" 14'-9" 2 4'-4 1/2" 5 4'-7 1/2" 4'-7" 2'4" W.I.C. W.I.C. A 5.01 11'-7" 5'-0" 5 1/2" 22'-8" 7" 9'-8" HVAC R/A 42'-3" Sheet Information Copyright © 2017, (2017) The Drees Company. All Rights Reserved. 900 EAST 96TH STREET, SUITE 100, INDIANAPOLIS, IN 46240 PHONE: [317] 347-7300 RESIDENCE FOR: House Name: Series: Plan No.: Job Number: Drawing Date: Coord Name: Coord Phone: Drawing Scale: 1/8" = 1'0" Drawn By: 2.02F BAN 14296 DUFTON COURT ALBANY PLACE ALB-0037-00 04/23/2018 MELLISA P. SERIES_NM PLAN_NM 859-578-4290 the CRESTWOOD SSP Elevation "B" Second Floor Framing Plan Key Notes: General Notes: REFER TO SHEET 2.02S FOR STRUCTURAL INFORMATION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 DO NOT LOCATE TRUSS ABOVE PLUMBING WALL. FRAME TOP OF WINDOW AT 2'-0 1/4" DOWN FROM CEILING. 21 TOP OF OPENING AT 8'-1" A.F.F. 22 23 1. REFER TO SHEET 0N.1 FOR GENERAL NOTES. 2. ALL SECOND FLOOR CEILINGS TO BE 9'-1" ABOVE SUBFLOOR UNLESS OTHERWISE NOTED 3. FRAME TOP OF ALL WINDOWS AT 1'-0 1/4" BELOW TOP OF PLATE UNLESS OTHERWISE NOTED. 4. ALL DROPPED, INTERIOR HEADERS (FALSE AND BEARING) ARE DROPPED 1'-0" FROM CEILING UNLESS CALCULATIONS REQUIRE LARGER HEADERS. 5. REFER TO SELECTION SHEETS FOR FLOORING MATERIAL PRIOR TO CONSTRUCTING STAIRS TO DETERMINE RISER HEIGHTS. -- REFER TO SPECIFICATIONS - HOLD TOP OF WALL EVEN WITH STAIR STRINGER 05/18/18 William Hohlt