Loading...
HomeMy WebLinkAbout16D C B IA a � 2 � 3 4 275 CFM 275 CFM 1 1/4"CWS/R 2"HWS/R 275 CFM (FCU 3) FCU -3 275 CFM u 13 4 16 FCU -2 18 \1 LJ 1 1 /4"CWS/R n BUILD UNISTRUT FF SUPPORT PUMPS A SHOWN IN DETAIL 1 /2"CWS/R 'HWS/R I CROSSOVER BRIDGE REINFORCED ENCLOSURE, BY OTHERS (2) EXISTING 4" INCOMING ELECTRICAL CONDUIT (4) EXISTING INCOMING HSW/R & CWS/F 00 PIPES FROM ENERGY CENTER MECHANICAL PUMP PIPING SECTION. SCALE: 1/4" = 1'-0" 1 6 4"HWR 3"CWR Ild FCU -1 _1 2 HWS/R HWP-1 CWP8 X_" 7 14 1J HWP-2 1 1/4"CWS/R 9 0 100 CFM 1 1/2"HWS/R 2 CROSSOVER FD -1 BRIDGE 2 60 SG1 VFD-1 n\-2 3"CWS M-2 175 CFM 22 D� 100 VFD-3�� 4"HWS RG 1 60 VFD-4 RRG2 TCP 175 CFM 3 225 CFM Ell 200 CFM RG1 m S D 1 F271 21 145 200 CFM ® 150 CFM w ® EE D-14 RE- RG1 6� E -_V` RG2 22 D� 60 SG1 R " 1 2CWS 100 15 20 1 / / FCU -5 2"HWS/R 200 CFM `y 9 1 1 /4"CWS/R 1 1/2"HWS/R 150 CFM 1 1 /4"CWS/R x F_-1 1 1 /4"CWS/R 2"HWS/R �. FCU -6 FCU -4 1 1 /2"HWS/R SD2 ® 13 � 17 235 (FCU -6) 3 '11M-20 235 CFM SD2 235 N 75 CFM Its /'R G2 SG1 100 MECHANICAL SECOND FLOOR PLAN 1 x�E �,a _ �—o x 3 12/20 S/A--'- I I I I SUPPLY AIR PLENUM FCU -6 20/16 R/A RETURN AIR -Z PLENUM ROUTE CONDENSATE TO NEAREST DRAIN 12/12 L7 120 1 1/2"CWS/R 2"HWS/R SUPPLY AIR PLENUM FCU -5 12/20 S/A RETURN AIR PLENUM 12/16 zo/is w/n � MECHANICAL FAN COIL UNIT SECTION. SCALE: 1/4" = 1'-0" r.� y 1i 300 CFM 300 CFM 300 CFM Z(FCU -10) T 100 CFM 1 1 /4"CWS/R ® 1 1/2"HWS/R M 300 CFM 14 o FCU -8 ►ir�� 150 CFM FCU -10- 1 1 /4"CWS/R 2"HWS/R —1 1 /4"CWS/R 1 1 /2"HWS/R FCU -9 300 CFM 150 CFM 300 CFM (FCU -9) 150 CFM 0 100 FM 300 CFM 'RG -2\ [Z] E 300 CFM 300 CFM GENERAL SHEET DOTES A. REFER TO M-001 SHEET FOR MECHANICAL SYMBOLS AND ABBREVIATIONS. B. CONTRACTOR SHALL REMOVE, CLEAN, REPAINT AND REINSTALL EXISTING TO REMAIN DIFFUSERS, REGISTERS AND GRILLES. C. CONTRACTOR SHALL CLEAN INSIDE AREA FOR ALL EXISTING DUCTWORK TO REMAIN. D. BALANCE ALL EXISTING SUPPLY AIR DIFFUSERS TO CFM LISTED. E. PROVIDE FIRESTOP SEALANT AROUND DUCTWORK AND PIPING AT ALL PENETRATIONS THROUGH FLOOR. O SHEET KEYNOTES 1. PROVIDE NEW HOT WATER AND CHILLED WATER PIPING AS INDICATED. ROUTE TIGHT TO STRUCTURE. COORDINATE PIPE ROUTING WITH EXISTING OBSTRUCTIONS SUCH AS JOISTS, GARAGE DOOR RAILS, ETC. 2. INSTALL NEW HOT WATER AND CHILLED WATER PUMPS ADJACENT TO WALL. PROVIDE CLEARANCES AS RECOMMENDED BY PUMP MANUFACTURER. REFER TO DETAIL 5/101-501 FOR PIPE VALVES AND FITTINGS CONFIGURATION. 3• INSTALL NEW VFD'S AND TCP FOR PUMPS AND MOUNT TO MEZZANINE WALL. PROVIDE CLEARANCES AS RECOMMENDED BY MANUFACTURER. 4. CAP AND SEAL EXISTING GAS PIPING AIRTIGHT. 5. INSTALL 10/6 INTAKE AIR DUCTWORK UP AND DOWN IN CHASE. REFER TO SHEETS M-201 & M-203 FOR CONTINUATION. 6. INSTALL 4"HWS/R & 3"CWS/R PIPES DOWN TO FIRST FLOOR. REFER TO SHEET M-201 FOR CONTINUATION. 7. INSTALL 4"HWR & 3"CWR PIPES UP INTO ATTIC AREA. REFER TO SHEET M-203 FOR CONTINUATION. 8. INSTALL 4"HWS & 3"CWS PIPES UP INTO ATTIC AREA. REFER TO SHEET M-203 FOR CONTINUATION. 9• INSTALL 2 1 /2"HWS/R & 2"CWS/R PIPES UP INTO ATTIC AREA. REFER TO SHEET M-203 FOR CONTINUATION. 10. INSTALL 3"HWS/R & 2 1 /2"CWS/R PIPES UP INTO ATTIC AREA. REFER TO SHEET M-203 FOR CONTINUATION. 11. INSTALL 2"HWS/R & 1 1 /2"CWS/R PIPES DOWN TO FIRST FLOOR. REFER TO SHEET M-201 FOR CONTINUATION. 12. INSTALL 2"HWS/R & 1 1 /2"CWS/R PIPES UP TO SECOND FLOOR. REFER TO SHEET M-202 FOR CONTINUATION. 13• CONNECT FCU TO 20/12 SUPPLY AIR AND 20/16 RETURN AIR, ROUTE DUCTWORK UP TO ATTIC AREA. ROUTE CONDENSATE PIPE TO NEAREST FLOOR DRAIN. REFER TO SHEET M-203 FOR CONTINUATION. 14. CONNECT FCU TO 24/10 SUPPLY AIR AND 20/16 RETURN AIR, ROUTE DUCTWORK DOWN TO FIRST FLOOR. ROUTE CONDENSATE PIPE TO NEAREST FLOOR DRAIN. REFER TO C SHEET M-201 FOR CONTINUATION. 15. CONNECT FCU TO 20/12 SUPPLY AIR AND 20/16 RETURN AIR, ROUTE DUCTWORK DOWN TO FIRST FLOOR. ROUTE CONDENSATE PIPE TO NEAREST FLOOR DRAIN. REFER TO SHEET M-201 FOR CONTINUATION. 16. CONNECT FCU TO 20/12 SUPPLY AIR AND 20/16 RETURN AIR, ROUTE SUPPLY AIR DUCTWORK DOWN AND RETURN AIR UP AND DOWN. ROUTE CONDENSATE PIPE TO NEAREST FLOOR DRAIN. REFER TO SHEETS M-201 & M-203 FOR CONTINUATION. 17. CONNECT FCU TO 16/14 SUPPLY AIR AND 26/12 RETURN AIR, ROUTE SUPPLY AIR DUCTWORK DOWN AND RETURN AIR UP AND DOWN. ROUTE CONDENSATE PIPE TO NEAREST FLOOR DRAIN. REFER TO SHEETS M-201 & M-203 FOR CONTINUATION. 18. CONNECT FCU TO 6"0 INTAKE AIR, ROUTE DUCTWORK UP TO ATTIC AREA. REFER TO SHEET M-203 FOR CONTINUATION. 19. CONNECT FCU TO 10/6 INTAKE AIR, ROUTE DUCTWORK UP TO ATTIC AREA. REFER TO SHEET M-203 FOR CONTINUATION. 20. CONNECT FCU TO 8"0 INTAKE AIR, ROUTE DUCTWORK UP TO ATTIC AREA. REFER TO SHEET M-203 FOR CONTINUATION. 21. CAP AND SEAL EXISTING DUCTWORK AIRTIGHT. 22. REFER TO M203 FOR CONTINUATION. B ROOM NUMBERS # DESCRIPTION 143 STAIR 144 STAIR 145 STAIR 146 STAIR 201 OFFICE 203 MECH 204 MECH 205 CORRIDOR 206 LOCKERS 207 SHOWERS 208 MENS 209 SEATING 210 DORM DON' 4 212 ATTIC 213 ATTIC 214 WOMENS 215 SHOWER 216 MECH 217 LOUNGE 218 STORAGE 219 OFFICE 220 OFFICE 221 OFFICE 222 STORAGE 223 STORAGE 224 LOUNGE 225 OFFICE 226 OFFICE 227 OFFICE 228 CHIEFS OFFICE 229 STORAGE 230 RESTROOM 231 CORRIDOR 232 OFFICE ENGINEER I i i 1 UACQUIS CONSULTING ENGINEERS I 9229 DELEGATES ROW, SUITE 550 I INDIANAPOLIS, IN 46240 317.706.2075 ; WWW.LACQUIS.COM I CONSULTANT 61 8 East Market Street Indianapolis, Indiana 46202 ph 317/264.8162 f.317/264.8165 r i I I i i I ! �,�tnn»tinininr�n �� � ► �Sr y = NO. 10001108 r,,1 .NATE QF fi �.,/lrrbl t+NP `rte'; Ni`"� ' 1 V PROJECT CARMEL MASTER10 r.. ilt FIRE STATION Steven A. Couts Fire Headquarters, Station 41 2 Civic Square Carmel, In 46032 i I I MARK I DATE ISSUE DATE: 5 CLIENT NO: 00 PROJECT NO: ( CAD FILE: M-2 D RAW N BY: SB CHECKED BY:, Q Copyright, L'AcqL DESCRIPTION SHEET TITLE MECHANICAL SECOND FLOOR PLAN M-202