Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SOUTHILL A TRUSS LAYOUT
HUS26(6) 2x4 LEDGER (1) HUS26 2x4 NAILER 2x4 Nailer (10) HUS26 (9) HUS26 D2G K1G LG ZG Z1 D (5 ) D 1 (3 ) E (6 ) L(3)L1(7) Z ( 4 ) 62 - 0 0 - 0 0 1-00-00 18 - 0 0 - 0 0 1-04-00 4- 0 0 - 0 0 14-00-00 8-00-00 12-00-00 8-00-00 12-00-00 54-00-00 54-00-00 18-00-00 5-01-08 12 - 0 0 - 0 0 8- 0 0 - 0 0 7- 0 4 - 0 0 12 - 0 0 - 0 0 BG A2 A CG DGR FG F FGR KG DG V1 V2 V3 V4 V5 V6 V7 V8 V9 V10 PDGR PDG B(6)A1(10) C(6)C1(5) 11 - 0 0 - 0 0 28 - 0 0 - 0 0 43 - 0 0 - 0 0 1-04-00 1-08-00 36 - 0 0 - 0 0 4- 0 0 - 0 0 22-08-00 18-00-00 13-04-00 11 - 0 0 - 0 0 28 - 0 0 - 0 0 43 - 0 0 - 0 0 1-04-00 1-08-00 36 - 0 0 - 0 0 4- 0 0 - 0 0 4- 0 0 1- 1 0 - 0 8 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 4- 0 0 1- 0 8 - 0 0 1-04-00 1-05-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 1- 1 0 - 0 8 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 2- 0 0 - 0 0 1- 1 0 - 0 8 SHOP DRAWING APPROVAL THIS LAYOUT IS THE SOLE SOURCE FOR FABRICATION OF TRUSSES AND VOIDS ALL PREVIOUS ARCHITECTURAL OR OTHER TRUSS LAYOUTS. REVIEW AND APPROVAL OF THIS LAYOUT MUST BE RECEIVED BEFORE ANY TRUSSES WILL BE BUILT. VERIFY ALL CONDITIONS TO INSURE AGAINST CHANGES THAT WILL RESULT IN EXTRA CHARGES TO YOU. REVIEWED BY:__________________________ APPROVED BY:______________________________ DATE:___________ THIS IS A TRUSS PLACEMENT DIAGRAM ONLY.These trusses are designed as individual building components to be incorporated into the building design at the specification of the building designer. See individual design sheets for each truss design identified on the placement drawing. The building designer is responsible for temporary and permanent bracing of the roof and floor system and for the overall structure. The design of the truss support structure including headers, beams, walls, and columns is the responsibility of the building designer. For general guidance regarding bracing, consult "Bracing of Wood Trusses" available from the Truss Plate Institute, 583 D'Onifrio Drive; Madison, WI 53179. Floor Area: 0 Roof Area: 4024.55 Hip Lines: 6.1 Horizontal OH: 173.05 Rake OH: 228.23 Valley Lines: 93.61 Ridge Lines: 136.31 2702 North Tibbs Avenue Indianapolis, Indiana 46222Sales Rep: SOUTHILL A Subdivision: Order #: Job Name: 5/25/2018 Designer:Date: Model: Client: Lot #: