Loading...
HomeMy WebLinkAboutDebra J Smith S 066-87New Facilities for: DEBRA J. SMITH Interior Design 4629 orthwestern Dr. Zionsville, In. 46077 W. 106th ST. OL \ a► PA LOT 10 N STERN EXIST IN(x r, O V . 0 FIRE HYQRANTQI O y N� I W. 96th ST ", 3 2 COLLEGE d 3 G PARK tr' 4 3 IL tu AREA, PLAN-(,,, a � s'a-r�.cicpttt i o v 4*� PERF" P`fft10 r R b e o '� ° tiTAS?it b Rpt ►c 0 SEPTIC TILE r1FT 1 SkIAE 1 SL RF4CE '\ ` '� BINDER- .'., *+ � • • � � � . O A ° • :' 46 53 STONE 0 _'d c7.' 2 STONE ASPHALT PAVIN(x DETAIL I -mom k v71 " ASFHtaLT SER+cE QItIY!!g± 3 5-10N COND6N5IN6 ril t3N 4101 '30VI a 9 tNA r F R LINE O UNDER 7REET k TAP Pt= R Q► ' LOCAL COOL'5 use o' `Y1 1,rF{L a 3 I W 'r 4 J`. At T '� . 1R� El 4_ I I notes. `i 1. Soil Clasification - BROOKSTON CROSBY 2. PARKING CALCULATION: 561 s.f. warehouse area @ 400 s.f./ parking space = 1.4 spaces :: USE 2 SPACES 2239 s.f. office area @ 200 s.f./ parking space = 11.2 spaces :: USE 12 SPACES TOTAL PARKING SPACES REQUIRED 12.6 USE 14 3. SEPTIC FIELD CALCULATION: Method 1. 5 employees @ 15 gal./day = 75 gal./day 75 gal./day x 2.5 perc. coefficient = 187.5s.f. 187.5 s.f. - 3'wide= 63 ft. field required. Method 2. 2,800 s.f. x 0.1 gal./day = 280 gal./day 280 gal./day x 2.5 perc. coefficient = 700 s.f. 700 s.f. t 3' wide = 233 l.f. required. DESIGN BASED ON METHOD 2. 4. Legal Drain on Northwestern Drive is shown shaded. EROSION CONTROL: A temporary seeding mixture in the areas of where stripping of fills have been graded shall be seeded for silt erosion protection. After grading all construction areas are to be seeded as follows: A. Swale seeding: Seed and fertilize within construction limits with 5#/Acre "Redtop" grass, 20#/Acre "Rye Grass", 20#/Acre "Blue ggrass 25#/Acre Fescue and 600#/Acre 12-12-12 Fertilizer. B. Cut/Fill Seedingg Along Paved Areas): Seed and fertilizewith 25#/Acre "Fescue" ZOO/Acre "Rye Grass", 15#/Acre "Bluegrass and 600#/Acre 12-12-12 fertilizer. C. Seeded areas shall have a suitable mulch applied for EROSION AND SILT CONTROL. Mulch may be straw, shredded hardwood or erosion control mat. D. Contractor's Option: Construction Areas requiring Erosion Control may be Hydroseeded in accordance with above Seed and Fertilizer Specifications. /y'PLANTING SCHEDULE 9 each Spirea required private hedge, 4 each Upright Yews Evergreen required, install Blue Rug .Juniper in area east of service drive between building and drainage swale. ,r index of drawings W 17 SHEET #1 SITE, PLAN ).D ACRE SST #2 FOUNDATION PLAN 3 S� g Zi , FLOOR PLAN FRONT ELEVATION rzcu 4 rre SHEET #5 SHEET #6 REAR ELEVATION I notes. `i 1. Soil Clasification - BROOKSTON CROSBY 2. PARKING CALCULATION: 561 s.f. warehouse area @ 400 s.f./ parking space = 1.4 spaces :: USE 2 SPACES 2239 s.f. office area @ 200 s.f./ parking space = 11.2 spaces :: USE 12 SPACES TOTAL PARKING SPACES REQUIRED 12.6 USE 14 3. SEPTIC FIELD CALCULATION: Method 1. 5 employees @ 15 gal./day = 75 gal./day 75 gal./day x 2.5 perc. coefficient = 187.5s.f. 187.5 s.f. - 3'wide= 63 ft. field required. Method 2. 2,800 s.f. x 0.1 gal./day = 280 gal./day 280 gal./day x 2.5 perc. coefficient = 700 s.f. 700 s.f. t 3' wide = 233 l.f. required. DESIGN BASED ON METHOD 2. 4. Legal Drain on Northwestern Drive is shown shaded. EROSION CONTROL: A temporary seeding mixture in the areas of where stripping of fills have been graded shall be seeded for silt erosion protection. After grading all construction areas are to be seeded as follows: A. Swale seeding: Seed and fertilize within construction limits with 5#/Acre "Redtop" grass, 20#/Acre "Rye Grass", 20#/Acre "Blue ggrass 25#/Acre Fescue and 600#/Acre 12-12-12 Fertilizer. B. Cut/Fill Seedingg Along Paved Areas): Seed and fertilizewith 25#/Acre "Fescue" ZOO/Acre "Rye Grass", 15#/Acre "Bluegrass and 600#/Acre 12-12-12 fertilizer. C. Seeded areas shall have a suitable mulch applied for EROSION AND SILT CONTROL. Mulch may be straw, shredded hardwood or erosion control mat. D. Contractor's Option: Construction Areas requiring Erosion Control may be Hydroseeded in accordance with above Seed and Fertilizer Specifications. /y'PLANTING SCHEDULE 9 each Spirea required private hedge, 4 each Upright Yews Evergreen required, install Blue Rug .Juniper in area east of service drive between building and drainage swale. ,r index of drawings 17 SHEET #1 SITE, PLAN SST #2 FOUNDATION PLAN RELEASED FOR CONSTRUCTION SHEET #3 SREET #4 FLOOR PLAN FRONT ELEVATION rzcu 4 rre SHEET #5 SHEET #6 REAR ELEVATION OF COMM SIDE ELEVATIONS P ``41TY DEVELOPMENT CITE � �, RMEL INDIANA SHEET #7 SECTIONS SHEET #8 ROOF FRAMING PLAN (844) 643,E SHEET #9 MECHANICAL PLAN 1A, L� SHEET#10 ELECTRICAL PLAN A TITLE . O "°>(,•r ¢, SITE Pi,AN DLA PROJECT PROJECT I„ OCAT ION #,•.,..� C.M.A* fii 10 4/27/87 RAPPAMETfff• PARK NORTHWESTERN � general contractors CARMEL, i ti . ,,, M �R DATE : DRAWING PREPAIRED FOR: Si,� P ; r . CORnORATIONAEVI$IONS Debra .1. Smith ! ft 01. 4" � ? � �` ,"; a lro�c 61 t • do :vile In 4077 Interior Design g �� e 3/8 7 • A V W } PT N 13" 3%" STROKE--�;y ...1V 2"DEFP "�.._ !, ," [ F' L Alf- Y' 1 r% � f 4.� IN i5 FRONT Elevation 0 S� b --AGNT GRAY zSlDING-- `o./WITE SEMI TR.A14SPARF—WT STAIN „.New Facilities for: DEBRA J. SMITH Interior Design o LVJ 4629 Northwestern Dr. Zionsville, In. 46077 Seuage Ol�nocal tyctnm tpbelfleat ion ® ! /C i. Required absorption field systema W, 106th ST. a. 3' wde trench (see cross section) o. B' minimum spacing -center of the to center of the C.300 Iln, feet plus O feet end loops of absorption line X 2• 15oOgal• septic tank minimum with access riser PARK - m 10 `EX1' TiP+ice 3. Soil pipe specifications: a. 4” ASTM -D 1785 Schedule 40 solid plastic Insldo line, from ^f NORTHWESTERN. } RE HYDRANT building to tank and from tank to first distribution box. > �f t{ C�3 p b. 4" sealed plastic pipe (ASTM -0 3034) from distribution box to U) y dlstrlbution Dox and from distribution box to absorption field. ' t UWj C. All Hamilton County and State of Indiana Standards to apply. Q' "Al \tb GENERAL NOTES: ��\ _..i_ W. 96th ST. ) 3 1. After system is Instal led and before backfilling, the Uff {ce of ricm Cq- -h - 1-465 Bruce Hamilton of Hamilton County Health COLLEGE Department (773-0132) will be called for final Inspections. \ACL Request for "Final Inspection" will require a 24 hour notice to PARK 1 1; the above offices. �' 2. Construction of septic system will be done when the soils aro � 4 dry. OQ i \ 3. System as designed and shown Is done with the Intention of the system being installed at minimum depths, 4. No clev fill material will be placed over absorption field. W. 86th ST_ Natural ground line to remain as much as possible. P N 5. Finish grading over absorption field will be done to obtain - positive surface drainage away from field. Any finish grading done In area of absorption field will be done with light 3 equipment. AREA PLAN 6. No construction traffic to be allowed In area of absorption- }leld. 1 I 7. All :;sorption field fingers to be placed at minimum dopths to keepsystem In more r. q'' -F L0 Y permeable soils. 8. Existing contour lines shown shou I d be ver I f I ed before AS P N A LT SE Rv 1 E D R.1 v It o construction begins. Design shown Is based on contours shown, / �• 1 Y CONAENSINL N q 1N i L0%-ZWV,lO { SOIL TYPE IN AREA Of ABSORPTION FIELD IS 'BPGYJt'J7OiV/Cko�F3Y r. I A — 3 ab /i -E� nom:' 100-51 innATFR LINF_</ 3 ST,FtE n I', �, �� UNDER F i"- / W ----- b✓ V/ t W' - --t� . CAL G E r '( ° � 1 Vi t` ° T F, ri,� iYf i-� W ) I F +s`� SII / �. A t ry 7 , fX. FI � 1, 0 OZ >1 X c am>a 4 _ 3 , C 99 995 �.4"SOLID Pvc I,/EAF.-H FKKFL A r W 1 0 a„ Cl) 1 � f• - M.M1. A' I � r s LOT 0 v � W cion., E• , SL R -FACE ' 31NQ1-F?- 4+ 53 STO N E �q SONE \ r- FINISH GRADE =bn= — EARTH BACKFILL EzISTIr,G WIA'„i PROJECT LOCATION LOT 10 PARK NORTHWFSTERN CARMFI. , i .A . ,�-�-x_11-.�.� Fu+uSn GRADE DRAWING PREPAIRED FOR: Debra J. Smith Interior Design REVISIONS d 4 y��_ ' • �fRATEO 61L.DuvG w •L CA,HSE vASira QW EL ' i PERFORATED PvC <; E P-1 ��� CETAiL 4 ab /i -E� nom:' 100-51 innATFR LINF_</ 3 ST,FtE n I', �, �� UNDER F i"- / W ----- b✓ V/ t W' - --t� . CAL G E r '( ° � 1 Vi t` ° T F, ri,� iYf i-� W ) I F +s`� SII / �. A t ry 7 , fX. FI � 1, 0 OZ >1 X c am>a 4 _ 3 , C 99 995 �.4"SOLID Pvc I,/EAF.-H FKKFL A r W 1 0 a„ Cl) 1 � f• - M.M1. A' I � r s LOT 0 v � W cion., E• , SL R -FACE ' 31NQ1-F?- 4+ 53 STO N E �q SONE \ r- FINISH GRADE =bn= — EARTH BACKFILL --- FENCE WA"5 To 4 x4__ -A -KT D. C(•?�Jfl �, PAtt-�iRN z xe �ATe rdks b, (NC,— <t- t�WK FOR GLAcRtTY) x?' cCA i{ FENCE BOARiC 7_ -To- LM SCAT tN d --- CONIC. P7iA C { Z x4R cc -A iRTA - 80"00A 1� 10'1t40 - _._v MINT rt 4"C.ONC• SLAI5 _ 4//(rX 4/I CKI t4? wtr. Wlc)c]fM TO its notes. 1. Soil Clasification - BROOKSTON CROSBY 2. PARKING CALCULATION: 561,s.f. warehouse area @ 400 s.f./ parking space 1.4 spaces :: USE 2 SPACES 2239 s.f. office area @ 200 s.f./ parking space = 11.2 spaces :: USE 12 SPACES TOTAL PARKING SPACES REQUIRED 12.6 USE 14 3. SEPTII! FIELD CALCULATION: Method 1. 5 employees @ 15 gal./day = 75 gal./day 75 gal./day x 2.5 perc. coefficient = 187.5s.f. 187.5 s.f. t 3'wide= 63 ft. field required. Method 2. 2,800 s.f. x 0.1 gal./day = 280 gal./day 280 gal./day x 2.5 perc. coefficient = 700 s.f. 700 s.f. - 3' wide = 233 l.f. required. DESIGN BASED ON METHOD 2. 4. Legal Drain on Northwestern Drive is shown shaded. EROSION CONTROL: A temporary seeding mixture in the areas of where stripping of fills have been graded shall be seeded for silt erosion protection. After grading all construction areas are to be seeded as follows: A. Swale seeding: Seed and fertilize within construction limits with 5#/Acre ItRedtop" grass, 20#/Acre "Rye Grass", 2041/Acre "Blue- grass", 25#/Acre "Fescue" and 60041/Acre 12-12-12 Fertilizer. B. Cut/Fill Seedingg Along Paved Areas): Seed and fertilize with 25#/Acre "Fescue" 204/Acre "Rye Grass", 1541/Acre "Bluegrass" and 600#/Acre 12-12-12 fertilizer. C. Seeded areas shall have a suitable mulch applied for EROSION AND SILT CONTROL. Mulch may be straw, shredded hardwood or erosion control mat. D. Contractor's Option: Construction Areas requiring Erosion Control may be Hydroseeded in accordance with above Seed and Fertilizer Specifications. 3'PLANTING SCHEDULE 9 each Spirea required private hedge, 4 each Upright Yews Evergreen required, install Blue Rug Juniper in area east of service drive between building and drainage swale. ` p4 1 ) 1 el tl c _ C.M.A. r general contractors Site Plan. P � \, ifp.o. COR ORATION 30'- Obox 612 ► z1onsville, In. 460T7 a index of drawings SHEET #1 SITE PLAN SHEET #2 FOUNDATION PLAN SHEET #3 FLOOR PLAN SHEET #4 FRONT ELEVATION SHEET #5 REAR ELEVATION SHEET #6 SIDE ELEVATIONS SHEET #7 SECTIONS SHEET #8 ROOF FRAMING PLAN SHEET #9 MECHANICAL PLAN SHEET#10 ELECTRICAL PLAN SITF. 1)1,AN err "Lw COURSE WASHED GRAVEL (' (' � t Sty,• ..,«. Imo, r« � " I " q PERFORAYCD PLASTIC PIPE PROJECT LOCATION LOT 10 PARK NORTHWFSTERN CARMFI. , i .A . ,�-�-x_11-.�.� APPROVED BY • IRIGID) DRAWING PREPAIRED FOR: Debra J. Smith Interior Design REVISIONS --- FENCE WA"5 To 4 x4__ -A -KT D. C(•?�Jfl �, PAtt-�iRN z xe �ATe rdks b, (NC,— <t- t�WK FOR GLAcRtTY) x?' cCA i{ FENCE BOARiC 7_ -To- LM SCAT tN d --- CONIC. P7iA C { Z x4R cc -A iRTA - 80"00A 1� 10'1t40 - _._v MINT rt 4"C.ONC• SLAI5 _ 4//(rX 4/I CKI t4? wtr. Wlc)c]fM TO its notes. 1. Soil Clasification - BROOKSTON CROSBY 2. PARKING CALCULATION: 561,s.f. warehouse area @ 400 s.f./ parking space 1.4 spaces :: USE 2 SPACES 2239 s.f. office area @ 200 s.f./ parking space = 11.2 spaces :: USE 12 SPACES TOTAL PARKING SPACES REQUIRED 12.6 USE 14 3. SEPTII! FIELD CALCULATION: Method 1. 5 employees @ 15 gal./day = 75 gal./day 75 gal./day x 2.5 perc. coefficient = 187.5s.f. 187.5 s.f. t 3'wide= 63 ft. field required. Method 2. 2,800 s.f. x 0.1 gal./day = 280 gal./day 280 gal./day x 2.5 perc. coefficient = 700 s.f. 700 s.f. - 3' wide = 233 l.f. required. DESIGN BASED ON METHOD 2. 4. Legal Drain on Northwestern Drive is shown shaded. EROSION CONTROL: A temporary seeding mixture in the areas of where stripping of fills have been graded shall be seeded for silt erosion protection. After grading all construction areas are to be seeded as follows: A. Swale seeding: Seed and fertilize within construction limits with 5#/Acre ItRedtop" grass, 20#/Acre "Rye Grass", 2041/Acre "Blue- grass", 25#/Acre "Fescue" and 60041/Acre 12-12-12 Fertilizer. B. Cut/Fill Seedingg Along Paved Areas): Seed and fertilize with 25#/Acre "Fescue" 204/Acre "Rye Grass", 1541/Acre "Bluegrass" and 600#/Acre 12-12-12 fertilizer. C. Seeded areas shall have a suitable mulch applied for EROSION AND SILT CONTROL. Mulch may be straw, shredded hardwood or erosion control mat. D. Contractor's Option: Construction Areas requiring Erosion Control may be Hydroseeded in accordance with above Seed and Fertilizer Specifications. 3'PLANTING SCHEDULE 9 each Spirea required private hedge, 4 each Upright Yews Evergreen required, install Blue Rug Juniper in area east of service drive between building and drainage swale. ` p4 1 ) 1 el tl c _ C.M.A. r general contractors Site Plan. P � \, ifp.o. COR ORATION 30'- Obox 612 ► z1onsville, In. 460T7 a index of drawings SHEET #1 SITE PLAN SHEET #2 FOUNDATION PLAN SHEET #3 FLOOR PLAN SHEET #4 FRONT ELEVATION SHEET #5 REAR ELEVATION SHEET #6 SIDE ELEVATIONS SHEET #7 SECTIONS SHEET #8 ROOF FRAMING PLAN SHEET #9 MECHANICAL PLAN SHEET#10 ELECTRICAL PLAN SITF. 1)1,AN DRAWN BY: DLA PROJECT LOCATION LOT 10 PARK NORTHWFSTERN CARMFI. , i .A . DA 4/27/87 APPROVED BY • DATE DRAWING PREPAIRED FOR: Debra J. Smith Interior Design REVISIONS -/3/87 ' . i