Loading...
HomeMy WebLinkAbout233JGB - Truss Placement Guide8-06-00 TOP 8-06-00 TOP 8-06-00 TOP 8-06-00 TOP 8-06-00 TOP HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 HTU26 10-01-02 TOP 10-01-02 TOB Framer to build wall with window in front of truss vertical in the field. Framer to build in RO as needed in the field. GE01 TG01 GE02 T02 GE03 T04 GE04 T06 T17 GE05 GE06 T09 GE07 GE07 GE08 T11 TG02 TG03 T13 GE09 GE10 GE10 GE09 V01 V02 V03 V04 V05 V06 V07 V08 V09 V10 V12 V13 V14 V15 V16 V17 V18 V19 GE11 V20 V21 V22 GE12 V23 PBE01 PBE02 PBE03 PB04 PBE04 T01(2) T03(5) T05(2) T05(4) T12(3) T14(3) T14(3) T15(3) PB02(16) PB03(4) PB01(7) T10(3) PB05(8) T09(2) T08(8) T07(5) T16(2) 2 4-00-00 14-07-00 12-05-00 2-11-00 27-00-00 22-08-00 33-07-00 17-11-00 16-00-00 18-00-00 21-03-00 47-08-00 9-00-00 5-04-00 22-04-00 17-06-04 11-06-08 18-08-08 17-04-08 3-02-12 1-04-00 1-01-12 1-01-12 IRC 2003 TPI 2002 20TLL - 10TDL - 10BDL Wedgewood Building Company Perin Residence 233 Bridgemont at Jackson's Grant 1/4"=1' May 7, 2018 PH B18801460 CUSTOMER: LOCATION: MODEL: JOB #: DATE: DESIGNER: DESIGN INFORMATION: SCALE: 9028 Old SR 67 South Mooresville, IN 46158 (317) 834-5380 Truss Placement Guide 1) This layout is intended for the purpose of truss location and placement only. Refer to the building plans for actual building construction. 2) All dimensions shown 00-00-00 are in feet-inches-sixteenths. 3) Trusses are spaced 24" on center unless otherwise noted. 4) Do not cut or modify trusses. 5) Refer to the individual truss design drawings for the location of member bracing, uplift and truss end reactions. 6) Installation of all temporary and permanent bracing is essential. See truss drawings, BCSI-B2 Summary Sheet and building designer requirements. 7) Non-bearing walls may not be shown on layout. Left end of truss, as shown on engineering drawing, is indicated by the triangle symbol