HomeMy WebLinkAbout75ABBREVIATIONS
SYMBOLS
AFF
ABOVE FINISH FLOOR
PIPING LINETYPES
PRIOR TO PROCUREMENT CONTRACTOR SHALL SUBMIT TO
ACCU
CONDENSATE DRAIN
CND
ARCHITECT FULL SUBMITTALS FOR ALL ENERGY
COLD WATER DOMESTIC
CW
COMPRESSED AIR
CA
GREASE/OIL/DIRT DRAIN LINE
GL
BDD
GAS NATURAL OR PROPANE
GAS
GRILLES, DIFFUSERS AND LOUVERS. SUBMITTALS SHALL BE
GEOTHERMAL HEAT PUMP WATER RETURN
GEOR
GEOTHERMAL HEAT PUMP WATER SUPPLY
GEOS
HOT WATER DOMESTIC
HWS
CO
IN -FLOOR HEATING WATER RETURN
IFR
ALL MODEL NUMBERS AND ALL ACCESSORIES AND OPTIONS
IN -FLOOR HEATING WATER SUPPLY
IFS
SANITARY SEWER
SAN
STORM DRAIN
SD
CA
PIPING SYMBOLS
APPROVED EQUAL. ENGINEER RESERVES THE RIGHT TO
CFM
CUBIC FEET PER MINUTE
ANCHOR
X -
DEGREES FARENHEIT
BALL VALVE
DcQ
DB
BUTTERFLY VALVE
I ri
EXAMINE ALL CONDITIONS THAT MAY IN ANY WAY AFFECT
CHECK, SWING VALVE
N
DROP
EXPANSION JOINT
�-
EA
EXHAUST AIR OR EACH
FLANGED CONNECTION�-
BRANCHES OF WORK MAKING REFERENCE TO THEM FOR
E
EXHAUST GRILLE OR REGISTER
FLEXIBLE PUMP CONNECTION
DETAILS OF EXISTING BUILDING CONDITIONS. NO EXTRAS
GAS METER
GM
EADB
ENTERING AIR DRY BULB
GATE VALVE
WORK IN THE BID. CONTRACTOR SHALL GUARANTEE ALL
EAWB
ENTERING AIR WET BULB
GLOBE VALVE
I b I
BALANCING VALVE
PERIOD OF ONE (1) YEAR FROM DATE OF ACCEPTANCE.
EC
ELECTRICAL CONTRACTOR
"P" TRAP
v
EF
EXHAUST FAN
PIPE GUIDE
"
PITCH DOWN IN DIRECTION OF ARROW
ARE NOT INTENDED TO DEFINE EXACT QUANTITIES,
EWH
ELECTRIC WALL HEATER
PLUG VALVE
b
EWC
ELECTRIC WATER COOLER
PRESSURE GAUGE
Q
RUN OUT
AND PAY FOR ALL REQUIRED PERMITS.
ERC
ELECTRIC REHEAT COIL
RUN OUT OFF BOTTOM OF MAIN
ESP
EXTERNAL STATIC PRESSURE
RUN OUT OFF TOP OF MAIN
y
TEE OFF SIDE OF MAIN
ASHRAE 90.1 ENERGY CODE, PERTINENT STATE, COUNTY,
ET
EXPANSION TANK
TEST PLUG
CITY CODES AND ORDINANCES WITH INDIANA AMENDMENTS.
F
THERMOMETER
UNION
5.
CONCEALED LOW PRESSURE ROUND DUCTWORK SHALL BE
WATER METER
O
"Y" STRAINER
FD
FIRE DAMPER OR FLOOR DRAIN
MECHANICAL SYMBOLS
1" PRESSURE CLASS, SEAL CLASS A. INSULATED FLEXIBLE
FD/SD
2 -WAY TEMPERATURE CONTROL VALVE
p�
DUCTING FOR CONNECTIONS TO DIFFUSERS SHALL NOT
3 -WAY TEMPERATURE CONTROL VALVE
CONDENSING UNIT
FPM
FEET PER MINUTE
CLASS 1 AIR DUCT, POLYESTER FILM LAMINATED ON STEEL
FPVAV
EXHAUST GRILLE
WIRE REINFORCING, WITH 1.5" THICK, 3/4 DENSITY
EXHAUSTFAN
FIBERGLASS INSULATION AND FIRE RETARDANT
FT
FOOT
FIRE DAMPER
FD
FSK
COMBINATION FIRE/SMOKE DAMPER
FD
SD
FURNACE OR FAN COIL UNIT
6.
EXPOSED ROUND DUCTWORK SHALL BE LINDAB OR
LINEAR DIFFUSER
GENERAL CONTRACTOR
LINED DUCT
-- -- --
GALLONS PER MINUTE
MOTORIZED DAMPER
�-
H
HOOD
WITH NO SEALER. EDPM RUBBER GASKET SHALL BE U.L.
RETURN AIR GRILLE
CLASSIFIED RATING OF FLAME SPREAD 0 AND SMOKE
HWR
HOT WATER RETURN DOMESTIC
ROUND
0
HWS
SENSOR
Q
E84 -91A SMACNA LEAKAGE CLASS 3. FITTINGS SHALL BE
SUPPLY DIFFUSER OR REGISTER
MANUFACTURED USING ONE OR MORE OF THE
IN
INCH
FOLLOWING CONSTRUCTION METHODS: OVERLAPPED
IR
THERMOSTAT
0
EDGES STITCH WELDED ALONG THE ENTIRE LENGTH OF
TURNING VANES DOUBLE THICKNESS
LAVATORY
MANUAL VOLUME DAMPER LOCKING WITH SHAFT
DIFFUSER MARK
X-# DIFFUSER
XXX TAG
:CFM
INTERNALLY SEALED BUTTON PUNCHED AND INTERNALLY
ABBREVIATIONS
MECHANICAL SPECIFICATIONS
AFF
ABOVE FINISH FLOOR
1.
PRIOR TO PROCUREMENT CONTRACTOR SHALL SUBMIT TO
ACCU
AIR COOLED CONDENSING UNIT
ARCHITECT FULL SUBMITTALS FOR ALL ENERGY
AHU
AIR HANDLING UNIT
CONSUMING OR PRODUCING ITEMS AND FOR ALL DUCT
ACCESSORIES, INSULATION, VAV BOXES, REGISTERS,
BDD
BACKDRAFT DAMPER
GRILLES, DIFFUSERS AND LOUVERS. SUBMITTALS SHALL BE
BOD
BOTTOM OF DUCT
DELINEATED WITH TAGS INDICATED ON PRINTS,
CONTRACTORS NAME, PROJECT NAME. CLEARLY INDICATE
CO
CLEAN OUT
ALL MODEL NUMBERS AND ALL ACCESSORIES AND OPTIONS
CW
COLD WATER DOMESTIC
BEING PROVIDED. SUBMISSIONS SHALL BE IN PDF FORMAT.
ALL EQUIPMENT AND ITEMS SHALL BE PER DESIGN BASIS OR
CA
COMBUSTION AIR
APPROVED EQUAL. ENGINEER RESERVES THE RIGHT TO
CFM
CUBIC FEET PER MINUTE
REJECT ANY SUBSTITUTE ITEM.
DEG F
DEGREES FARENHEIT
2.
CONTRACTOR SHALL BE RESPONSIBLE TO VISIT THE SITE TO
DB
DRY BULB
EXAMINE ALL CONDITIONS THAT MAY IN ANY WAY AFFECT
0
DIAMETER
THE EXECUTION OF HIS WORK. HE SHALL ALSO EXAMINE
THE DRAWINGS AND SPECIFICATIONS FOR OTHER
EA
EXHAUST AIR OR EACH
BRANCHES OF WORK MAKING REFERENCE TO THEM FOR
E
EXHAUST GRILLE OR REGISTER
DETAILS OF EXISTING BUILDING CONDITIONS. NO EXTRAS
WILL BE ALLOWED FOR FAILURE TO INCLUDE ALL REQUIRED
EADB
ENTERING AIR DRY BULB
WORK IN THE BID. CONTRACTOR SHALL GUARANTEE ALL
EAWB
ENTERING AIR WET BULB
LABOR AND MATERIALS ENTERING INTO CONTRACT FOR A
PERIOD OF ONE (1) YEAR FROM DATE OF ACCEPTANCE.
EC
ELECTRICAL CONTRACTOR
EF
EXHAUST FAN
3.
THE DRAWINGS IN THIS SECTION ARE DIAGRAMMATIC AND
ARE NOT INTENDED TO DEFINE EXACT QUANTITIES,
EWH
ELECTRIC WALL HEATER
LOCATIONS OR CODIFIED REQUIREMENTS. DRAWINGS
EWC
ELECTRIC WATER COOLER
SHOW GENERAL INTENT OF SYSTEMS. M.C. SHALL PROVIDE
AND PAY FOR ALL REQUIRED PERMITS.
ERC
ELECTRIC REHEAT COIL
ESP
EXTERNAL STATIC PRESSURE
4.
ALL WORK SHALL BE IN FULL ACCORDANCE WITH 2008 IMC,
ASHRAE 90.1 ENERGY CODE, PERTINENT STATE, COUNTY,
ET
EXPANSION TANK
CITY CODES AND ORDINANCES WITH INDIANA AMENDMENTS.
F
FURNACE
5.
CONCEALED LOW PRESSURE ROUND DUCTWORK SHALL BE
FCU
FAN COIL UNIT
CONSTRUCTED PER SMACNA LOW PRESSURE STANDARDS,
FD
FIRE DAMPER OR FLOOR DRAIN
1" PRESSURE CLASS, SEAL CLASS A. INSULATED FLEXIBLE
FD/SD
FIRE AND SMOKE DAMPER
DUCTING FOR CONNECTIONS TO DIFFUSERS SHALL NOT
EXCEED 7 FEET. FLEXIBLE DUCT EQUAL TO FLEXIBLE DUCT
FPM
FEET PER MINUTE
CLASS 1 AIR DUCT, POLYESTER FILM LAMINATED ON STEEL
FPVAV
FAN POWERED VAV BOX
WIRE REINFORCING, WITH 1.5" THICK, 3/4 DENSITY
FIBERGLASS INSULATION AND FIRE RETARDANT
FT
FOOT
REINFORCED VAPOR BARRIER.
FSK
FOIL SCRIM VAPOR BARRIER
6.
EXPOSED ROUND DUCTWORK SHALL BE LINDAB OR
GC
GENERAL CONTRACTOR
EQUAL GALVANIZED STEEL CONFORMING TO ASTM
GPM
GALLONS PER MINUTE
STANDARDS A653 AND A924 GASKETED SPIRAL DUCTING
H
HOOD
WITH NO SEALER. EDPM RUBBER GASKET SHALL BE U.L.
CLASSIFIED RATING OF FLAME SPREAD 0 AND SMOKE
HWR
HOT WATER RETURN DOMESTIC
DEVELOPED 5 IN ACCORDANCE WITH ASTM STANDARD
HWS
HOT WATER SUPPLY DOMESTIC
E84 -91A SMACNA LEAKAGE CLASS 3. FITTINGS SHALL BE
MANUFACTURED USING ONE OR MORE OF THE
IN
INCH
FOLLOWING CONSTRUCTION METHODS: OVERLAPPED
IR
INFRA -RED
EDGES STITCH WELDED ALONG THE ENTIRE LENGTH OF
LAV
LAVATORY
THE FITTING STANDING SEAM GORE LOCKED AND
INTERNALLY SEALED BUTTON PUNCHED AND INTERNALLY
LAT
LEAVING AIR TEMPERATURE
SEALED. ELBOWS 3 -INCH THROUGH 12 -INCH DIAMETER
LS
LINEAR SLOT DIFFUSER
WILL BE DIE STAMPED AND CONTINUOUSLY STITCH
WELDED.
MAN
MANUAL
MFR
MANUFACTURER
7.
PROVIDE SHEET METAL 9.0 FOR ALL TURNS DO NOT USE
MBH
1000 BTUH
FLEXIBLE DUCT FOR GREATER THAN 45 DEG CHANGES IN
DIRECTION. PROVIDE MANUAL BALANCING DAMPERS FOR
MC
MECHANICAL CONTRACTOR
ALL SUPPLY AIR RUNS. ROUND DAMPERS SHALL BE
MCC
MOTOR CONTROL CENTER
SECURED ON BOTH SIDES OF DUCT AND SHALL CONTAIN
LOCKING HANDLE. SPIRAL DUCTS SHALL USE SPIRAL STYLE
MS
MOP SINK
DAMPERS WITH FULL WIDTH SHAFT AND NYLON BEARINGS
OA
OUTSIDE AIR
AT EACH END. RECTANGULAR DUCTS SHALL USE MULTI OR
SINGLE BLADE WELDED FRAMED DAMPERS WITH JACK
PC
PLUMBING CONTRACTOR
SHAFTS AND LOCKING HANDLE. INSTALL NYLON RIBBON ON
PRV
PRESSURE RELEIF VALVE
ALL DAMPER HANDLES TO AID IN LOCATION OF DAMPER.
PSI
POUNDS PER SQUARE INCH
8.
UPON COMPLETION OF THE MECHANICAL INSTALLATION,
PD
PRESSURE DROP
DEMONSTRATE TO THE ENGINEER AND THE OWNER'S
SATISFACTION THAT THE SYSTEMS HAVE BEEN INSTALLED
PDU
POOL DEHUMIDIFICATION UNIT
IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS
PRV
PRESSURE RELEIF VALVE
AND APPLICABLE CODES. DEMONSTRATE THE DYNAMIC
PSI
POUNDS PER SQUARE INCH
OPERATION OF EACH SYSTEM. VERIFY PROPER OPERATION
OF EQUIPMENT, FILTERS ARE CLEAN AND COMPONENTS OF
PTAC
PACKAGE TERMINAL AIR CONDITIONER
THE SYSTEM ARE INSTALLED AND ADJUSTED IN FULL
RA
RETURN AIR
ACCORDANCE WITH MANUFACTURER RECOMMENDATIONS.
RJ
ROOF JACK, MATCH ROOF COLOR
9.
RECTANGULAR DUCTWORK SHALL BE CONSTRUCTED IN
RPZB
REDUCED PRESSURE ZONED BACKFLOW
ACCORDANCE WITH SMACNA LOW PRESSURE DUCT
STANDARDS, +/- 1.0" W.C. FROM ASTM A 653/A 653M G-90
RPM
REVOLUTIONS PER MINUTE
COATED GALVANIZED SHEET STEEL. SEAMS SHALL BE
RTU
ROOF TOP UNIT
PITTSBURGH CONSTRUCTION, NO BUTTON PUNCH OR SNAP
LOCK SEAMS ARE ACCEPTABLE. SEAL ALL TRANSVERSE AND
SA
SUPPLY AIR
LONGITUDINAL SEAMS WITH WATER BASED DUCT SEALER,
SAF
SUPPLY AIR FAN
SEAL CLASS B. GAUGE AND JOINT CLASSIFICATIONS
SP
STATIC PRESSURE
ACCEPTABLE ARE AS FOLLOWS, ALL SECTION LENGTHS ARE
48" MAXIMUM, REFER TO SMACNA RIGIDITY TABLES FOR
SAN
SANITARY SEWER
GAUGES ON LONGER SECTIONS IF REQUIRED:
SD
STORM DRAIN
< 12" 26 GAUGE, FLAT S AND DRIVE
ST
STORAGE TANK
12"-24" 24 GAUGE, FLAT S AND DRIVE
SK
SINK
25"-34" 22 GAUGE, STANDING S AND FLAT DRIVE
34"-40" 22 GAUGE, STANDING S AND STANDING DRIVE
TCC
TEMPERATURE CONTROL CONTRACTOR
>40" REFER TO SMACNA FOR STANDARDS.
TMV
THERMOSTATIC MIXING VALVE
TYPE I HOOD EXHAUST DUCTWORK SHALL BE CONSTRUCTED
TSP
TOTAL STATIC PRESSURE
IN ACCORDANCE WITH IMC SECTION 506.3 WITH INDIANA
UR
URINAL
AMENDMENT, 675 IAC -18-1.5-6 USING WELDED 16 GAUGE
BLACK IRON.
LION
UNLESS OTHERWISE NOTED
VAV
VARIABLE AIR VOLUME BOX
10.
PROVIDE GALVANIZED MINIMUM 22 GAUGE 1" WIDE STRAP
TO HANG RECTANGULAR DUCTWORK 24" AND LESS IN
VTR
VENT THROUGH ROOF
WIDTH. PROVIDE UNI -STRUT OR WITH 3/8" ROD TO HANG
WC
WALL CAP
RECTANGULAR DUCTWORK GREATER THAN 24" IN WIDTH.
WC
WATER CLOSET
PROVIDE GRIPPLE, DURODYNE OR EQUAL CABLE HANGERS
FOR HANGING ROUND DUCTWORK. ALL FLEXIBLE DUCT
WH
WATER HEATER
SHALL BE HUNG WITH MINIMUM 3" WIDE NYLON STRAP.
WIC
WALK IN COOLER
SUPPORT ALL HANGERS FROM STRUCTURE PER SMACNA
STANDARDS.
WIF
WALK IN FREEZER
11.
INSTALL ALL INSULATION IN STRICT ACCORDANCE WITH
MANUFACTURERS INSTRUCTIONS IN A TIGHT AND NEAT
MANOR. NO SAGGING, FRAYED OR TORN INSULATION WILL
BE EXCEPTED. UNLESS OTHERWISE NOTED ON PLANS
DUCTWORK SHALL BE INSULATED AS FOLLOWS:
SA/RA- IN CONDITIONED SPACES AND RETURN AIR
PLENUMS WHERE CONCEALED BY CONSTRUCTION
OR IN MECHANICAL ROOMS. 1-1/2" FSK DUCT WRAP
OR 1" LINER. WHERE LINER IS USED DUCT SIZES
SHALL BE ADJUSTED TO ACCOMMODATE LINER.
DIMENSIONS ON PLANS ARE NET FREE AREA.
SA/RA- IN UNCONDITIONED SPACES WHERE CONCEALED
BY CONSTRUCTION WITHIN THE BUILDING
INSULATION LINE. 2" FSK DUCT WRAP MINIMUM R-6.0
EA- IN UNCONDITIONED OR ATTIC SPACES OUTSIDE THE
BUILDING ENVELOPE; 1-1/2" FSK DUCT WRAP
MINIMUM R-3.5.
OA- IN UNCONDITIONED OR ATTIC SPACES OUTSIDE THE
BUILDING ENVELOPE; 1-1/2" MINIMUM R-3.5 FSK
DUCT WRAP.
OA- EXPOSED OR IN MECHANICAL ROOMS, 1-1/2
FIBERGLASS RIGID BOARD INSULATION WITH FOIL
SCRIM LAGGED WITH 0.024 Al JACKET.
ALL- ALL DUCT INSULATION SHALL BE INSTALL TIGHT
AND NEAT WITH BANDING, TAPE AND CLIPS AS
RECOMMENDED BY MANUFACTURER. DUCT
INSULATION MATERIALS SHALL HAVE A FLAME
SPREAD RATING OF 25 OR LESS (ON THE FLAME
SPREAD TEST SCALE) AND SMOKE DEVELOPMENT
OF 50 OR LESS (ON THE SMOKE TEST SCALE) OR
AS DEFINED BY NFPA 255 STANDARD METHOD OF
TESTING OF SURFACE BURNING CHARACTERISTICS
OF BUILDING MATERIALS, LOCAL CODES AND LOCAL
AUTHORITIES HAVING JURISDICTION.
12. LABEL ALL MAJOR PIECES OF EQUIPMENT WITH LAMACOID
PLASTIC, BLACK WITH WHITE LETTERS. SIZE TO BE
CONSISTENT WITH EQUIPMENT BEING LABELED. LENGTH
AND WIDTH VARY FOR REQUIRED LABEL CONTENT, BUT NOT
LESS THAN 2-1/2 BY 3/4 INCH FOR EQUIPMENT,
THERMOSTAT AND SENSOR LABELS SHALL BE ADJUSTED TO
PROVIDE ESTHETIC APPEARANCE. MINIMUM LETTER SIZE:
3/8 INCH FOR NAME OF UNITS IF VIEWING DISTANCE IS LESS
THAN 24 INCHES, 5/8 INCH FOR VIEWING DISTANCES UP TO
72 INCHES.
13. PROVIDE AIR BALANCE BY CERTIFIED NEBB OR AABC
CONTRACTOR. AIR BALANCE IN ACCORDANCE WITH
CURRENT SMACNA, NEEB OR AABC STANDARDS. PROVIDE
WRITTEN REPORT TO ARCHITECT.
14. MECHANICAL CONTRACTOR SHALL ENSURE EMPLOYEES
ARE MEETING ALL OSHA AND JOB SPECIFIC SAFETY
REQUIREMENTS. PERSONAL PROTECTIVE EQUIPMENT
SHALL BE UTILIZED AS REQUIRED.
15. TEMPERATURE CONTROL WORK SHALL BE THE
RESPONSIBILITY OF THE HVAC CONTRACTOR. PROVIDE ALL
COMPONENTS INCLUDING T/S, T/S WIRE (PLENUM RATED IN
RA PLENUMS), SWITCHES, ACTUATORS ETC. AS REQUIRED
FOR A COMPLETE SYSTEM. E.C. SHALL PROVIDE ALL
RACEWAYS FOR CONCEALED AND EXPOSE ROUTING. PRIOR
TO CONSTRUCTION, M.C. SHALL COORDINATE ALL CONDUIT
AND POWER REQUIREMENTS NEEDED FOR TEMPERATURE
CONTROLS WITH E.C.
PLUMBING SPECIFICATIONS
1. PRIOR TO PROCUREMENT CONTRACTOR SHALL SUBMIT TO
ARCHITECT FULL SUBMITTALS FOR ALL ENERGY CONSUMING
OR PRODUCING ITEMS AND FOR ALL PLUMBING FIXTURES,
VALVES, DRAINS, CLEAN OUTS, PIPING, PIPING ACCESSORIES,
INSULATION AND PIPING HANGERS. SUBMITTALS SHALL BE
DELINEATED WITH TAGS INDICATED ON PRINTS,
CONTRACTORS NAME, PROJECT NAME. CLEARLY INDICATE
ALL MODEL NUMBERS AND ALL ACCESSORIES AND OPTIONS
BEING PROVIDED. SUBMISSIONS SHALL BE IN PDF
FORMAT.ENGINEER RESERVES THE RIGHT TO REJECT ANY
SUBSTITUTE ITEM.
2. PLUMBING WORK SHALL BE COMPLETE IN EVERY DETAIL AND
ALL MISCELLANEOUS ITEMS OF MATERIAL AND LABOR
NECESSARY TO COMPLETE THE WORK DESCRIBED, SHOWN
OR REASONABLY IMPLIED ON DRAWINGS OR SPECIFICATIONS
SHALL BE INCLUDED IN THE CONTRACT. CONTRACTOR SHALL
MAKE MINOR ADJUSTMENTS TO THE WORK WHERE
REQUIRED, WHEN SUCH ADJUSTMENTS ARE NECESSARY FOR
PROPER OPERATION AND WITHIN THE INTENT OF THE
CONTRACT. CONTRACTOR SHALL GUARANTEE ALL LABOR
AND MATERIALS ENTERING INTO CONTRACT FOR A PERIOD
OF ONE (1) YEAR FROM DATE OF ACCEPTANCE.
3. ALL WORK SHALL BE IN FULL ACCORDANCE WITH 1997 UPC,
2007 ASHRAE 90.1 ENERGY CODE, PERTINENT STATE,
COUNTY, CITY CODES AND ORDINANCES WITH INDIANA
AMENDMENTS.
4. PLUMBING CONTRACTOR SHALL VISIT THE SITE AND VIEW ALL
EXISTING CONDITIONS BEFORE SUBMITTING A PROPOSAL
FOR THE WORK AS DESCRIBED AND SHOWN. NO EXTRAS
WILL BE ENTERTAINED FOR FAILURE TO MAKE THIS VISIT.
5. PLUMBING CONTRACTOR SHALL ACCEPT SOLE AND
COMPLETE RESPONSIBILITY FOR CONDITIONS OF THE JOB
SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY
DURING PERFORMANCE OF THE WORK.
6. PLUMBING CONTRACTOR SHALL VERIFY AND BE
RESPONSIBLE FOR ALL PLUMBING ROUGH -INS, SHALL
CONSULT WITH THE LOCAL WATER COMPANY, PROVIDE ALL
MATERIALS AND LABOR AND PAY ALL COSTS NOT BORNE BY
THE LOCAL WATER COMPANY INCLUDING SECURE AND PAY
FOR ALL REQUIRED PERMITS.
7. ALL EXPOSED SUPPLY PIPES AND METAL TRIM IN
CONNECTION WITH THE FIXTURES SHALL BE CHROME
PLATED RED BRASS OR BRONZE, PROVIDE CHROME PLATED
STOP VALVES IN ALL SUPPLIES TO ALL FIXTURES. CAULK ALL
FIXTURES WITH WATERPROOF SILICONE CAULK. TRAPS
SHALL HAVE CLEANOUT PLUGS. INSTALL ONE PIECE CHROME
ESCUTCHEON PLATE WITH SET SCREW AT WALL
PENETRATIONS.
8. PIPING TYPES UNLESS OTHERWISE NOTED ON PLANS::
GAS/AIR BLACK STEEL: ASTM A53. Al 05 OR A120.
WATER COPPER TUBING (BELOW SLABS AND EXTERIOR, 3"
OR SMALLER): ASTM 888 TYPE 'K', SOFT TEMPER
SOFT, NO JOINTS PERMITTED BELOW GROUND.
WATER COPPER TUBING (INSIDE BUILDING, 4" OR SMALLER):
ASTM 888, TYPE 'L' HARD TEMPER.
CAST -COPPER SOLDER -JOINT FITTINGS: ANSI B16
J8.WROUGHT-COPPER SOLDER JOINT FITTINGS:
ANSI 816.22
SEWER POLYVINYL CHLORIDE SEWER PIPE (PVC): ASTM
D2729 SCHEDULE 40. INSULATED IN RETURN AIR
PLENUMS.
CONDENSATE POLYVINYL CHLORIDE DRAIN, WASTE AND VENT
PIPE (PVC) SCHEDULE 40 MINIMUM SIZE 3/4".
INSULATED IN RETURN AIR PLENUMS.
VENTING POLYVINYL CHLORIDE DRAIN, WASTE AND VENT
PIPE (PVC): ASTM D2665. INSULATED IN RETURN
AIR PLENUMS.
STORM SERVICE WEIGHT CAST IRON WITH HUB AND
SPIGOT JOINTS. ASTM A 74 WITH ASTM C 564
RUBBER GASKETS
LABEL ALL EXPOSED PIPING AND ALL PIPING IN MECHANICAL
ROOMS WITH MANUFACTURED PIPE LABELS PREPRINTED,
COLOR -CODED, WITH LETTERING INDICATING SERVICE, AND
SHOWING FLOW DIRECTION.
ALL PLUMBING MATERIALS INSTALLED IN RETURN AIR PLENUMS
SHALL BE INSTALLED OR COVERED WITH MATERIALS AS REQUIRED
TO PROVIDE FLAME RATING OF NOT MORE THAN 25 AND A SMOKE
DEVELOPED INDEX OF NOT MORE THAN 50. PRIOR TO ROUGH -IN
CONSULT WITH M.C. TO VERIFY ALL LOCATIONS OF RETURN AIR
PLENUMS.
9. PROVIDE BELLOWS TYPE WATER HAMMER ARRESTERS,
STAINLESS STEEL CASHING AND BELLOWS, 250 PSI, INSTALL
PER PDI STANDARD WH2O1.
10. ALL DOMESTIC WATER PIPING SHALL BE INSULATED WITH
FLEXIBLE UNICELLULAR PIPE INSULATION, ASTM C534, TYPE 1.
MINIMUM THICKNESS SHALL BE 1/2" FOR PIPE SIZES 1-1/4"
AND LESS AND SHALL BE 1" FOR 1-1/2" AND GREATER.
11. ALL EXPOSED STORM WATER PIPING SHALL BE INSULATED
WITH FLEXIBLE UNICELLULAR PIPE INSULATION, ASTM C534,
TYPE 1. THICKNESS TO BE MIN. 1/2"
12. INSTALL WATER HEATERS IN ACCORDANCE WITH NFPA-70,
AND THE NATIONAL ELECTRICAL CODE. PROVIDE BRASS
DRAIN VALVE, 3/4" RELIEF VALVE AND COLD WATER DIP TUBE,
INSTALL HEATERS PER MANUFACTURES INSTALLATION
INSTRUCTIONS. PROVIDE SHUT-OFF VALVES FOR SERVICE
WORK. THERMOSTATS OR MIXING VALVES SHALL BE
CAPABLE OF DELIVERING WATER AT 110 DEG F. OR LESS AT
FAUCETS.
13. FIXTURES DESIGNATED FOR HANDICAP ACCESSIBILITY SHALL
COMPLY WITH ANSI A 117.1, LATEST EDITION, INCLUDING
ADOPTED INDIANA AMENDMENTS.
14. DRAIN AND VENT PIPING WASTE AND VENT PIPING AND VENT
PIPING UNDERGROUND AND ABOVE GROUND SHALL BE PVC
SCHEDULE 40 WITH DWV FITTINGS. SANITARY MAINS SHALL
BE PITCHED AT 1/8" PER FOOT. BRANCHES SHALL BE PITCHED
1/4" PER FOOT TOWARD THE SANITARY SEWER MAIN. THEY
SHALL BE INSTALLED AND TESTED IN ACCORDANCE WITH
INDIANA 1999 PLUMBING CODE SECTION 712 REQUIREMENTS.
15. FURNISH AND INSTALL ACCESS PANELS FOR ALL CONCEALED
EQUIPMENT, PIPING VALVES, CLEANOUTS, ETC. ACCESS
PANELS SHALL BE OF SUFFICIENT SIZE TO PROVIDE
ADEQUATE WORKING CLEARANCE AND ACCESS.
16. ALL PIPING INSULATION MATERIALS SHALL HAVE A FLAME
SPREAD RATING OF 25 OR LESS (ON THE FLAME SPREAD
TEST SCALE) AND SMOKE DEVELOPMENT OF 50 OR LESS (ON
THE SMOKE TEST SCALE) OR AS DEFINED BY NFPA 255
STANDARD METHOD OF TESTING OF SURFACE BURNING
CHARACTERISTICS OF BUILDING MATERIALS, LOCAL CODES
AND LOCAL AUTHORITIES HAVING JURISDICTION. ALL PVC
PIPING LOCATED IN RETURN AIR PLENUM SPACES OR
EXPOSED SHALL BE INSULATED.
17. DIELECTRIC UNIONS SHALL BE USED TO CONNECT
DISSIMILAR METALS OR METAL PIPING SHALL HAVE METAL
CONNECTIONS ON EACH END THREADED TO MATCH THE
ADJACENT PIPING. METAL COMPONENTS SHALL BE
SEPARATED BY A NYLON INSULATOR TO PREVENT CURRENT
FLOW BETWEEN DISSIMILAR METALS. UNIONS SHALL BE
SUITABLE FOR THE SYSTEM OPERATING PRESSURES AND
TEMPERATURE WELD TYPE: ASTM A-234.
18. VERIFY LOCATION, DEPTH AND SIZE OF ALL SANITARY SEWER
LINES BASED ON SITE CONDITIONS. CONNECT AS REQUIRED.
OUTSIDE SEWER SHALL BE INSTALLED WITH MINIMUM OF T-0"
COVER. COORDINATE CONNECTIONS WITH SITE
CONTRACTOR AND LOCAL UTILITY.
19. ALL PIPING PENETRATIONS OF WALLS AND FLOORS SHALL BE
SLEEVED AND SEALED WATER TIGHT AND FIRE RATED
WHERE REQUIRED. ALL UNDERGROUND PENETRATIONS
SHALL BE DONE WITH MECHANICAL SEALS LIKE LINK SEAL OR
EQUAL.
20. PLUMBING CONTRACTOR SHALL INSTALL A COMPLETE
SYSTEM OF DRAIN, WASTE AND VENT PIPING, HOT AND COLD
WATER PIPING. ALL ESCUTCHEONS, TRAPS, TAIL PIECES
STOPS AND RISERS SHALL BE CHROME PLATED RED BRASS
MCQUIRE OR EQUAL. ALL STRAINERS SHALL BE CHROME
PLATED BRASS OR STAINLESS STEEL. ALL FIXTURES SHALL
BE LEVEL, SCRATCH AND NICK FREE, CAULKED WHERE
REQUIRED AND CONNECTED PROPERLY TO WATER, DRAIN
AND VENT SYSTEMS.