Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
S001
ALL FOOTINGS DESIGNS BASED ON AN ASSUMED ALLOWABLE SOIL BEARING PRESSURE OF 1500 PSF FOOTING DEPTH @ GARAGE DOOR OR PORCH MAY VARY TO MAINTAIN DEPTH FOR FROSTLINE EXTERIOR WALLS ARE 4" RGH FRAME INCLUDING 12" SHEATHING, WHICH IS FLUSH WITH OUTSIDE OF BLOCK. IN-LINE DIMENSIONS FOR LOCATION OF MECHANICALS ARE FROM OUT-of- BLOCK TO CENTER-LINE OF 312" WALL FRAMING.OTHER WALL WIDTHS ARE NOTED. PLUMBING FIXTURES ARE LOCATED AT ℄ OF FINISH LOCATION. - INDICATES 8"x8"x16" "L" BLOCK - INDICATES 8"x8"x16" SOLID BLOCK NOTE: SEE SHEET D2.0 FOR FOUNDATION DETAILS 3 2 " X 6 0 " 28'-4" TO ℄ OF WATER ROUGH 8.0 A 8.1 B 3'-1" TO ℄ OF DRAIN 1'-2" TO ℄ OF DRAIN 18 ' - 9 3 4 " TO WE T WA L L SCALE: 3/4"=1'-0" GARAGE DOOR MASONRY OPENING M.O. EXTERIOR FACE NO "L" BLOCK IF BRICK VERTICAL "L" BLOCK ANCHOR PER RE-ENFORCE. SCHED. PROVIDE CONTROL JOINT ALONG EVERY BEAM LINE PROVIDE CONTROL JOINT AT EVERY INTERIOR CORNER AVOID PLACING CONTROL JOINTS UNDER HARD SURFACE FINISHED FLOORS AVOID LONG, NARROW "BOWLING ALLEY" REGIONS AND MAKE ISOLATED AREAS AS SQUARE AS POSSIBLE. CJ CONTROL JOINT IN CONCRETE SLAB CONTROL JOINT IN FOUNDATION WALLCJ FRAME WALL ABOVE F.D. 11'-8" TO ℄ OF FLOOR DRAIN SCALE: SLAB FOUNDATION PLAN 1/4" = 1'-0" UNEXCAVATED 4" CONCRETE SLAB OVER 4" GRAVEL BASE UNEXCAVATED 4" CONCRETE SLAB OVER VAPOR BARRIER AND 4" GRAVEL BASE UNEXCAVATED 4" CONCRETE SLAB OVER 4" GRAVEL BASE 48" x 48" x 14" CONC. PAD 36" x 36" x 12" CONC. PAD 16 ' - 4 1 2 " TO ℄ OF FO O T I N G 14'-114" TO ℄ OF FOOTING 15'-012" TO ℄ OF FOOTING 14'-034" TO ℄ OF FOOTING SL O P E SL A B 1/ 8 " PE R FO O T MIN . ICE 12 ' - 4 1 4 " TO ℄ OF IS L A N D GO U R M E T KIT 25'-134" TO ℄ OF WET WALL GOURMET KIT REF SPACE 6'-012" TO ℄ OF FOOTING 1 8 '-1 13 4 " TO ℄ OF FO O T I N G F.D. 8'-1" TO ℄ OF FLOOR DRAIN 8'-1112" TO ℄ OF WASHER BOX 6'- 0 " 1 1 '-9 " 17 ' - 9 " ELEVATION "G" BRICK FRONT 14'-912" 14'-112" 20'-4" 49'-3" 2'-4" 16'-0" 2'-0" DROP FOUNDATION 112 COURSES ANDPOUR SLAB THROUGH 52 ' - 1 " 16 ' - 5 1 2" TO ℄ OF DR A I N 21 ' - 0 " 21 ' - 4 1 2 " 4" BRICK LEDGE (TYP) 4" BRICK LEDGE (TYP) 4" BRICK LEDGE (TYP) DROP PORCH FND TO MATCH BRICK LEDGE 6'-7" 7'-612" 8.0 A 8.1 B 10'-534" TO ℄ OF WET WALL 7'-8" TO ℄ OF DRAIN TO ℄ OF SH O W E R DR A I N FR O M CO R N E R 2'-0"TO ℄ OF DRAIN 7'- 1 " TO ℄ OF FL O O R DR A I N 31 ' - 0 1 2 " TO ℄ OF DR A I N WS G A S 23 ' - 0 1 4 " TO WE T WA L L 2'- 4 1 4 " 19 ' - 8 3 4 " D-2.003 D-2.003 D-2.001 D-2.0 01 D-2.001 D-2.005 D-2.002 D-2.0 08 D-2.001 3'- 3 " 49'-3" 3'-0" 8'-4" 3'- 0 " 12'-0"20'-1" 2'-10" CONCRETE STOOP PER SPECIFICATIONS 3'- 0 " 58 ' - 4 " 74 ' -07 8" 3'-0" WH 3'- 0 " 7 1 '-81 8 " 55 ' - 4 " 58 ' - 4 " Sheet: Issued Date: Sheet Title : LSP Date: BASE PLAN REVISION: 11 x 1 7 P R I N T S A R E 1 2 S C A L E LSP By: LSP Rev: 15 16 Job #: 09/23/10 02/10/16 08/01/16 11/10/17 12/06/17 Cl a y t o n II 17 18 BB - 2 1 0 1 0 6 So l a c e La n e SR 5-17-18 BB-2 ---- M/ I H o m e s I n c . M/I H O M E S PR E S T I G E SE R I E S 20 1 0 © M/ I H o m e s I n d i a n a p o l i s R e g i o n Ar c h i t e c t u r e D e p a r t m e n t 84 2 5 W o o d f i e l d C r o s s i n g B l v d . In d i a n a p o l i s , I N 4 6 2 4 0 Ph 3 1 7 . 2 5 5 . 9 9 0 0 2.0G Slab Foundation 06/11/18 Mike Sheeks