Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
33
� (SEE STRUCT BRG. � (SEE STRUCT JOIST-BRG. 1 1�3'-5" `►' FIN. D. FLC 100'-0" �' FINISH FLOOR WALL SECTION 3 SCALE: 1 2 =1 -0 STRUCT)) )IST BRG. STRUCT) )IST BRG. 113'- 5 " FLOOR --0" IR R.O. `r (SEE `r J01ST T ItOl. BEYOND 3E BEYOND I in 130'-O" OIL CAST PANEL `W 122'-0' OIL cWINDOW GENERAL NOTES: G1. SEE ELEVATIONS AND INTERIOR FINISH PLANS FOR PAINT COLOR AND FINISH SELECTIONS G2. STUD SUPPLIER TO CERTIFY AND DESIGN METAL STUD SYSTEM TO MEET THE CRITERIA IN THE STRUCTURAL DRAWINGS AND SPECIFICATIONS AND TO ACOMMODATE ALL MOVEMENT AND DEFLECTION OF THE STRUCTURAL SYSTEM (SEE SHT. A441) G3. STRUCTURAL ELEMENTS ARE SHOWN FOR BASIC REFERENCE ONLY. NOT ALL STRUCTURAL ELEMENTS THAT MAY BE REQUIRED ARE SHOWN. REFER TO STRUCTURAL PLANS FOR ALL SIZES, MATERIALS, LOADS, DIMENSIONS, AND ANY OTHER REQUIRED STRUCTURAL RELATED INFORMATION. IN THE EVENT THAT STRUCTURAL REFERENCE INFORMATION APPEARING ON THIS SHEET CONFLICTS WITH in ¢ N wpm ZUUw��- Z FyZ O '-2 0=ww�Z¢��mW V�UtnS� moWw=~— o�w000W o p=�mwx~wzN zO,aowar F�FF?t,cxiwa�z c~i�Nz�IzI+��c� um0Wa��OF ow ¢�UFw U ��0W ��dm3V Z= N Z O N U Z N w�wpo o w0 p¢'oa~ ox am3�a mj�mOQMWC INFORMATION SHOWN ON THE STRUCTURAL DRAWINGS, THE STEEL CHANNEL (SEE STAIR DRAWINGS) STRUCTURAL DRAWINGS SHALL TAKE PRECEDENCE. 5G KEY NOTES: � 3A SEE STRUCTURAL FOUNDATION PLANS FOR WORK BELOW FINISH c 3 B FLOOR OR GRADE CONCRETE SLAB ON GRADE (SEE STRUCTURAL) 0 - 3C CONCRETE FLOOR SLAB (SEE STRUCTURAL) U DOOR R PRE -CAST CONCRETE WALL PANELS, 12'-0" WIDE & Q 3D 10" THICK NOM. (SEE PLANS & ELEVATIONS), Ll - 5K INSULATED. EMBEDMENT PLATES & BARS, ETC. BY P.C. 7N CONTINUOUS METAL FLASHING AS REQUIRED SUPPLIER. SCORED AS INDICATED ON WALL SECTIONS & a STEEL COLUMN OR POST (SEE STRUCTURAL DRAWINGS) ELEVATIONS. PAINTED AS INDICATED ON ELEVATIONS & - — WALL TYPE/ FINISH PIANS 5 M 3E PRE -CAST CONC. REVEAL, 1/2" DEEP, 1-1/2" WIDE in 5 N AT SURFACE, 1/2" WIDE AT BOTTOM, WITH 45' BEVELED 0 SIDES. SEE EXTERIOR ELEVATIONS FOR VERTICAL �J REVEALS (SAME PROFILE AS HORIZ. REVEALS. SEE SQ ALUMINUM BRAKE METAL WITH FINISH TO MATCH DETAIL 1/A332) Q 3 F 8" PRECAST CONCRETE ROOF PLANKS (SEE STRUCT.) w 3G SEE CIVIL FOR SITE CONCRETE OR GRADE (BY OTHERS) STEEL TUBE SEE 3H CORE DRILL CONCRETE & SET RAIL POST IN EPDXY O Q GROUT 3J CONCRETE STAIR LANDING (SEE STAIR DRAWINGS) Q EXPOSED EXTERIOR TUBE WITH ON-SITE INJECTED 4A 5'x5' OPENING IN PRECAST - INFILL WITH 12"x12" OFILL 7l1 FOAM INSULATION GLASS BLOCK W/ CROSS RIBBED UNIFORM PATTERN, F2 m INSTALLED PER GLASS BLOCK MFR. RECOMMENDATIONS w 4 B 8 STANDARD CONCRETE BLOCK (SEE STRUCTURAL FOR z 7W REFER TO MECHANICAL PLANS FOR EXTENT OF HEATED REINFORCING) 5A 1 5/8" METAL STUDS (PER STUD SUPPLIER) Q 5B 3 5/8" METAL STUDS (PER STUD SUPPLIER) LLJo 5C 6" METAL STUDS (PER STUD SUPPLIER) o 5 D 8" METAL STUDS (PER STUD SUPPLIER) PROPER DRAINAGE OF STOREFRONT & ACM SYSTEMS 5 E METAL STUD BRACE/CONNECTION (PER STUD SUPPLIER) o FINISH/COLOR TO MATCH STOREFRONT SYSTEM Lv cr J J Z Ir qd LLJ Of H I) t CO C� 5 JF STRUCT STEEL CHANNEL (SEE STAIR DRAWINGS) D 5G STAIR TREAD & RISER; CONC. FILLED METAL PAN WITH O c VINYL TREADS, RISERS & BASE (SEE STAIR DRAWINGS) 6F PEEL & STICK 12"x12" VINYL TILE (SELECTED BY OWNER) 0 - 110'-0" 5H 1-1/2"0 STEEL HANDRAIL, PAINTED DOOR R TOTAL THICKNESS), R-30 MIN. 5J 1-1/2"0 STEEL GUARDRAIL PAINTED B FULLY ADHERED SINGLE PLY HEAT WELDED THERMO- [Ell 5K WELD PIPE RAIL TO TOP FLANGE OF CHANNEL 7N CONTINUOUS METAL FLASHING AS REQUIRED 7C EXTEND MEMBRANE FLASHING OVER TOP OF PARAPET 5 L O STEEL COLUMN OR POST (SEE STRUCTURAL DRAWINGS) 7D ROOF COPING SYSTEM, HICKMAN 'PERMASNAP', MATCH - COLOR OF ACM 5 M DEFLECTION CLIP (SEE DRAWING A441) 7E ALUMINUM COMPOSITE MATERIAL (ACM) BUILDING PANEL o- 5 N BOXED STUD HEADER OR BEAM (PER STUD SUPPLIER) 0 5P LINTEL (SEE STRUCTURAL) 7H FIBERGLASS BATT INSULATION WITH 6 MIL REINFORCED SQ ALUMINUM BRAKE METAL WITH FINISH TO MATCH FIRE RETARDANT VAPOR BARRIER, R-19 MIN. N 7S CONTINUOUS ALUMINUM TRACK TO ALLOW MOISTURE ADJACENT CURTAIN WALL OR STOREFRONT FRAME o Y 5 R STEEL TUBE SEE w ( URAL) 116'-1 AltSS ALUMINUM BRAKE METAL WITH FINISH TO MATCH WINDOW O ADJACENT CURTAIN WALL OR STOREFRONT FRAME 5T 8" METAL STUD JOIST (PER STUD SUPPLIER) 5U METAL CORNER BEAD \\\O\Ny I111J��� //��/�i/,� 5V STAIR SUPPORT POST (SEE STAIR DRAWINGS) N C7p Q� m v- 4 STEEL 1"0 VERTICAL BALLUSTERS AT 4" O.C. MAX., _ Q - ,;1-O Z W SW PAINTED = j I- 0 T-4 w -� 2Z F- 8 5X 2x2x1/4 STEEL ANGLE (BY STOREFRONT SUPPLIER) 00 F- 2 � 00 �~�� 6A 2x TREATED WOOD NAILER �i �6- Q' 66 3/4" CDX PLYWOOD SHEATHING ���/JIf 1I 111111\\\� WALL SECTION 2 SCALE: WALL SECTION SCALE: 1 2 =1 -0 0 c U cC o <r10 »� co � y°U C) 00 o .✓:: �° �` .14 aw ) 4 M 7K BACKER ROD & SEALANT 7 L TRIM FLASHING TO SEAL OPENINGS AND/OR ALLOW 6C 5/8" CDX PLYWOOD SHEATHING 6 D 3/4" SOLID SURFACE STOOL. EXTEND 1" BEYOND WALL 0 LINE 6E 1/2" EXTERIOR FIBER CEMENT SHEATHING c 6F PEEL & STICK 12"x12" VINYL TILE (SELECTED BY OWNER) 0 - 110'-0" 7A (2) LAYERS POLYI SOCYAN U RATE RIGID INSULATION (5" DOOR R TOTAL THICKNESS), R-30 MIN. 7M REVEAL IN ACM PANEL (SEE DETAIL 1/A332) B FULLY ADHERED SINGLE PLY HEAT WELDED THERMO- PLASTIC SHEET ROOF MEMBRANE SYSTEM (TPO) 7N CONTINUOUS METAL FLASHING AS REQUIRED 7C EXTEND MEMBRANE FLASHING OVER TOP OF PARAPET O 7D ROOF COPING SYSTEM, HICKMAN 'PERMASNAP', MATCH - COLOR OF ACM 0 7 P SCUPPER AND DOWNSPOUT (SEE ELEVATIONS) 7E ALUMINUM COMPOSITE MATERIAL (ACM) BUILDING PANEL o- Ft 7F FLUID APPLIED MOISTURE/AIR BARRIER 0 7G 1/2" EXPANSION JOINT MATERIAL AND SEALANT c 7H FIBERGLASS BATT INSULATION WITH 6 MIL REINFORCED m FIRE RETARDANT VAPOR BARRIER, R-19 MIN. N 7S CONTINUOUS ALUMINUM TRACK TO ALLOW MOISTURE 7J 2" RIGID INSULATION, R-10 MIN. o Y V) DRAINAGE WALL SECTION 2 SCALE: WALL SECTION SCALE: 1 2 =1 -0 0 c U cC o <r10 »� co � y°U C) 00 o .✓:: �° �` .14 aw ) 4 M 7K BACKER ROD & SEALANT 7 L TRIM FLASHING TO SEAL OPENINGS AND/OR ALLOW - MOISTURE DRAINAGE AS REQUIRED (COMPONENT OF METAL PANEL SYSTEM) 7M REVEAL IN ACM PANEL (SEE DETAIL 1/A332) 7N CONTINUOUS METAL FLASHING AS REQUIRED O n 7 P SCUPPER AND DOWNSPOUT (SEE ELEVATIONS) Ft 70 POLYETHELENE VAPOR BARRIER m U w 7R TERMINATION BAR & SEALANT m 0 N 7S CONTINUOUS ALUMINUM TRACK TO ALLOW MOISTURE o Y V) DRAINAGE w Q 7T METAL BOX SCUPPER & DOWNSPOUT (SEE SHEET A461) = u z - EXPOSED EXTERIOR TUBE WITH ON-SITE INJECTED OFILL 7l1 FOAM INSULATION F2 m 7V LINEAR METAL CEILING WITH CARRIER CHANNELS 7W REFER TO MECHANICAL PLANS FOR EXTENT OF HEATED N SLAB AND RIGID INSULATION IN SHOWROOM w r LLJo 7X METAL FLASHING INSTALLED ON PRECAST TO ALLOW o z o PROPER DRAINAGE OF STOREFRONT & ACM SYSTEMS z 5.: o FINISH/COLOR TO MATCH STOREFRONT SYSTEM PRECASTER NOTE: SLOPE PRECAST 1/2" OUTSIDE OF Y STOREFRONT FRAMING (SEE DETAIL 2/A332) Q 7Y FIRE STOP INSULATION & CAULKING TO SEAL TIGHT 8D (SEE PLANS & A5xx SHEETS) 8E ALUMINUM WINDOW SYSTEM (SEE PLANS & A5xx SHEETS) 9A 5/8" TYPE 'Xn' GYPSUM BOARD (GYP. BD. ABOVE CEILING TO BE TAPED ONLY 8A DOOR (SEE PLANS & A5xx SHEETS) Q W Q 8 B DOOR, OVERHEAD (SEE PLANS & A5xx SHEETS) © 2013 BALAY ARCHITECTS, INC. 8C COILING SECURITY DOOR. (SEE A5xx SHEETS) WALL SECTIONS ALUMINUM STOREFRONT SYSTEM 4 1/211 x2 MULLIONS 9B ACOUSTICAL TILE CEILING (SEE CEILING PLANS) A327 9C RESILIENT CHANNELS FOR GYP, BD. CEILING SUPPORT, BRACE TO STRUCTURE AS REQUIRED 0 0 rn 3