HomeMy WebLinkAboutA0162" x 3" METAL DRIP FLASHING, TYP.
- w/ 1" HEM
- NAIL TO SHEATHING
- USE 1" ROOFING NAILS @ EA. STUD
214" x 5" CAST STONE SILL, TYP.
- PULL BTM. 1"±
1x TRIM BOARD
- HOLD TRIM UP 1" ±
- REFER TO ELEVATIONS FOR SIZES AND
PROFILES
04 SCALE:
BRICK VENEER, TYPICAL
3" = 1'-0"
FIBER CEMENT BOARD PANEL, TYPICAL
- HOLD OFF T/ TRIM 14"
NOTE:
HEM OF FLASHING MUST FASTEN ONE
PIECE TO THE OTHER. (HORIZONTALLY)
STONE SILL w/ 1x TRIM - CULTURED STONE VENEER
112" x 3" METAL DRIP FLASHING, TYP.
- w/ 1" HEM
- NAIL TO SHEATHING
- USE 1" ROOFING NAILS @ EA. STUD
1x TRIM BOARD
- HOLD TRIM UP 1" ±
- REFER TO ELEVATIONS FOR SIZES AND
PROFILES
05 SCALE:
SECTION - FIBER CEMENT BOARD PANEL @ CAST
CULTURED STONE VENEER, TYPICAL
3" = 1'-0"
FIBER CEMENT BOARD PANEL, TYPICAL
- HOLD OFF T/ TRIM 14"
1 4 "
@ CAST STONE SILL w/ 1x TRIM - BRICK VENEER
SECTION - FIBER CEMENT BOARD PANEL
2" x 3" METAL DRIP FLASHING, TYP.
- w/ 1" HEM
- NAIL TO SHEATHING
- USE 1" ROOFING NAILS @ EA. STUD
214" x 5" CAST STONE SILL, TYP.
- PULL BTM. 1"±
01 SCALE:
BRICK VENEER, TYPICAL
3" = 1'-0"
FIBER CEMENT BOARD PANEL, TYPICAL
- HOLD OFF T/ SILL 1"±
1"
±
@ CAST STONE SILL - CULTURED STONE VENEER
112" x 3" METAL DRIP FLASHING, TYP.
- w/ 1" HEM
- NAIL TO SHEATHING
- USE 1" ROOFING NAILS @ EA. STUD
02 SCALE:
SECTION - FIBER CEMENT BOARD PANEL
CULTURED STONE VENEER, TYPICAL
3" = 1'-0"
FIBER CEMENT BOARD PANEL, TYPICAL
- HOLD OFF T/ SILL 1"±
1"
±
@ CAST STONE SILL - BRICK VENEER
SECTION - FIBER CEMENT BOARD PANEL
1 4 "
NOTE:
HEM OF FLASHING MUST FASTEN ONE
PIECE TO THE OTHER. (HORIZONTALLY)
NOTE:
HEM OF FLASHING MUST FASTEN ONE
PIECE TO THE OTHER. (HORIZONTALLY)
NOTE:
HEM OF FLASHING MUST FASTEN ONE
PIECE TO THE OTHER. (HORIZONTALLY)
@ FIBER CEMENT BOARD PANEL03SCALE: 3" = 1'-0"
H-STRIP CONNECTOR OR BATTEN,
TYP.
- REFER TO PLANS FOR LOCATIONS
FIBERGLASS ASPHALT SHINGLES
OVER 7/16" ROOF SHEATHING
METAL FLASHING
- TURN OUT 3" ABOVE GUTTER
FIBER CEMENT BOARD PANEL, TYP.
- NOTCH FIBER CEMENT BOARD
PANEL FOR FLASHING
+2/' 2)) 7 6+,1*/(6
ALUMINUM GUTTER
- REFER TO ELEVATIONS
1x8 GUTTER BOARD, TYP.
METAL DRIP FLASHING
- NAIL & TAPE TO SHEATHING
- USE 1" ROOFING NAILS @ EA. STUD
METAL DRIP FLASHING
- NAIL & TAPE TO SHEATHING
- USE 1" ROOFING NAILS @ EA. STUD
METAL FLASHING, TYP.
- NAIL & TAPE TO SHEATHING
- USE 1" ROOFING NAILS @ EA. STUD
1x TRIM BOARD
- HOLD TRIM UP 1" ±
- REFER TO ELEVATIONS FOR SIZES
AND PROFILES
06 SCALE:
w/ 1x TRIM w/ ROOF BELOW
3" = 1'-0"
FIBER CEMENT BOARD PANEL, TYPICAL
- HOLD OFF T/ TRIM 14"
1"
±
ROOF PITCH VARIES
- REFER TO PLANS
METAL FLASHING, TYP.
- NAIL & TAPE TO SHEATHING
- USE 1" ROOFING NAILS @ EA. STUD
07 SCALE:
FIBER CEMENT BOARD PANEL w/ ROOF BELOW
3" = 1'-0"
FIBER CEMENT BOARD PANEL, TYPICAL
- HOLD OFF T/ ROOF 1"±
1"
±
ROOF PITCH VARIES
- REFER TO PLANS
1 4 "
METAL DRIP FLASHING
- NAIL & TAPE TO SHEATHING
- USE 1" ROOFING NAILS @ EA. STUD
FIBER CEMENT BOARD PANEL @ HORIZONTAL SEAM
SECTION -
08 SCALE: 6" = 1'-0"
NAILING PATTERN NOTE:
2" x 6d GALVANIZED NAILS TO BE 6" o.c. ON
PERIMETER and 12" o.c. IN THE FIELD
- KEEP FASTENERS 2" AWAY FROM CORNERS
& 38" MIN. FROM EDGE OF PANEL
'Z' FLASHING
- DO NOT OVERLAP FLASHING @ JOINTS!
- BUTT ENDS OF FLASHING TOGETHER
FIBER CEMENT BOARD PANEL, TYPICAL
- HOLD OFF T/ 'Z' FLASHING 14"
FRAME WALL @ 16" o.c.
18" STRUCTURAL SHEATHING
1 4 "
1 1 2"
3"
11 5°
1 2 "
135
°
214"h. x 2 34"w. CAST STONE SILL, TYP.
- PROJECT BTM. 34" ±
- SLOPE 38" MIN. TO PROVIDE
POSITIVE DRAINAGE
1"±
1"
±
1 1 2"
3"
115
°
1 2 "
135
°
1"±
34"±
3 8 "
MI
N
.
11 2"
3"
115
°
1 2 "
135
°
1"
±
34"±
3 8 "
MI
N
.
11 2"
3"
115
°
1 2 "
135
°
214"h. x 2 34"w. CAST STONE SILL, TYP.
- PROJECT BTM. 34" ±
- SLOPE 38" MIN. TO PROVIDE
POSITIVE DRAINAGE
SECTION -
DETAIL - GABLE FLASHINGSECTION - FIBER CEMENT BOARD PANEL
'SONOLASTIC NP-1' CAULK OVER ALL
NAIL HOLES AND OUTSIDE EDGE OF
NAILING FLANGE.
- SMOOTH w/ APPLICATOR
- INSTALL IN SUCH A MANNER SO AS TO
PREVENT MOISTURE FROM ENTERING
THE TOP & SIDES OF THE EXTERIOR
WINDOW OPN'G.
@ FIBER CEMENT BOARD PANEL
FIBER CEMENT BOARD PANEL, TYPICAL
SCALE: 09 3" = 1'-0"
SECTION - WINDOW SILL w/ SLOPED WOOD TRIM
14" BEAD OF 'SONOLASTIC NP-1'
CAULK, CONT. BTWN FLANGE AND
SHEATHING
- TYPICAL, ALL (4) SIDES
112" NAIL @ EVERY OTHER NAILING HOLE
IN WINDOW FLANGE
- NAIL HEAD TO BE WIDER THAN HOLE IN
FLANGE
1x TRIM, TYPICAL
- w/ 10° BEVEL @ TOP EDGE
- w/ FIBER CEMENT BOARD PANEL
BACK-UP
- REFER TO ELEVATIONS FOR SIZES
AND PROFILES
1x2 SYNBOARD TRIM
- EXTEND 1" BEYOND 1x BEVELED TRIM
FIBER CEMENT BOARD SIDING @ CONC. FDN WALL
SCALE:3" = 1'-0"
STRUCTURAL SHEATHING
NOTE:
THICKNESS VARIES
REFER TO FOUNDATION PLAN
8" THICK CAST-IN-PLACE
CONCRETE FOUNDATION WALL:
- UNLESS NOTED OTHERWISE
ON FOUNDATION PLAN
- HOLD POLY 1" BELOW
T/FOUNDATION, TYP.
1 2 "
1 2 "
1"
- EXTEND SHEATHING TO
1/2" BELOW T/ FOUND.
SECTION DETAIL
APPROVED FASTENER
@ 3"o.c., TYPICAL
APPROVED FASTENER
@ 12"o.c. IN BTM 1/3 OF BAND BD.
SILL SEALER, TYPICAL
MUDSILL ANCHOR STRAP, TYP.
24" POLY FLASHING, TYPICAL
FIBER CEMENT BOARD PANEL
- TYPICAL
13
NAILING PATTERN NOTE:
2" x 6d GALVANIZED NAILS TO BE 6" o.c. ON
PERIMETER and 12" o.c. IN THE FIELD
- KEEP FASTENERS 2" AWAY FROM CORNERS
& 38" MIN. FROM EDGE OF PANEL
158" BARGE MOULD
NOTE: FRONT TURNED GABLES ONLY
- REFER TO ELEVATION
@ GABLE END WALL w/ 12" EXTENDED RAKE
SECTION - FIBER CEMENT BOARD PANEL
12 SCALE: 3" = 1'-0"
1x8 GABLE FRIEZE
- w/ FIBER CEMENT BOARD PANEL BACK-UP
FIBER CEMENT BOARD PANEL, TYPICAL
STRUCTURAL SHEATHING:
(STRUCTURAL & WATER REPELLENT)
-GABLE SHT'G TO OVERLAP WALL
SHT'G 2" MINIMUM.
@ GABLE END WALL
SECTION - FIBER CEMENT BOARD PANEL
10 SCALE: 3" = 1'-0"
1x8 RAKE BOARD
- w/ FIBER CEMENT BOARD PANEL
BACK-UP
FIBER CEMENT BOARD PANEL, TYPICAL
STRUCTURAL SHEATHING:
(STRUCTURAL & WATER REPELLENT)
-GABLE SHT'G TO OVERLAP WALL
SHT'G 2" MINIMUM.
@ GABLE END WALL w/ EXTENDED RAKE
SECTION - FIBER CEMENT BOARD PANEL
11 SCALE: 3" = 1'-0"
3/8" SOFFIT
1x8 RAKE BOARD
- 2x6 BLOCKS @ 24" o.c. ON 1x6's
GABLE EXTENSION
12"
1x8 GABLE FRIEZE
- w/ FIBER CEMENT BOARD PANEL BACK-UP
FIBER CEMENT BOARD PANEL, TYPICAL
STRUCTURAL SHEATHING:
(STRUCTURAL & WATER REPELLENT)
-GABLE SHT'G TO OVERLAP WALL
SHT'G 2" MINIMUM.
3/8" SOFFIT
1x8 RAKE BOARD
- 2x6 BLOCKS @ 24" o.c. ON 1x6's
GABLE EXTENSION
PER PLAN
W
I
L
L
I
A
M
L .
K A U F H O L Z
A R C H I T E
C
T
RE
A
S
O
N
FO
R
PL
O
T
:
PL
O
T
DA
T
E
:
Job No.
Sheet No.
IN
NE
W
R E S I D E N C E FO
R
:
HO
M
E
S
I
T
E
NO
.
OF
F
I
C
E
R E V I E W :
MA
S
T
E
R
BY
:
DA
T
E
:
C
DA
T
E
:
F I S C H E R HO
M
E
S
I N D I A N A P O L I S , LP
66
0
2
EA
S
T
75
T
H
S T R E E T
I N D I A N A P O L I S , IN
46
2
5
0
(3
1
7
)
34
8
-
2
5
0
0
F I E L D SP
E
C
HO
T
L
I
N
E
:
(8
5
9
)
34
4
-
7
1
0
0
CO
P
Y
R
I
G
H
T
AL
L
RI
G
H
T
S
R E S E R V E D
FI
S
C
H
E
R
HO
M
E
S
,
In
c
.
JO
B
IN
F
O
:
DA
T
E
:
PR
O
J
E
C
T
CO
O
R
D
I
N
A
T
O
R
:
PH
O
N
E
No
:
P E R M I T :
S I G N -O F F :
C O N S T R U C T I O N :
RE
V
I
S
I
O
N
:
RE
V
I
S
I
O
N
:
RE
V
I
S
I
O
N
:
RE
V
I
S
I
O
N
:
HO
M
E
TY
P
E
:
PL
A
N
NO
.
E X T E R I O R :
5/
9
/
2
0
1
8
10
:
5
8
AM
--
-
-
OBF-072
HU
A
JI
N
& K E L L Y L E B E T T E R
1 4 4 4 5 O V E R B O O K DR
I
V
E
W H E A T L A N D
G6
9
9
FN O V E R B R O O K F A R M S
C A R M E L , IN
46
0
7
4
07
2
--
-
-
8 5 9 .3 4 4 .3 1 1 5
3/
8
/
1
8
CH
R
I
S
T
I
N
A
BI
S
H
O
P
3/1
2
/
1
8
--
-
-
GR
A
N
D
E S T A T E S C O L L E C T I O N
fi
e
l
d
s
p
e
c
c
h
a
n
g
e
@
f
i
s
c
h
e
r
h
o
m
e
s
.
c
o
m
R E V I S E D BY
:
TE
A
M
MA
N
A
G
E
R
:
PH
O
N
E
No
:
85
9
.
4
2
6
.
4
2
2
3
SH
E
Z
R
A
SI
S
K
O
W
I
C
D4.1
05/29/18
Mike Sheeks