HomeMy WebLinkAbout326385 06/15/18 +p._C�Ngs
oY w CITY OF CARMEL, INDIANA VENDOR: 361862
�I ONE CIVIC SQUARE PATRIOT ENGINEERING &ENVIRONMEI1��hK3.CK AMOUNT: $""""1,871.75*
CARMEL, INDIANA 46032 6330 E 75TH ST,SUITE 216 CHECK NUMBER: 326385
'M,iTON�.r INDIANAPOLIS IN 46250-2700 CHECK DATE: 06/15/18
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
1207 4350900 104561 1,871.75 OTHER CONT SERVICES
VOUCHER NO. WARRANT NO. Prescribed.by State Board of Accounts City Form No.201(Rev.1995)
Vendor# 361862 ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
PATRIOT ENGINEERING & ENVIRONMENTAL IN SUM OF$ CITY OF CARMEL
6330 E 75TH ST, SUITE 216 An invoice or bill to be properly itemized must show:kind of service,where performed,dates service
rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
INDIANAPOLIS, IN 46250-2700
Payee
$1,871.75
Purchase Order#
ON ACCOUNT OF APPROPRIATION FOR
Brookshire Golf Course Terms
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
104561 43-509.00 $1,871.75 1 hereby certify that the attached invoice(s),or 6/6/18 104561 New Building $1,871.75
1207 101 1207 101
bill(s)is(are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Monday,June 11,2018
/ %
hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
,20
Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer
Patriot Engineering And Environmental,Inc.
6150 E.75th Street
Indianapolis, IN 46250
317-576-8058
Brookshire Golf Club Invoice number 104561
Bob Higgins Date 06/06/2018
12120 Brookshire Pkwy
Carmel, IN 46033 Project 18-0546-01C Brookshire
Golf Clubhouse Materials
Testing
PM Joshua Agee
For Professional Services provided through 05/27/2018.
Construction Materials Testing
Billed
Hours Rate Amount
Data Processing 3.50 50.00 175.00
Field Operations Manager 1.75 90.00 157.50
Sr Eng Tech 1 6.75 33.00 222.75
Sr Eng Tech II 17.50 43.00 752.50
Senior Project Manager 1.50 120.00 180.00
Subtotal 31.00 1,487.75
Billed
Units Rate Amount
Miles 160.00 0.65 104.00
Concrete Cylinders ASTM C-39 20.00 14.00 280.00
Subtotal 384.00
Invoice total 1,871.75
Interest charges of 1 1/2%per month will be applied to invoices not paid within 30 days.
For information regarding this invoice,please contact Susan C.Alexander at 317-558-5034,salexander@patrioteng.com.
Thank you, We appreciate your business!
Brookshire Golf Club Invoice number 104561 Invoice date 06/06/2018
Page 1
Home Patriot Engineering&Environmental,Inc.
Client Charge Slip
rr77 77777 7-
{ Protect ID �n� � ^-_ 1777771�� ' 4 1
( -Phase lDBDescdpdon Status Client V EmpbyeeTypa. Date Hours Notes
Employee" �+
ETotala
+;18-054"1CBrookeh1reW Gubhouse Matenafs
676 r <
BasicSWoes Engineering Services
--Christopher.Rod
n
r
8illable.� ;"Brookshire GoHClub -Field OperatlonsMariager 5212018.y ; 1.00 SAMEDAYSEWCdz230pmconciele
Emily Hr995 '.i
^-:Billable - Brookshire GaK Club °Data Prwx+ssing;; 5l12018� y0.75 Compresswe Strength ReporhnglDistributan&Concrete Data
Management-perset castxl(0427)
- Compressive SbengthRepoNngNrslnbtNon&Concrete Data
44F E2r ,Billable Brookshire GaK Club e Daha Promssing 5x82018 1.50 Maregement-parseteastx2(05N7) I)
s _,
A
Compressive Strength RepoNngUslribution&Concrete Data
;Billable,µ Brookshire GaHClub Data Processing= _ 592018 �1;00-M
.-., _ arugement-perset nstx1(OSI02)waltedred Phom Re port
wJosfiva/lea 'r ' :+..
Billabla Brookshire GoK Club :r .--,>. -Senior Project Mznager,,, SMQ018`. 0.50 Concrete report review.(l set cast 12 set cast 428)
.....,a.: ) snager 5"92078 l).50 Concrete(sport rertew.(2 sats
:BiKabla Brookshire OoK Club SeniorProectM _ «� « �__,g.K.
,...2 ......<,. - ..u.y..
Billable:,' Brookshire Goff Club t - Senior Project Manager 57102M18� .-:025 Concrete report raJbvi(l set
ryjs BNabla BrookshlreGoH Club *.� of SeniorProjed Manager 51142018„ "025 Coxreb report rev7ew(l set cast 577)'' .i
.r. -- -
Kevin Wff ews
'y )
E -. ' Billable- - BraokshireGoK Club Fl
eld Operations Manager 4G102018 _025 Scheduling Footings Resteal Concrete
- &Mable Brookshire GoKClub- Field Operations Manager -_ 5x12018;_ 025 Scheduling Footings;Concrete Resteel
BlOable ' Braokshire.GoK Club Field Operehons Manager 5/72018 U25 Scheduling Concrete
�-^`-'-^_«r k �e,t i� '
- F7,7
t �' - r, Billable Brookshira;GoH Club "^ .Data Processing'. 59fIA184-,4, �.d25 pro)e@setup -
j
1
Page 1 of 1 Wednesday,June 6,2018 11:22:12 AM
PATRIOT ENGINEERING and Environmental, Inc. TRIP TICKET
6150 E.75th Street
Indianapolis IN 46250
317-576-8058 FAX: 317-576-1965
Patriot Rep ,t : Josh Dosztan
Protect Info ?.,1 18-0546-01 C:Brookshire Golf Clubhouse Date _ I Monda ,April 30,2018
a
Client ,. ,. .;= Brookshire,Golfi Club Weather .; - `I 65 clear
Location. Ca"rrr'el Patriot PM- JA/CS
TIME A•MILEAGE Time(airs) , ; Mileage(miles)
Time�to Site �� scare-. end 0,25 Mues to�site 10
On' 7:45 AM ._r 3:00 PM 7.25
"use 00 00 AM/PM or=
Lunch/Off site military time format►' 0.00
Time`to Office M
0.25 ues to offices 10
L66in/kep
,ort ng Time. ..' 0.25
TotaMdurs WorkedLTotal Mileage .Total hours ►-R 8.00 r- Total-miles 10- 20
✓ Please check all applicable Aelds
#.of
Pro cto�Samples ; #Gradation.:Samples #of Soil Class
ii'`Y #of:.Cyls;or`,Beams , 5 #of Cubes #of Grout,,Pnsms'
Block'Prisms { #of E V(Gk d Samples;, #of F:P..D,ensity -.=
f� - CasfDate:of Sam le .<`�Saturday,April 28, 2018
P"'Lu Compressive Strength #of Sets of Cyls' Tofal#of Cyls
Flexural Stnan4th - #of Sets of:Beams 'f_ , Total#'of Beams '
t , Batch Plant Ins Pre Cast Plant Insp ; FF/FL Testin - ;
Swiss Hammer . Wmdsor_Probe ' #of.Probes
:
Grout Prisms #of Sets-of"Prisms Total#of Prisms
J.z
y; Mortar/G'rout Cubes #of.Sets of Cubes Total#of i Cubes j
Batch an Insp.; Spec ial.Insp, Other
Proof Rolhlnsp7. Footing-Insp X Nuke FDT,},
Pile,ns"pection i Load.:Test a Other-
Z` Concrete Asphalt ' Masonry
Corin ,Ri
o g ; Generator, n No;of Cores ;
Hammer Drill 4 °j Penetrations Patched; Inches Cored °:
w 9 Fit?lJp Bolting:Inspection 1Visual Weltl Insp:: J
;F W
v,x� Ultrasono: yf , Mag'.,Particle,• " LiquidaP_en .. j
r7-
iT nsp X Fire'proofing:Thick Moisture Emission
�Y I
Pull'Out Testing Adhesion/Coheswn:. 1 Paint Thickness
L,00'se L'ift'Thickness Temperature Gun. ,;' Asphalt Nuke,:Density j
Client Approval
}
Date >4/30/2018
>s
Comments
_ 9
R
✓ I have reviewed the General Site Safety Hazard Analysis Checklist for project
PATRIOT ENGINEERING and Environmental, Inc. TRIP TICKET
6150 E.75th Street
Indianapolis IN 46250
317-576-8058 FAX: 317-576-1965
3 Patriot Rep Josh Dosztan
Project Info 18-0546-01 C:Brookshire Golf Clubhouse Date. 1Tuesday,May 1,2018
Client
W
:16rookshire Golf Club eather ;I 65 clear
Location Cai mel. Patriot"RM JA/CS
TIME 8r MILEAGE Time Mileage°(miles)
Briefing Time:;,
Tune to Site`1 start Ena = 0.25 Miles to$te. 10
On-Slte ""useoo.odAMRMor 10:00 AM 3:00 PM 5.00
Lunch/Off site mrlrrary rrme,formar► 0.00 `
Time;toOffice " 0.25 Muestoonce 10
Login/Reporting Time
T.otahHours.,Worked otal Mileage Tofal hours ►: 5.50 s .' Tota'I,miles 0-A 20
✓ `please check all applicable Telds
#:of Proctor,Samples #Gradatida Samples f #`of.Soil Class
t `tea Y #of'Cyls`or'Bearns ` #of Cubes•, #of Grout'Pnsms."
41 '#of,Block Pnsms, #of E)OGrad•Sa�mples #of F.P.Qensity,
la Cast Date of Sam 1e
A Compressive Strength =1 X #of Sets of Cyls, 2 Total#of Cyls 10
Flexural Strength , #of Sets of Beams '; Total#of Beams
Batch PlantInsp. Pre Cast Plant Insp FF/FL Te`stmg
i r S.ips'.Hamrner.,'. Windsor Probe:' = #:of=Probes
.," Grout Prisms,. # #of�Se'ts of Prisms': 3 Total;#.of Prisms
` "Z Mortar/Grout_Cubes , I #of Sets of:Cubes Total#of Cubes •..
Batch'Plant=dnsp.' Special-Insp. Other`
Proof Roll,.lnsp ! FooUng:Insp i NuRe•FDT -_
°w
Pile inspection Load.Test„ ? Other
Z: Concrete _ ; Asphalt Masonry
f `o: : Coring Rig.` ' Generator a No:of'Cores 4
o Hammer;,Drill :Penetrations,Patctied,'i [riche s.Co`retl
I �;c
I w Fit Up Bolting,lnspection Vi"sual Weltl Insp
W:W
. Ultrasonic Mag Particle . Liquid Pen
r Resteellnsp Fireproofing Thick Moisturetmission
N.
oufw6t Testing Ad he'sioNCoh6sion Paint Thickness
I Loose;Lift Thickriess Temperature Giro,,, Asphalt Nuke:Den'sity"'
Client Approval
f
Date 5/1/2018
Commenfs
✓ I have reviewed the General Site Safety Hazard Analysis Checklist for project
PATRIOT ENGINEERING and Environmental, Inc. TRIP TICKET
6150 E.75th Street
Indianapolis IN 46250
317-576-8058 FAX: 317-576-1965
Project Info + 18-0456-01C:Brookshire Golf Clubhouse Materials Patriot Rep ]Nick Campi
Date 'i Wednesday,May 2,2018
Client ,-, ;Brookshirb. Golf�Course - Weather �;`' .166-81 and partly cloudy
Location. ;Carmel IN Patriot>FM
TIME&:MILEAGE -`-
_ Tme•(hrs) , ^ Mileage.(miles)
Timeto Site,, start end 0,25 Miles to site. r 10
On-Site "use 00:00 AM/PM or 1:45 PM 4:00 PM 2.25
Lunch/Offsite milrtary trine format►. 0.00
Time;to Office 0.25 Miles
to office. 10
Li?gin/Repb ing.Tihid..
Total:Hours Wo rked/TotaL:Mileage Total,hours,► 2.75 : Total,►Hiles ► 20
Please check all applicable fields
#of`Proctor:Samples #Gradatiorn;Samples; #.of Soil;Cla'ss: 7:
a,Y #of Cyls of;Bearn #of.Cubes #of Grout Prisms
U);a #,of Block Prisms #of Ex/Grad`Samples# .'of.F.P.Density.,
Cast Date of,Sam le i
= Compressifve Strength X #of Sets of.Cyls' I 1 total#ofCyls 5
Flezural,.Strength #of Sets of Beams Total#11 of Beams: ."
,z = ,
I .' �°, Batch Plant'Insp . _'. I Pre-Cast Plant.lnsp..,`j FF/FL Testing
SvriissHarimer �? Windsor Probe`.', . ; ? #of Probes. {
Grout Prisms #ofSets�of-Prisms Total`#of Prist6s.
A y Mortar/Grout Cubes" #;of,Sets of Cubes Total#of Cubes` l
Batch Piant,lnsp. - Special lnsp . Other i
I Proof Roll ln'sp. s IF
nsp Nuke FDT` ,
y"
Pi q. 3 Load Test ? Other-
p Z° Concrete Asphalt'` ? Masonry'
Coring,Rig- _ 1 Gene[a4or . ;,i No of..Cores
Hammer Drill j PerieCrafion`s Patched f (riches Cored . w
'wn Fit Up _ Bolting'Inspection Visual'Weld.]nsp:
t :y Ult`r'"asonic':° jUJ ur,
Mag.Particle � ILiquid Pen.
_ ResteeYlnsp. Firep r6ofin Thick ! Moisture Emission
9
Pw(but Testing`,- Adhesion/Cohesion .i Faint Thickness r-
i Lpose Lift Thickness ! Temperature Gun ,''a Asphalt Nuke Density
Client Approval ;.
`...._..................._..................................._.........................._._._..._..................._._._......._...,........................_......................_._........................
Date 5/2/2018
Comments
✓ I have reviewed the General Site Safety Hazard Analysis Checklist for project;
PATRIOT ENGINEERING and Environmental, Inc. TRIP TICKET
6150 E.75th Street
Indianapolis IN 46250
317-576-8058 FAX: 317-576-1965
PrqJect.lnfo18-0546-01 C:Brookshire Golf Clubhouse Materials Patriot Reo.": I Nick Carnpi
'1:',.j Testing IJ'
ate Wednesday,May 2,2018
6r:"i
Client-: BrookWre"G61f Ciburse',"-: -81 partly cloudy
"'Weather;"; 166
Location'.'. Patriot PIVI °C JA!
TIME&MILEAGE :7ifi1e'(hrs)- Mileage(mllbs):,
7
Briefing Ti
lrne;
End'- 0.25
Tirb6 to Site:,'-,*--'' Miles to Site:-J 10
On-Site ,'bse'00:'00 AM/Pk 9:00 AM 9:30 AM 0.50
or
Lun_Qh/Off;.si_tb . m,flitaTtim's tormafos 0.00
Tryie to.Office 0.25 Miles to Offte:,;
ILog,in/Reporting:Time 0.50
Total Hour4,workedl�Total,,,Mileage.,,,,,��,,,i,,�:����, �Tbtafhours-00: 1.50 ",Total Aniles 0,-11 20;
✓ -Please check a//app//cable flelds
#of,Prob. k-Oradation Samples. '*of Soil Class
#,of Cyls--or.Beams' 10 ,#,of'Cube-s, #of.Grout
rout Prisms
,
ofBI -Prisrns� #,of Ex/Grad-Sa rhples -.F.R Density
fn 5. ock #,of
Qi.§ibiate`of Sam pje: j Tuesday, May 1, 2018
LU Compressive Strength j #,_of.Sets of,CSIs. i total#,ofCYIs-
of of
.Beams o Sets o# Bearris Total#of•Bearns.:
'it 1�16nt1hsp.,'
Pro-Ca FF/FLTdStin
! Swiss Hammer i #�6f.Probe4..:;
Mrtdso'r.,Probe'
drout,ptis,im- skbof Sets of Prisms TofalVof Pri6irns.
Mortar/Grout Cubes,: #bf-Sets f'Cubes., Total of,Cubes
Bat 6h--Plant 1 nsp:? Special Insp. Other .
J
�.roof,Roll Insp.- Footing Insp. NukeFbT JI
- "'-
(L: e
i ,n
I ':I'spect on, JLoid'Test10ther
. Z
0�_,"* Asphalt Masonry
Mason
i,
Generator 0 No.,of Ci6res�
H6rnnier Penetrations Patched" nqhes' Cored
w.WFItUp Boltindlh��eciion,' Visual Weld lnsp.'
I
nic-,,'.- Mag.;,Particle Liquid Pen.
kdst6eIAnsp. Firepi-66fing"Thick...". 11 Moisture'Emission.
A
P - Paint,Thidkhpss ''
Ull Out Testing Adhesion/Cohesion
I
A hesibn'
'Loo'sei-Lift7hickness- Temperature Gun, Asphalt
J
Client Approval : ,
. . . ..........................................................................................................................................................................................
6ate;:. - ,"15/2/20118
Comments „ Cylinder pickup
✓ I have reviewed the General Site Safety Hazard Analysis Checklist for project
PATRIOT ENGINEERING and Environmental, Inc. TRIP TICKET
6150 E.75th Street
Indianapolis IN 46250
317-576-8058 FAX: 317-576-1965
Project Info 18-0546-01c Patriot Rep : 1Abimbola folagbade
Date ;iThursda , May 3,2018
Client ` •
BROOKS HIRE`GOLF:COURSE
Location. :.CARMEL . ' ' :.: '. A/C
PatrioYP„M. J S
TIME&MILEAGE. Time,(firs), Mileage(triles)
Briefing Time,
Time.to.Site start End 0.50 Miles td site 10
On-Site 7:00 AM 7:15 AM 0.25
"use 00:00 AM/PM+or•
Lunch/Off site _ military,sme format►• 0.00
Time''to.Office 0.50 Milesto`offce: 10
Login/Reporting Time _
:Total Hours,,, Totah hours,'► ; 1.25 Total miles.10-.1 20
Please check all appl/cable Aelds
#'ofProctor Samples #Gradation:Samples #of Soil Class
a Y #o€`Cyls or Beams,' 5 #of'Cubes #of Grout Prisms` . '
#of.Block`Prisms”. #of.Ex/Gr ad•Samples, #of F R Density '
Gast,Date of Sam ie' ',Wednesday,May 2, 2018
r LU compressive Strength #'of-Sets of Cyls l Total`#of Cyls
.•Z' Flexural Strength #of Sets of Beams' : I Total#:of Beams
l ,vi Batch.Plant lns ': f Pre=cast,Plant lns:',.•i fF/Fl Testis
Swiss•Hammer r VUindso Probe i #:of Probes j
Gr'out,Prlsms j #of-Sets of Prisms Total#:of Prisms
Mortar/Grout'Cubes`
'io'&Sets of Cubes Total#,.of Ctabes
me Ratch;Plant Insp. • j $,pecial Insp.. Other
J s Froof,Roll'Insp: Footing Insp. Nuke FDT •
._.
Pile,lnspection, ' ! L
L oad Test: j 106er
Concrete i Asphalt. Masonry.'
{. ., o. Coring Rig,. _ .Generator No`.of Cores' 1
Hammer'p'r'ill ,; Penetrations Pa'
tched! Inolies Cored,
w° F'it;lJp Boltng.Inspectiorn' Visual Weld,.lns .
w'w
N lJltrasoniC.: :",1 Mag:Rarticle' Liquid'Pen. ..
Resteel.lnsp.. Fireproofing Thick: Moisture'Emisaion
Pull'Out Testing. = Adhesion/cohesion i Paint Thickness
^i Goose Lift Thickness: 1 Temperature Gun, Asphalt Nuke.Density.l
Client A
pp'roval
._._..................._........................._.............................._............._..................._...._......................_............................................
Date : `::N..`. 5/3/2018
.. l
Co'mme'nts,
:i
✓ I have reviewed the General Site Safety Hazard Analysis Checklist for project
PATRIOT ENGINEERING and Environmental, Inc. TRIP TICKET
6150 E.75th Street
Indianapolis IN 46250
317-576-8058 FAX: 317-576-1965
rqject'Inf618-0546-OIC:Brookshire Golf Clubhouse Materials Patriot Josh Dosztan
Testing Date,",-
Monda May 7,2018
'I
ClientGbIf Course 170clear
.Ldcati6n `,`.,Carme1,'.IN Patriot PIVI': JA/CS'-,
Mileage-(miles):..
T-lMEA'MILEA:GE:' Time:.(hr.4)
Briefing.Timb.'
"S" 77stait''. End Mlles!o
Time to- ite,:-, 0.25 Site:, 10
On-Site -- 2:30 PM 5:30 PM 3.00
use'00-:100 AM/PM o
Lundhi6-ffi•rsite .mi I lita r7U.me format 1-d 0.00
_
time to Office l, 0.25 10
o
L g
fniRppokihg,.T1:me-
Total Hours.14WorkedITotal.`Mileage:,'�,,..,�..'���::, Total,hours 10-,> 3.50 6 T6ta1'mfles)o,- 1 20
'Please check all applIcable fields
V #of, Proctor.Sa nip les . 90radation Samples ; #of Soil Class,
Cubes #of Grout PrismsF
of Ex/Grad S ! ensity
of,Block Prisms Samples #ofF.P.F.P.
_6S _,Daie of Sam"le
_J
uJ 06ffipressive.8trength x #of Sets of Cyls, 1 Tofalgof.Cyls- -
5
Flexdral.Strength #,of Sets of BeamsT6tal*o*f. e m'
s
Batdh
-0 Plant pre-Cast Plant Insp'. FF/FLT6sting`
0
. .....' i Windsor Probe,'," W of Probes
Grout Prisms
of Sets of Prisms Total#of Prisms
Z.
#,.6f:Sets Total#of Cubes
0 MoriOddrout Cubes of Cubes,
Batd :Plant'insp. Speoial Insp. other. •r
J :
o n
lnsp�' IF6 U ld Insp. NukdTDT
-]Pi164ns'1pection Load-rest Other
-7
Concrete Asphalt- Ma§dnrV,-",,
Corin Rig. N res,i*''
0 9 Generator 6.of Co
o
enetrations Patched Inches Cored
Fit-Up' lBolting Inspection.1 1Visu4-LVV6Id'1n'sp.
I ULU-
L
Liquid
_,n: - C Mag. Particle,
Re�sfeel Insp: Fireproofing Thick" Moisture Emission
P60 but Testing, Adhesion/,Cohesion' Paint Thickness
Temperature!0 AsphahN -'Density�l
Loose. ift Thickness un, uke
ientApproval
........................................................................................................................................................... ----—-------
Datd
5/7/2018
Comments.'
i have reviewed the General Site Safety Hazard Analysis Checklist for project.