Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
19
ROOF PLAN - AREA V SCALE: 1 =10 —0 GENERAL NOTES:=Ww�z<w�w�owNoo WALK PAD (PART OF ROOFING SYSTEM). DRAWING IS DIAGRAMMATIC ONLY. ROOF 3a MECHANICAL CONTRACTOR & SET BY Utn�ZOril 00 O`�Ix--3¢ GG �aoOU UU¢rOwOS O¢�d�Nd G1. PROVIDE POSITIVE ROOF DRAINAGE o=Fm==xz<i�OWNZ=ZG AROUND ALL ROOF TOP EQUIPMENT >>wZ�==�ZoG� FURNISHED & INSTALLED BY STRUCTURAL gym? o33ooNNZaoE G2. SEE MECHANICAL PLANS FOR zwlWoOFZ�ow���3� ADDITIONAL INFORMATION REGARDING ROOF oNZ�3w��=~oSw= z ozYwvox�oE TOP EQUIPMENT Qvao°amos.awo G3. ROOF CURBS PROVIDED BY WALK PAD (PART OF ROOFING SYSTEM). DRAWING IS DIAGRAMMATIC ONLY. ROOF 3a MECHANICAL CONTRACTOR & SET BY wa GG Q ROOFING CONTRACTOR ON FRAMES © 2013 BALAY ARCHITECTS, INC. Z FURNISHED & INSTALLED BY STRUCTURAL Q STEEL CONTRACTOR. ROOF CURBS FLASHED BUILD CRICKET BEHIND ROOF TOP G) ,o Ql _ INTO ROOF BY ROOFING CONTRACTOR 1 1 EQUIPMENT W/ TAPERED INSULATION TO Z INSURE PROPER DRAINAGE = > Q r-1 H W ¢ G4. SEE SHEET A461 FOR ROOF DETAILS 0 = cn z� ROOF ACCESS HATCH. SEE DETAIL 0 OO U-) �2 12 4/A461 LLI Q ROOFACCESS LADDER. SEE DETAIL ry 13 O;11111 I I1M00 J z U U r >= r 10:� w W > J KEY NOTES: W o J METAL COPING SYSTEM. MATCH uj 0 OSNAP—ON WALL COLOR Q FREESTANDING HYUNDAI ENTRY GATEWAY Z < OBELOW. SEE ELEVATIONS Q FULLY ADHERED SINGLE PLY HEAT OWELDED THERMOPLASTIC SHEET ROOF MEMBRANE SYSTEM (TPO) OVER 5" (2 w LAYERS OF 2-1/2") POLYISOCYAN U RATE LLI INSULATION z H TAPERED INSULATION CRICKET. PROVIDE Q V) 1/4" PER FOOT POSITIVE SLOPE TO 4 ROOF DRAIN. (TYP. OF ALL CRICKETS) c0 ROOF DRAIN & OVERFLOW DRAIN. SEE 0) ODETAIL 2/A461 & PLUMBING DRAWINGS 16'x8" SCUPPER IN PRECAST WALL. OSCUPPERS TO BE CUT IN FIELD TO ASSURE PROPER PLACEMENT. SEE DETAIL 5/A461 METAL CONDUCTOR BOX & 8"x6" ODOWNSPOUT — PAINT TO MATCH WALL l COLOR. CONNECT DOWNSPOUT TO UNDERGROUND SITE STORM DRAINAGE ❑ SYSTEM. SEE SITE DRAINAGE PLANS & DETAILS ON SHEET A461 METAL CONDUCTOR BOX & 6'x6" ODOWNSPOUT — PAINT TO MATCH WALL COLOR. CONNECT DOWNSPOUT TO UNDERGROUND SITE STORM DRAINAGE �51 SYSTEM. SEE SITE DRAINAGE PLANS & DETAILS ON SHEET A461 14"x8" OVERFLOW SCUPPER IN PRECAST OWALL, POSITIONED 12 FROM REGULAR SCUPPER WITH BOTTOM OF OPENING 2" HIGHER. SCUPPERS TO BE CUT IN FIELD TO ASSURE PROPER PLACEMENT. SEE DETAIL 6/A461 10 WALK PAD (PART OF ROOFING SYSTEM). DRAWING IS DIAGRAMMATIC ONLY. ROOF 3a wa GG CONTRACTOR TO INSTALL SUFFICIENTPADS we © 2013 BALAY ARCHITECTS, INC. FOR COMPLETE ROOF TOP EQU PMENTACCESS TO ALL ��IIIIIIIIII/�// Ny Z,Z \`\\ BUILD CRICKET BEHIND ROOF TOP G) ,o Ql _ y, 1 1 EQUIPMENT W/ TAPERED INSULATION TO ��' , t p INSURE PROPER DRAINAGE = > Q r-1 H W ¢ F— = cn z� ROOF ACCESS HATCH. SEE DETAIL 0 OO U-) �2 12 4/A461 00 Q ROOFACCESS LADDER. SEE DETAIL 13 O;11111 I I1M00 K E Y P L A N , &00`)// SCALE: NONE _V4 0 i Ln ROOF PLAN AREA V A1 62 3a wa GG we © 2013 BALAY ARCHITECTS, INC. ROOF PLAN AREA V A1 62