HomeMy WebLinkAbout16D
C
B
IA
a
� 2 � 3 4
275 CFM 275 CFM
1 1/4"CWS/R
2"HWS/R 275 CFM
(FCU 3)
FCU -3
275 CFM u 13
4 16
FCU -2
18
\1 LJ 1 1 /4"CWS/R
n
BUILD UNISTRUT FF
SUPPORT PUMPS A
SHOWN IN DETAIL
1 /2"CWS/R
'HWS/R
I
CROSSOVER
BRIDGE
REINFORCED ENCLOSURE, BY OTHERS
(2) EXISTING 4" INCOMING
ELECTRICAL CONDUIT
(4) EXISTING INCOMING HSW/R & CWS/F
00 PIPES FROM ENERGY CENTER
MECHANICAL PUMP PIPING SECTION.
SCALE: 1/4" = 1'-0"
1
6 4"HWR
3"CWR
Ild
FCU -1 _1 2 HWS/R HWP-1 CWP8 X_" 7
14 1J HWP-2
1 1/4"CWS/R 9 0
100 CFM 1 1/2"HWS/R 2 CROSSOVER
FD -1 BRIDGE 2
60 SG1 VFD-1 n\-2 3"CWS M-2
175 CFM 22 D� 100 VFD-3�� 4"HWS
RG 1 60 VFD-4
RRG2 TCP
175 CFM 3
225 CFM
Ell
200 CFM
RG1 m
S D 1 F271 21
145
200 CFM ® 150 CFM w
® EE
D-14
RE-
RG1 6� E -_V` RG2
22 D�
60 SG1
R "
1 2CWS 100
15 20 1 / /
FCU -5 2"HWS/R
200 CFM `y 9
1 1 /4"CWS/R
1 1/2"HWS/R 150 CFM
1 1 /4"CWS/R x F_-1 1 1 /4"CWS/R
2"HWS/R �. FCU -6 FCU -4 1 1 /2"HWS/R
SD2 ® 13 � 17
235 (FCU -6)
3
'11M-20
235 CFM
SD2
235
N
75 CFM
Its
/'R G2
SG1
100
MECHANICAL SECOND FLOOR PLAN
1 x�E �,a _ �—o x
3
12/20 S/A--'-
I
I
I
I
SUPPLY AIR
PLENUM
FCU -6
20/16 R/A
RETURN AIR -Z
PLENUM
ROUTE CONDENSATE
TO NEAREST DRAIN
12/12
L7
120
1 1/2"CWS/R
2"HWS/R
SUPPLY AIR
PLENUM
FCU -5
12/20 S/A
RETURN AIR
PLENUM
12/16
zo/is w/n �
MECHANICAL FAN COIL UNIT SECTION.
SCALE: 1/4" = 1'-0"
r.�
y 1i
300 CFM 300 CFM 300 CFM
Z(FCU -10)
T
100 CFM
1 1 /4"CWS/R
® 1 1/2"HWS/R M 300 CFM
14
o FCU -8
►ir��
150 CFM
FCU -10-
1 1 /4"CWS/R
2"HWS/R
—1 1 /4"CWS/R
1 1 /2"HWS/R
FCU -9
300 CFM
150 CFM
300 CFM
(FCU -9)
150 CFM
0
100 FM 300 CFM
'RG -2\ [Z] E
300 CFM
300 CFM
GENERAL SHEET DOTES
A. REFER TO M-001 SHEET FOR MECHANICAL SYMBOLS AND ABBREVIATIONS.
B. CONTRACTOR SHALL REMOVE, CLEAN, REPAINT AND REINSTALL EXISTING TO REMAIN
DIFFUSERS, REGISTERS AND GRILLES.
C. CONTRACTOR SHALL CLEAN INSIDE AREA FOR ALL EXISTING DUCTWORK TO REMAIN.
D. BALANCE ALL EXISTING SUPPLY AIR DIFFUSERS TO CFM LISTED.
E. PROVIDE FIRESTOP SEALANT AROUND DUCTWORK AND PIPING AT ALL PENETRATIONS
THROUGH FLOOR.
O SHEET KEYNOTES
1. PROVIDE NEW HOT WATER AND CHILLED WATER PIPING AS INDICATED. ROUTE TIGHT TO
STRUCTURE. COORDINATE PIPE ROUTING WITH EXISTING OBSTRUCTIONS SUCH AS JOISTS,
GARAGE DOOR RAILS, ETC.
2. INSTALL NEW HOT WATER AND CHILLED WATER PUMPS ADJACENT TO WALL. PROVIDE
CLEARANCES AS RECOMMENDED BY PUMP MANUFACTURER. REFER TO DETAIL 5/101-501
FOR PIPE VALVES AND FITTINGS CONFIGURATION.
3• INSTALL NEW VFD'S AND TCP FOR PUMPS AND MOUNT TO MEZZANINE WALL. PROVIDE
CLEARANCES AS RECOMMENDED BY MANUFACTURER.
4. CAP AND SEAL EXISTING GAS PIPING AIRTIGHT.
5. INSTALL 10/6 INTAKE AIR DUCTWORK UP AND DOWN IN CHASE. REFER TO SHEETS
M-201 & M-203 FOR CONTINUATION.
6. INSTALL 4"HWS/R & 3"CWS/R PIPES DOWN TO FIRST FLOOR. REFER TO SHEET M-201
FOR CONTINUATION.
7. INSTALL 4"HWR & 3"CWR PIPES UP INTO ATTIC AREA. REFER TO SHEET M-203 FOR
CONTINUATION.
8. INSTALL 4"HWS & 3"CWS PIPES UP INTO ATTIC AREA. REFER TO SHEET M-203 FOR
CONTINUATION.
9• INSTALL 2 1 /2"HWS/R & 2"CWS/R PIPES UP INTO ATTIC AREA. REFER TO SHEET
M-203 FOR CONTINUATION.
10. INSTALL 3"HWS/R & 2 1 /2"CWS/R PIPES UP INTO ATTIC AREA. REFER TO SHEET
M-203 FOR CONTINUATION.
11. INSTALL 2"HWS/R & 1 1 /2"CWS/R PIPES DOWN TO FIRST FLOOR. REFER TO SHEET
M-201 FOR CONTINUATION.
12. INSTALL 2"HWS/R & 1 1 /2"CWS/R PIPES UP TO SECOND FLOOR. REFER TO SHEET
M-202 FOR CONTINUATION.
13• CONNECT FCU TO 20/12 SUPPLY AIR AND 20/16 RETURN AIR, ROUTE DUCTWORK UP
TO ATTIC AREA. ROUTE CONDENSATE PIPE TO NEAREST FLOOR DRAIN. REFER TO
SHEET M-203 FOR CONTINUATION.
14. CONNECT FCU TO 24/10 SUPPLY AIR AND 20/16 RETURN AIR, ROUTE DUCTWORK DOWN
TO FIRST FLOOR. ROUTE CONDENSATE PIPE TO NEAREST FLOOR DRAIN. REFER TO C
SHEET M-201 FOR CONTINUATION.
15. CONNECT FCU TO 20/12 SUPPLY AIR AND 20/16 RETURN AIR, ROUTE DUCTWORK DOWN
TO FIRST FLOOR. ROUTE CONDENSATE PIPE TO NEAREST FLOOR DRAIN. REFER TO
SHEET M-201 FOR CONTINUATION.
16. CONNECT FCU TO 20/12 SUPPLY AIR AND 20/16 RETURN AIR, ROUTE SUPPLY AIR
DUCTWORK DOWN AND RETURN AIR UP AND DOWN. ROUTE CONDENSATE PIPE TO
NEAREST FLOOR DRAIN. REFER TO SHEETS M-201 & M-203 FOR CONTINUATION.
17. CONNECT FCU TO 16/14 SUPPLY AIR AND 26/12 RETURN AIR, ROUTE SUPPLY AIR
DUCTWORK DOWN AND RETURN AIR UP AND DOWN. ROUTE CONDENSATE PIPE TO
NEAREST FLOOR DRAIN. REFER TO SHEETS M-201 & M-203 FOR CONTINUATION.
18. CONNECT FCU TO 6"0 INTAKE AIR, ROUTE DUCTWORK UP TO ATTIC AREA. REFER TO
SHEET M-203 FOR CONTINUATION.
19. CONNECT FCU TO 10/6 INTAKE AIR, ROUTE DUCTWORK UP TO ATTIC AREA. REFER TO
SHEET M-203 FOR CONTINUATION.
20. CONNECT FCU TO 8"0 INTAKE AIR, ROUTE DUCTWORK UP TO ATTIC AREA. REFER TO
SHEET M-203 FOR CONTINUATION.
21. CAP AND SEAL EXISTING DUCTWORK AIRTIGHT.
22. REFER TO M203 FOR CONTINUATION.
B
ROOM NUMBERS
#
DESCRIPTION
143
STAIR
144
STAIR
145
STAIR
146
STAIR
201
OFFICE
203
MECH
204
MECH
205
CORRIDOR
206
LOCKERS
207
SHOWERS
208
MENS
209
SEATING
210
DORM
DON'
4
212
ATTIC
213
ATTIC
214
WOMENS
215
SHOWER
216
MECH
217
LOUNGE
218
STORAGE
219
OFFICE
220
OFFICE
221
OFFICE
222
STORAGE
223
STORAGE
224
LOUNGE
225
OFFICE
226
OFFICE
227
OFFICE
228
CHIEFS OFFICE
229
STORAGE
230
RESTROOM
231
CORRIDOR
232
OFFICE
ENGINEER
I
i
i
1
UACQUIS
CONSULTING ENGINEERS
I
9229 DELEGATES ROW, SUITE 550 I
INDIANAPOLIS, IN 46240
317.706.2075 ;
WWW.LACQUIS.COM I
CONSULTANT
61 8 East Market Street
Indianapolis, Indiana 46202
ph 317/264.8162 f.317/264.8165
r
i
I
I
i
i
I
!
�,�tnn»tinininr�n ��
� ► �Sr y =
NO.
10001108
r,,1
.NATE QF
fi �.,/lrrbl t+NP `rte';
Ni`"� ' 1
V
PROJECT
CARMEL MASTER10
r..
ilt
FIRE STATION
Steven A. Couts Fire Headquarters, Station 41
2 Civic Square
Carmel, In 46032
i
I
I
MARK I DATE
ISSUE DATE: 5
CLIENT NO: 00
PROJECT NO: (
CAD FILE: M-2
D RAW N BY: SB
CHECKED BY:,
Q Copyright, L'AcqL
DESCRIPTION
SHEET TITLE
MECHANICAL
SECOND FLOOR
PLAN
M-202