HomeMy WebLinkAboutA003THERMO-PLY SHEATHING
24" POLY FLASHING, TYPICAL
OVERLAP THERMO-PLY SHEATHING 2"
- TYPICAL
2x BLOCKING BETWEEN STUDS
- T/BLK'G TO ALIGN WITH T/ TOP
PLATE AT ADJACENT WALLS.
APPROVED ANCHOR THRU BOTH SHEETS OF
THERMO-PLY @ 3"o.c TYP.
- ANCHORS MUST PENETRATE BLOCKING 1"
MINIMUM.
8'
-
1
"
OR
9'
-
1
"
TO
SU
B
-
F
L
R
RE
F
E
R
TO
SE
C
T
I
O
N
S
HORIZONTAL SIDING OR BRICK VENEER
- REFER TO ELEVATIONS
2"
THERMO-PLY SHEATHING
BLOCKING @ BALLOON FRAME WALL
SCALE: 3" = 1'-0"
SECTION DETAIL -
05
1/2" = 1'-0"
2x4 'L' BRACE NAILED TO 2x4
2x4 GABLE STUD
THERMOPLY SHEATHING
WOOD TRUSS
A
7'
-
4
"
OR
GR
E
A
T
E
R
DETAIL - GABLE TRUSS BRACING
SCALE:
BOTTOM CHORD THAT EXCEEDS
BETWEEN ANY TOP CHORD AND
#3 SPF OR BETTER IS REQUIRED
'L' BRACE CONSISTING OF (1) 2x4
FURRING w/ 12d NAILS @ 8" o.c.
7'-4"
BRACE SECTION
1" = 1'-0"SCALE: A
06
3/8" = 1'-0"
SEE DETAIL 05/A6.0 FOR BLOCKING @ T-PLY SEAMS
2x4 BALLOON FRAME WALL @ FRONT STAIR
SCALE:
NOTE:
- TYPICAL
@ 16" o.c.
SGL. 2x4 STUDS
@ 16" o.c.
SGL. 2x4 STUDS
DBL. 2x4 TOP ⅊
2x12 HEADER
(1)
JS
19
'
-
0
"
BA
L
L
O
O
N
FR
A
M
E
WA
L
L
HE
I
G
H
T
9 7 8 "
8'
-
1
"
2n
d
FL
O
O
R
WA
L
L
HE
I
G
H
T
9'
-
1
"
1s
t
FL
O
O
R
WA
L
L
HE
I
G
H
T
2'-034"
7'-6"
INTERIOR DIM.
312" 312"
2'-034" 3'-412"
658" 658"6'-434"
4'
-
2
"
3 '-8 1 8 "
5'
-
0
"
5 '-1 3 4 "
7'
-
1
0
1 8 "
12
'
-
1
0
1 8 "
2x12 HEADER
(1)
JS
(1)
JS
(3)
JS
(1)
JS
2x6
ELEVATION DETAIL -
1 1 1 2 "
5 '-1 1 2 "
04
BUILDING SECTION - THRU HEARTH ROOM / MASTER SITTING & BEDROOM 4 / TWO-CAR GARAGE
SCALE:02 1/4" = 1'-0"
12
A1.0
05
A1.0
07
A1.0
FIBERGLASS / ASPHALT SHINGLES
7/16" O.S.B. ROOF SHEATHING
41'-7"
TRUSS SPAN
12'-1012"
TO ℄ COLUMN / STEEL BEAM
9'
-
1
"
9'
-
0
"
9'
-
1
"
MASTER SITTING
T/ FOOTING
T/ 1st FLR SUBLOOR
T/ 2nd FLR SUBLOOR
T/ 2nd FLR DBL TOP ⅊
T/ 1st FLR DBL TOP ⅊
T/ FOUNDATION WALL
9'
-
1
"
9'
-
8
"
10
'
-
0
1 2 "
T/ GARAGE FOOTING
T/ 2nd FLR SUBLOOR
T/ 2nd FLR DBL TOP ⅊
T/ 1st FLR/GARAGE DBL TOP ⅊
T/ GARAGE FDN. WALL
6'
-
8
"
MI
N
.
HE
A
D
R
O
O
M
9'
-
1
0
7 8 "
(1
6
)
R I S E R S @ 7.
4
3
"
2'
-
1
0
"
H A N D R A I L HT
.
HANDRAIL
- IN FOREGROUND
12'-8"
STAIR OPENING
12'-6"
(15) TREADS @ 10"
HALL BEDROOM 4
HEARTH ROOM TWO-CAR GARAGE
BASEMENT
8'-0" 15'-7 12"16"
10" 23'-712" 8"
8'
-
8
3 4 "
T/ 3060 WINDOW
7'
-
9
1 4 "
T/ 2440 WINDOW 15
3 4 "
15
3 4 "
4" STEEL COLUMN
W10 x 26 STEEL BEAM
3 1/2" THK. CONCRETE SLAB
45" x 45" x 12" THICK C.I.P.
CONCRETE COL. FT'G.
- REFER TO ELEV'S.,
GRADE VARIES
SHEET A1.0
2x6 ⅊
8" x 20" C.I.P.
CONCRETE FOOTING
10" C.I.P. CONCRETE
FOUNDATION WALL
PRE-ENGINEERED TRUSSES
- @ 24" o.c.
12
8
TRUSSES
- @ 24" o.c.
5'
-
8
7 8 "
2'-0"
PRE-ENGINEERED
12"
11'-1012"
TO ℄ COLUMN / STEEL BEAM
7'-8"
TO ℄ COLUMN / STEEL BEAM
10"
58'-412"
3'-10"
2'-434"
8'
-
1
"
08
A1.0
CERAMIC TILE
2x4 SEAT FRAMING
@ 12" o.c.
SHOWER PAN
2x4 FRAME WALL
WATERPROOF
MEMBRANE
12" TILE BACKERBOARD
- NO OSB ON SEAT
OR WALL FRAMING
VARIES
SEE PLAN
SECT - SHOWER SEAT
SCALE:3/4" = 1'-0"
1
'
-
5
1
2
"
H
T
.
@
B
A
C
K
O
F
S
E
A
T
1
'
-
5
1
4
"
H
T
.
@
F
R
N
T
O
F
S
E
A
T
2x4 FRAMING
@ 12" o.c.
- SLOPE FRAMING
14" MIN.
NOTE:
12" TILE BACKER BOARD TO BE INSTALLED BY DRYWALL
SUBCONTRACTOR ON SHOWER SEAT & WALL
09
1
'
-
7
1
4
"
P
L
A
T
F
O
R
M
H
T
.
12" TILE BACKER
BOARD
CERAMIC TILE
VARIES
SEE PLAN
2x4 PLATFORM
FRAMING
2x4 SEAT FRAMING
@ 12" o.c.
SHOWER PAN
SEAT / PLATFORM TUB
SECTION - SHOWER
SCALE:3/4"= 1'-0"
1
'
-
5
1
2
"
H
T
.
@
B
A
C
K
O
F
S
E
A
T
1
'
-
5
1
4
"
H
T
.
@
F
R
N
T
O
F
S
E
A
T
WATERPROOF
MEMBRANE
GLASS ENCLOSURE
NOTE:
12" TILE BACKER BOARD TO BE INSTALLED BY DRYWALL
SUBCONTRACTOR ON SHOWER SEAT & WALL
1 2" TILE BACKERBOARD
- NO OSB ON SEAT
OR WALL FRAMING
2x4 FRAMING
@ 12" o.c.
- SLOPE FRAMING
14" MIN.
07
J.S.
(1)
412" 412"
ON INSIDE OF SGL. HDR.
SGL. 2x12 HEADER
J.S.
(1)
2x4 WALL FRAMING @ 16" o.c.
- TYPICAL
REFER TO SHEET A3
FOR WINDOW OPN'G SIZES
2x4 BLOCKING - 12"w.±
NOTE:
J.S.
(1)
J.S.
(1)
J.S.
(1)
J.S.
(1)
BOTTOM and MIDPOINT
2x4 BLOCKING @ TOP &
DTL - TRIPLE WDW SGL. 2x12 HDR
SCALE: 3/8" = 1'-0"08
6'
-
8
"
MI
N
I
M
U
M
HE
A
D
R
O
O
M
C L E A R A N C E (B
E
Y
O
N
D
)
2'
-
1
0
"
HA
N
D
R
A
I
L
HT
(B
E
Y
O
N
D
)
SECTION DETAIL - THRU FRONT STAIRCASE
SCALE: 3/8" = 1'-0"
WOOD RAILING w/ BALUSTERS @
LESS THAN 4 3/8" SPHERICAL SPACING
1/2" DRYWALL (FINISHED)
HANDRAIL
ANCHOR STEPS TO SLAB
- TYPICAL
2x8 PLATFORM FRAME
- w 5/8" O.S.B. SHEATHING
WOOD GUARDRAIL w/ BALUSTERS @
LESS THAN 4" SPHERICAL SPACING
2x8 PLATFORM FRAME
- w 5/8" O.S.B. SHEATHING
4'-2"
(5) TREADS @ 10"
(BEYOND)
HANDRAIL
- BEYOND
4'-1112"
TO NOSING
(BEYOND)
5'-412"
TO NOSING
5'-10"
(7) TREADS @ 10"
3'-10"
TO NOSING
5'-0"
(6) TREADS @ 10"
(BEYOND)
3'-8"
TO NOSING
(BEYOND)
9'
-
1
"
WA
L
L
HE
I
G
H
T
1 1 1 2 "
9 7 8 "
3'
-
0
"
G U A R D R A I L HT
.
9'
-
1
"
WA
L
L
HE
I
G
H
T
3 1 2 "
SL
A
B
9'
-
0
"
9'
-
8
"
(1
5
)
RI
S
E
R
S
@ 7.
7
3
"
9'
-
1
0
7 8 "
(1
6
)
RI
S
E
R
S
@ 7.
4
3
"
5 '-1 7 8 "
PL
A
T
F
O
R
M
HE
I
G
H
T
6 '-2 1 4 "
PL
A
T
F
O
R
M
HE
I
G
H
T
11'-5"
STAIR OPENING
9'-712"
STAIR OPENING
2'
-
1
0
"
HA
N
D
R
A
I
L
HT
.
2'
-
1
0
"
HA
N
D
R
A
I
L
HT
.
HANDRAIL
WOOD RAILING w/ BALUSTERS @
LESS THAN 4 3/8" SPHERICAL SPACING
6'
-
8
"
MI
N
I
M
U
M
HE
A
D
R
O
O
M
C L E A R A N C E
2'
-
1
0
"
HA
N
D
R
A
I
L
HT
01
BUILDING SECTION
IS FOR GENERAL
PURPOSE ONLY
3/8" = 1'-0"
SEE DETAIL 05/A6.0 FOR BLOCKING @ T-PLY SEAMS
ELEVATION DETAIL - GREAT ROOM 2x6 BALLOON FRAME WALL
SCALE:
NOTE:
19
'
-
0
"
BA
L
L
O
O
N
FR
A
M
E
WA
L
L
HE
I
G
H
T
4'-512" 5'-234"
20'-0"
2x6 BALLOON FRAME REAR WALL
4'-512" 5'-434"
10
'
-
2
3 4 "
T/
2 8 1 6 P /5 0 1 6 P /2 8 1 6 P WI
N
D
O
W
S
7 '-9 1 4 "
T/
2 8 6 0 /5 0 6 0 P /2 8 6 0 WI
N
D
O
W
S
1 '-9 1 4 "
6'
-
0
"
RO
U
G
H
OP
E
N
I
N
G
1'
-
6
"
RO
U
G
H
OP
E
N
I
N
G
1 1 1 2 "
11
1 2 "
@ 16" o.c.
SGL. 2x6 STUDS
DESIGNED FOR 90mph WIND SPEED
2830P OPN'G
2'-8"
ROUGH OPENING
14
'
-
2
1 8 "
T/
30
3
0
P
WI
N
D
O
W
S
2'
-
6
"
(2) 2x12 HEADER
5056P
5'-0"
ROUGH OPENING
5'
-
6
"
RO
U
G
H
OP
E
N
I
N
G
WDW.
HT.
(2) 2x12 HEADER (2) 2x12 HEADER
(2)
JS
(2)
JS
(2)
JS
(2)
JS
(1)
JS
(1)
JS
2860P OPN'G5060P OPN'G
2816P OPN'G5016P OPN'G
2830P OPN'G
2860P OPN'G
2816P OPN'G
712" 2'-8"
ROUGH OPENING
712"
3'
-
0
"
RO
U
G
H
OP
E
N
I
N
G
16
'
-
8
1 8 "
T/
50
5
6
P
WI
N
D
O
W
2 '-3 7 8 "
WDW.
HT.
WDW.
HT.
WDW.
HT.
512"
- TYPICAL
DBL. 2x6 TOP ⅊
03
19
'
-
1
1
3 8 "
PAD OUT CLG @ SLOPE
W
I
L
L
I
A
M
L .
K A U F H O L Z
A R C H I T E
C
T
RE
A
S
O
N
FO
R
PL
O
T
:
PL
O
T
DA
T
E
:
Job No.
Sheet No.
IN
NE
W
R E S I D E N C E FO
R
:
HO
M
E
S
I
T
E
NO
.
OF
F
I
C
E
R E V I E W :
MA
S
T
E
R
BY
:
DA
T
E
:
C
DA
T
E
:
FI
S
C
H
E
R
HO
M
E
S
IN
D
I
A
N
A
P
O
L
I
S
,
LP
66
0
2
EA
S
T
75
T
H
S T R E E T
IN
D
I
A
N
A
P
O
L
I
S
,
IN
46
2
5
0
(3
1
7
)
34
8
-
2
5
0
0
F I E L D SP
E
C
HO
T
L
I
N
E
:
(8
5
9
)
34
4
-
7
1
0
0
CO
P
Y
R
I
G
H
T
A L L RI
G
H
T
S
R E S E R V E D
FI
S
C
H
E
R
HO
M
E
S
,
In
c
.
JO
B
IN
F
O
:
DA
T
E
:
PR
O
J
E
C
T
CO
O
R
D
I
N
A
T
O
R
:
PH
O
N
E
No
:
P E R M I T :
S I G N -O F F :
C O N S T R U C T I O N :
RE
V
I
S
I
O
N
:
RE
V
I
S
I
O
N
:
RE
V
I
S
I
O
N
:
RE
V
I
S
I
O
N
:
HO
M
E
TY
P
E
:
PL
A
N
NO
.
E X T E R I O R :
5/
9
/
2
0
1
8
10
:
5
7
AM
--
-
-
OBF-072
HU
A
JI
N
& K E L L Y L E B E T T E R
1 4 4 4 5 O V E R B O O K DR
I
V
E
W H E A T L A N D
G6
9
9
FN O V E R B R O O K F A R M S
C A R M E L , IN
46
0
7
4
07
2
--
-
-
8 5 9 .3 4 4 .3 1 1 5
3/
8
/
1
8
CH
R
I
S
T
I
N
A
BI
S
H
O
P
3/1
2
/
1
8
--
-
-
GR
A
N
D
E S T A T E S C O L L E C T I O N
fi
e
l
d
s
p
e
c
c
h
a
n
g
e
@
f
i
s
c
h
e
r
h
o
m
e
s
.
c
o
m
R E V I S E D BY
:
TE
A
M
MA
N
A
G
E
R
:
PH
O
N
E
No
:
85
9
.
4
2
6
.
4
2
2
3
SH
E
Z
R
A
SI
S
K
O
W
I
C
A6.0
05/29/18
Mike Sheeks