Loading...
HomeMy WebLinkAboutAmerican Structurepoint, Inc/Eng/Adl Serv #35/122,100/Traffic Impact Study of 96th Street and Springmill Road Development American Structurepoint,Inc. Engineering Department-2018 1�O V Appropriation#43-401.00 Fund;P.O.#101672 .z Contract Not To Exceed$122,100.00 .a1Rfl ADDITIONAL SERVICES AMENDMENT TO AGREEMENT FOR PROFESSIONAL SERVICES THIS AMENDMENT TO THE AGREEMENT FOR PROFESSIONAL SERVICES ("Agreement') entered into by and between the City of Carmel and American Structurepoint, Inc. (the "Professional"), as City Contract dated April 6, 2016 shall amend the terms of the Agreement by adding the additional services to be provided by Professional consistent with the Scope of Work attached hereto and incorporated herein as Exhibit "A". The terms and conditions of the Agreement shall not otherwise be affected by this Additional Services Amendment and shall remain in full force and effect. IN WITNESS WHEREOF,the parties hereto have made and executed this Amendment as follows: CITY OF CARMEL, INDIANA American Structurepoint, Inc. by and through its Board of Public Works and Safety By: By: k (.., f- 145ert-1-- 4_4' E 4./t/ James Brainard, Presiding Officer Authorized Signature D te: Printed Name Mary A Burke, Memb Date: Estckf;v-i Viz 7 <'cfiAli-- Title / Lori S.Wat �en)ber/ FID/TIN: _r5�—/I e77 3/7 Date: // r2 /A Last Four of SSN if Sole Proprietor: L/ ATT r Date: 5-.2-/- 2oi hristine Pauley, Clerk-'Lreasur,r/ /` Date: V IS:VCaotrad,Prof Svcs it Goods SveslEopleerie0011Mcericao Slr.niepoaL Inc ASA X35.0s5RIR0111 11:19 A.\If Proj-ec4 1 $HS III AMERICAN ■ STRUCTUREPOINT ■ May 11,2018 Mr.Jeremy Kashman City of Carmel 1 Civic Square Cannel,Indiana 46032 Re: Fee Proposal for Traffic Impact Study of 96th Street& Springmill Rd Development Dear Jeremy: Thank you for giving American Structurepoint,Inc.,the opportunity to provide you with our proposal for a traffic impact study for the proposed development located at the intersection of 96t Street& Springmill Road in Carmel, Indiana. Per your request and our discussion at the meeting on April 19, 2018, below is our understanding on the scope of services needed for this study. PROJECT UNDERSTANDING The development site is located in the City of Carmel as depicted in the figure below. This site will be developed to include a blend of office and medical office land uses, per the rezoning packet submitted at the April 17,2018 Plan Commission Meeting.Construction of the development is expected to begin in the near future. r.106 • f _Y d ems} c Ssirk a< 11.` ...` : exhibit 2018.00981 i v� 7Z60."Tha{1oland Stakion,!nit lnapolts,Indiana 46256 TEl.317.SS47.5580 FAX 317,543.0270 ,w,n.vstrrlclitrepoint,cior1I 0 AMERICAN STRUCTUREPOINT, INC. Mr.Jeremy Kashman Page 2 May 11,2018 STUDY LIMITS This project is limited to the intersections listed in Table 1. Table 1: Study Intersections Study Intersections Stud) Intersections l 96th & Ditch I lllinoi & 106th 2 96th & Spring Mill I I ( 1)rin12 Alill & 91st 3 96th &Meridian 12 Meridian&I465 WB 4 96th& Penns>lvania 13 Meridian & 1465 EB 5 96th&College j 14 96th St& West Driveway 6 Spring Mill & Driveway 15 96th St& East Driveway 7 Spring Mill&Illinois L 16 106TH St&US 31 SB J 8 Spring Mill & 106th j 17 106TH St& US 31 NB 9 Spring Mill Rd&86th St 18 Ditch Rd&91s`St SCENARIOS This development is expected to consist of office and medical office building land uses; however the amount of each land use type is unknown as of the date of this proposal. Phased implementation of this development is expected, but time frames are also unknown. For these reasons, this study will evaluate the development in multiple years with three different land use scenarios(low,medium,and high densities),as listed in Table 2.This will allow a tiered system of infrastructure recommendations to be established. Densities and phasing of the development will be established through coordination with the City and the development team. Table 2: Scenarios Scenario Year Description 1 Existing ! Existing 2 Opening+10yrs ! No Build 3 Opening I Build Low Density 4 Opening+5yrs Build Low Density 5 Opening+ 10yrs Build Low Density 6 Opening Build Medium Density 7 Opening+5yrs Build Medium Density 8 Opening+ 10yrs Build Medium Density 9 Opening Build High Density 10 Opening+5yrs Build Iiigh Density 11 Opening+ 10yrs Build High Density Exhibit Zo ( 2018.00981 O AMERICAN STRUCTUREPOINT, INC. Mr.Jeremy Kashman Page 3 May 11,2018 STUDY APPROACH A. Traffic Counts 1. Peak-hour traffic volumes(6-hour counts)will be collected at the intersections listed in Table 1. B. Traffic Analysis 1. Trip end estimation for the development, including: i. Trip generation based on the ITE Trip Generation Handbook(current edition) ii. Estimating the amount of internal capture trips iii. Estimating the number of pass-by trips iv. Assigning trips to the roadway network based on trip distribution rates 2. Project background traffic volumes for the opening year and horizon year of the proposed development. Background growth rate(s) and trips associated with adjacent planned developments will be coordinated with the City's Planning Department. 3. Capacity analysis of the study intersections, excluding those of the US 31 & 106th Street and U 31 &I465 interchanges,for each of the scenarios listed above using deterministic methods(traffic simulations are a supplemental service) 4. Comparison of traffic projections of this study to those of the US 31 corridor study for the US 31 & 106th Street and US 31 &I465 interchanges to determine if capacity issues are likely in any of the scenarios listed in Table 2. 5. Evaluate the need for turn lanes along 96th Street at the development access points 6. Prepare a summary report documenting all study efforts,findings,and recommendations 7. Attend up to four coordination meetings with the City to discuss study findings and recommendations PROJECT DELIVERABLES& SCHEDULE All study efforts,findings,and recommendations will be summarized in a draft report to be delivered to the City for review within 60 days of receiving NTP.A final report will be issued to the Client within 21 days of receiving comments from the City. COMPENSATION Compensation for services rendered will be as indicated below and invoiced monthly on a percent-complete basis. Traffic Counts(Lump Sum) $10,000 Traffic Analysis&Documentation(Lump Sum) $108,200 Coordination Meetings—up to 4 meetings(Lump Sum) $3,900 Total $122,100 Full payment of invoices is due within 30 days from invoice date. If payment is not made within 30 days of the date when the payment is due, we may, at our option, and effective upon the delivery of written notice of our intention to do so,terminate the contract or suspend further performance of our services under the contract,and we shall have no liability for delay or damage that results from the termination of the contract or suspension of services. If the assumptions made in the scope of services relative to extent of work are found to change,you will be notified in writing and a new(extra or reduced) fee will be presented. However,we recognize that it may not always be Exhibit 2018.00981 o"(N`I 0 AMERICAN STRUCTUREPOINT, INC. Mr.Jeremy Kashman Page 4 May 11,2018 possible to provide written changes,as the City may need to request an immediate change or additional services, and the administrative delays could be detrimental and costly to the project. In such case,requests for additional services will be invoiced on a time and materials basis. SUPPLEMENTAL SERVICES The fees listed above represent the total scope of services as we understand it at this time. We do not anticipate the need for the following services, but we are available to provide them for a supplemental fee if such a need should arise: 1. Additional study intersections 2. Additional analysis scenarios 3. Collection of additional traffic counts 4. Analysis of roadway network/intersections internal to the development 5. Analysis of driveways internal to the development 6. Analysis of phased implementation of the development 7. Traffic simulations and simulation videos 8. Sight distance evaluations 9. Traffic signal warrant analysis 10. Substantial changes to the development plan occurring after NTP 11. Additional coordination and/or City Council meetings beyond the current scope 12. Opinion of probable construction cost for proposed off-site improvements 13. Conceptual design of improvements REIMBURSABLE EXPENSES The following expenses will be considered reimbursable and will be invoiced at 1.1 times their direct cost on the monthly invoices. A. Expenses of permit application fees or permit fees B. Courier service fees,overnight postage fees,and certified mailing fees C. Reproduction services for plans and specifications other than for normal interdisciplinary coordination D. Expense of renderings or models E. Mileage at current federal rate The services listed above represent the total scope of services as we understand them at this time.If the terms and conditions of this proposal meet with your approval,please send us an Agreement for our review and signature. We greatly appreciate this opportunity and look forward to working with you on this project. If you have any questions,please feel free to contact our office. Very truly yours, American Structurepoint, Inc. C.Ryan Huebschman,PE,PTOE Cash E.Canfield,PE Project Manager Executive Vice President CRH:CEC:abm Exhibit 2018.00981 0 INDIANA RETAIL TAX EXEMPT Page 1 of 1 Cityof firIIarinrie1 CERTIFICATE NO.0031201550020 PURCHASE ORDER NUMBER FEDERAL EXCISE TAX EXEMPT 101672 ONE CIVIC SQUARE 35-6000972 THIS NUMBER MUST APPEAR ON INVOICES,A/P CARMEL, INDIANA 46032-2584 VOUCHER,DELIVERY MEMO,PACKING SLIPS, SHIPPING LABELS AND ANY CORRESPONDENCE FORM APPROVED BY STATE BOARD OF ACCOUNTS FOR CITY OF CARMEL-1997 PURCHASE ORDER DATE DATE REQUIRED REQUISITION NO. VENDOR NO. DESCRIPTION 5/18/2018 00350562 Project 18-18;Contract Date 04.06.16 AMERICAN STRUCTURE POINT, INC City Engineering's Office VENDOR 7260 SHADELAND STATION SHIP 1 Civic Square TO Carmel, IN 46032- INDIANAPOLIS, IN 46256--3957 Kate Lustig PURCHASE ID BLANKET CONTRACT PAYMENT TERMS FREIGHT 26016 QUANTITY UNIT OF MEASURE DESCRIPTION UNIT PRICE EXTENSION Department: 2200 Fund: 2200 Motor Vehicle Highway Account: 43-401.00 1 Each ASA 35-Traffic Impact Study of 96th Street and Springmill $122,100.00 $122,100.00 Road Development Sub Total $122,100.00 a w , Send Invoice To: City Engineering's Office Kate Lustig 1 Civic Square ; Carmel, IN 46032- PLEASE INVOICE IN DUPLICATE DEPARTMENT ACCOUNT PROJECT PROJECT ACCOUNT AMOUNT PAYMENT $122,100.00 SHIPPING INSTRUCTIONS *A/P VOUCHER CANNOT BE APPROVED FOR PAYMENT UNLESS THE P.O. NUMBER IS MADE A PART OF THE VOUCHER AND EVERY INVOICE AND VOUCHER HAS THE PROPER SWORN `SHIP PREPAID. AFFIDAVIT ATTACHED. I HEREBY CERTIFY THAT THERE IS AN UNOBUGATED BALANCE IN *C.O.D.SHIPMENT CANNOT BE ACCEPTED. THIS APPROPRIATION SUFFICIENT TO PAY FOR THE ABOVE ORDER. PURCHASE ORDER NUMBER MUST APPEAR ON ALL SHIPPING LABEL � *THIS ORDER ISSUED IN COMPLIANCE WITH CHAPTER 99,ACTS 1945 AND ACTS AMENDATORY THEREOF AND SUPPLEMENT THERETO. ORDE RED BY Jeremy Kashman James Crider TITLE Director Administration CONTROL NO. 101672 CLERK-TREASURER