u`"''' CITY OF CARMEL, INDIANA VENDOR: 371561
`"/ CHECK AMOUNT: $***127,912.50*
.;; � r ONE CIVIC SQUARE WHITE CONSTRUCTION, INC.
f. ?� CARMEL, INDIANA 46032 3900 E.WHITE AVENUE CHECK NUMBER: 325606
9M,�roN. CLINTON IN 47842 CHECK DATE: 05/23/18
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
900 4462870 101438 1 127,912.50 3/7/18 CONTRACT; 108
VOUCHER NO. WARRANT NO. Prescribed by State Board of Accounts City Form No.201(Rev.1995)
vendor# 371561 ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
WHITE CONSTRUCTION, INC. IN SUM OF$ CITY OF CARMEL
3900 E. WHITE AVENUE An invoice or bill to be property itemized must show:kind of service,where performed,dates service
rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
CLINTON, IN 47842
Payee
$127,912.50
Purchase Order#
ON ACCOUNT OF APPROPRIATION FOR
Terms
Engineerinq
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
101438 1 44-628.70 $127,912.50 1 hereby certify that the attached invoice(s),or 4/27/18 1 City Center Drive and 3rd Ave SW RAB- $127,912.50
2200 900 2200 900 Community Crossing Grant
bill(s)is(are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Wednesday, May 16,2018
Jeremy Kashman
Director
I hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
,20—
Clerk-Treasurer
20Clerk-Treasurer
CITY OF CARMEL
PROJECT NO. 16-ENG-108
City Center Drive and 3rd Avenue SW RAB
Progress Estimate Summary Sheet a Signature Page
P.O. 10143S6
C0-y%rr,.X,:+y cr-O.ssirs lgrw,t
Progress Estimate No 1 g o o - 44 V2%I-0
Partial x
Final
Earned to date $ 142,125.00
Previous payments $ -
Earnings this estimate $ 142,125.00
Retainage $ 14,212.50
Amount due Contractor $ 127,912.50
CONTRACTOR: / � �-� DATE: y�-7 I
White Construction Phone: (800)355-9401
3900 East Whilte Avenue, PO Box 249 Fax: (765)832-2075
Clinton, IN 47842
1-r�jL)
CONSULTANT: DATE: 4
AMERICAN STRUCfUREPOINT, INC. Phone: (317) 547-5580
7260 Shadeland Station Fax: (317)543-0270
Indianapolis, Indiana 46256.3957
APPROVED BY: DATE: 5yY-1b
CITY OF CA L
Report logo American Structurepoint, Inc.
Payment Invoice
16-ENG-108 - City Center Drive and 3rd Avenue SW RAB
Description The existing signalized intersection will be reconstructed to a multi-lane roundabout. The project
construction will include reconstructing the median and outside Curb lines for a multi-lane roundabout.
The asphalt pavement will be milled and reconstructed as needed for the roundabout intersection.
Additionally the pedestrian facilities adjacent to the vehicular travel lanes will be altered to improve
pedestrian safety and mobility. The existing storm water system will be-reconstructed as needed for the
intersection improvements. Additional lighting will be installed for the roundabout intersection. The
private drives located within the limits of the intersection reconstruction will be replaced. Streetscape
improvements along 3rd Avenue SW and around the roundabout will be constructed. Access to
properties within the project limits will be maintained during construction.
Payment Number I
Pay Period 03/09/2018 to 04/18/2018
Prime Contractor White Construction
3900 East WhUte Avenue,PO Box 249
Clinton,IN 47842
Payment Status Approved
Awarded Project Amount $3,288,270.00
Authorized Amount $3,288,270.00
tiori:.l Desc i
on :.
Sec
0001 0001 LS 0.100 $150,000.000 $15,000.00
CONSTRUCTION ENGINEERING
0002 0002 LS 1.000 $100,000.000 $100,000.00
MOBILIZATION AND DEMOBILIZATION
0011 0011 EACH 4.000 $700.000 $2,800.00
SIGNAL POLE,REMOVE
0076 0076 EACH 8.000 $100.000 $800.00
CONSTRUCTION SIGN,A
0087 0087 EACH 1.000 $1,400.000 $1,400.00
Project Totai:$142,125.00
Payment Invoice: 04/26/2018
16-ENG-108-City Center Drive and 3rd Avenue SW RAB Page 1 of 2
17 49.E 1�3
{+C
TRAFFIC SIGNAL EQUIPMENT, REMOVE
0163 0163 LFT 129.000 $90.000 511,610.00
12" DUCTILE IRON WATER MAIN
0164 0164 LFT 1.000 $65.000 $65.00
8"DUCTILE IRON WATER MAIN
0165 0165 LFT 129.000 $50.000 $6,450.00
STRUCTURE BACKFILL
0167 0167 EACH 1.000 $2,500.000 $2,500.00
12"GATE VALVE
0168 0168 EACH 1.000 $1,500.000 $1,500.00
8"GATE VALVE
Section Total:$142,125.00
Project Total:$142,125.00
Summary
Current Approved Work: $142,125.00 Approved Work To Date: $142,125.00
Current Stockpile Advancement: $0.00 Stockpile Advancement To Date: $0.00
Current Stockpile Recovery: $0.00 Stockpile Recovery To Date: $0.00
Current Retainage: $14,212.50 Retainage To Date: $14,212.50
Current Retainage Released: $0.00 Retainage Released To Date: $0.00
Current Liquidated Damages: $0.00 Liquidated Damages To Date: $0.00
Current Adjustment: $0.00 Adjustments To Date: $0.00
Current Payment: $127,912.50 Payments To Date: $127,912.50
Previous Payment: $0.00 Previous Payments To Date: $0.00
Payment Invoice: 04/26/2018
16-ENG-108-City Center Drive and 3rd Avenue SW RAB Page 2 of 2