HomeMy WebLinkAbout233JGB - Truss Placement Guide8-06-00 TOP
8-06-00 TOP
8-06-00 TOP
8-06-00 TOP
8-06-00 TOP
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
HTU26
10-01-02 TOP
10-01-02 TOB
Framer to build wall with window in front of truss vertical in the field.
Framer to build in RO as
needed in the field.
GE01
TG01
GE02
T02
GE03
T04
GE04
T06
T17
GE05
GE06
T09
GE07
GE07
GE08
T11
TG02
TG03
T13
GE09
GE10
GE10
GE09
V01
V02
V03
V04
V05
V06
V07
V08
V09
V10
V12
V13
V14
V15
V16
V17
V18
V19
GE11
V20
V21
V22
GE12
V23
PBE01
PBE02
PBE03
PB04
PBE04
T01(2)
T03(5)
T05(2)
T05(4)
T12(3)
T14(3)
T14(3)
T15(3)
PB02(16)
PB03(4)
PB01(7)
T10(3)
PB05(8)
T09(2)
T08(8)
T07(5) T16(2)
2
4-00-00 14-07-00 12-05-00 2-11-00
27-00-00 22-08-00 33-07-00
17-11-00 16-00-00 18-00-00
21-03-00 47-08-00 9-00-00 5-04-00
22-04-00
17-06-04
11-06-08
18-08-08
17-04-08
3-02-12
1-04-00 1-01-12
1-01-12
IRC 2003
TPI 2002 20TLL - 10TDL - 10BDL
Wedgewood Building Company
Perin Residence
233 Bridgemont at Jackson's Grant
1/4"=1'
May 7, 2018
PH
B18801460
CUSTOMER:
LOCATION:
MODEL:
JOB #:
DATE:
DESIGNER: DESIGN INFORMATION: SCALE:
9028 Old SR 67 South
Mooresville, IN 46158
(317) 834-5380
Truss Placement Guide
1) This layout is intended for the purpose of truss location
and placement only. Refer to the building plans for actual
building construction.
2) All dimensions shown 00-00-00 are in feet-inches-sixteenths.
3) Trusses are spaced 24" on center unless otherwise noted.
4) Do not cut or modify trusses.
5) Refer to the individual truss design drawings for the location
of member bracing, uplift and truss end reactions.
6) Installation of all temporary and permanent bracing is
essential. See truss drawings, BCSI-B2 Summary Sheet
and building designer requirements.
7) Non-bearing walls may not be shown on layout.
Left end of truss, as shown on engineering
drawing, is indicated by the triangle symbol