HomeMy WebLinkAbout13DD
DC
DB
DA1
I
I
-U13I I � II - - - --
I
ii I I
I 4 I-�-- -----
----
----------
-t1 n ----- �J
II II I 6 I I
J L- - I I I 6
r - - - - -------►h I I 2
I 15 II I I I I 2
10 \\ Ilj ---_J
I------------- - - - - - -
�--I I I I r--
4 Iii a 4 i I - -
----�
I I
16 L II I I I
----------------------
r I- - - - L I r-------------------------------------------------- 11I�1 Q__ I I --- -J I �� I1 1 1z =�Z_ J I - - - -� I I I I ' �r =____� �J
L_ ----
f �'r-: I I I I I I I I E_====_ ��
I I I I�
I I Ii t,jiI I I I
r
9 1 1 _---J I I
r l II I I I I
r------------�
I
L----�;----�---
III1111111I/IIII r
`OP G� -TER'
4
•'
L----�--
..
• Mw PN•
M
I
I
I
U
o
U�
IIII
I
�
�co
wT-
I
L---
---4L---
•1
I
r---
----
L----L----�----
>_
1 I DEMOLITION PLAN
A-1.1 1 1/4" = 1' 0"
GENERAL NOTES
10 I' 4 4 I \`\
-L I I I I I I I I I
11 I
-I r ---I _
J=� I
J L- -- r�
L� I I I I I I I iii
I �
J I I I I I I I iii
LJ1�
i'
- - I I I i IiI
J I I I �
III i i--------------------------------------------------� Ilii
'ii
4 I I I I�'
i
L-----
J I I
I � I
I� I� I � iijil
J I I I I I I i iii
L ----- ----------j
II
---J �II�I
I 1 I
J i l------� 2 6
1. THE DEMOLITION CONTRACTOR IS RESPONSIBLE FOR FAMILIARIZING HIMSELF WITH THE MALL
RULES & REGULATIONS BEFORE & DURING THE COURSE OF CONSTRUCTION. SHOULD A
CONFLICT ARISE BETWEEN THE CONTRACT DOCUMENTS & THE MALL RULES, THE CONTRACTOR
IS TO NOTIFY ARCHITECT AND AT IMMEDIATELY. MALL RULES & REGULATIONS SHALL GOVERN
EXCEPT WHERE THEY ARE IN CONFLICT W/ APPLICABLE CODES & ORDINANCES.
2. DEMOLITION CONTRACTOR TO COORDINATE ALL PHASES OF DEMOLITION FOR PROJECT AND
NOTIFY ARCHITECT AND AT OF ANY DISCREPANCIES OR CONFLICTING CONDITIONS WHICH
WOULD INTERFERE WITH THE SATISFACTORY COMPLETION OF THE WORK, PRIOR TO THE
START OF CONSTRUCTION.
3. DEMOLITION SHALL BE DONE IN NEAT WORKMANLIKE MANNER WITHIN THE LIMITS INDICATED IN
THE DRAWINGS AND IN ALL CASES TO THE EXTENT NEEDED TO PRODUCE THE INTENDED
WORK.
4. A) GENERAL CONTRACTOR (G.C.) IS RESPONSIBLE FOR DEMOLITION & REMOVAL OF ALL DEBRIS
AND DISCARDED MATERIALS AND/OR EQUIPMENT AS INDICATED WITHIN THE SPACE.
B) G.C. IS RESPONSIBLE FOR REMOVAL OF MATERIALS FROM BUILDING PREMISES ON A DAILY
BASIS. DO NOT MIX CONSTRUCTION DEBRIS WITH THAT OF BUILDING OCCUPANTS.
5. G.C. IS TO COORDINATE WITH MALL MANAGEMENT THE USE OF SERVICES, AND TO CONFORM
TO ALL BUILDING REGULATIONS WITH REGARD TO DEMOLITION.
6. A) ALL MAJOR DEMOLITION AND NOISE CREATING WORK SHALL BE COORDINATED WITH MALL
MANAGEMENT FOR ALLOWABLE HOURS OF OPERATION.
B) THE FOLLOWING WORK, IN WHICH LANDLORD IS TO BE NOTIFIED IN ADVANCE, MUST BE
DONE ON OVERTIME AND NOT DURING NORMAL BUSINESS HOURS:
- DEMOLITION WHICH PER MALL MANAGER'S JUDGMENT MAY CAUSE DISRUPTION TO OTHER
TENANTS.
WORK PERFORMED OUTSIDE OF TENANT'S PREMISES.
OTHER ACTIVITIES THAT, IN MALL MANAGER'S JUDGMENT, MAY DISTURB OTHER TENANTS.
7. G.C. TO COORDINATE WITH THE MALL MANAGEMENT, AT & ARCHITECT AS TO THE PROTECTION
AND/OR STORAGE OF ANY ITEMS TO BE SAVED FROM DEMOLITION.
8. G.C. TO CONFIRM WITH AT & ARCHITECT BEFORE START OF DEMOLITION WHICH ITEMS
INDICATED ON DRAWINGS ARE TO BE REMOVED FROM SITE FOR ITEMS DEEMED NOT REQUIRED
BY AT.
9. G.C. IS RESPONSIBLE TO PROTECT ALL EXISTING ITEMS TO REMAIN THROUGHOUT THE
COURSE OF DEMOLITION AND CONSTRUCTION.
10. G.C. MUST PROVIDE ALL REQUIRED PROTECTION TO ALL SURROUNDING AREAS THROUGHOUT
COURSE OF DEMOLITION AND CONSTRUCTION.
11. G.C. IS RESPONSIBLE TO REPAIR AND/OR REPLACE ANY DAMAGE IN THE SURROUNDING
AREAS CAUSED BY DEMOLITION AND CONSTRUCTION IN "AREA OF WORK.'
12. A) ALL UNUSED PLUMBING, SHEET METAL DUCTS, AND EQUIPMENT LINES MUST BE REMOVED
AND CAPPED AT THE MAIN RISER OR BRANCH CONNECTION.
B) ALL BUILDING SHUTDOWNS - ELECTRICAL, PLUMBING, HVAC EQUIPMENT, FIRE AND LIFE
SAFETY SYSTEM- MUST BE COORDINATED WITH MALL MANAGEMENT IN ADVANCE.
13. G.C. SHALL BE RESPONSIBLE FOR ANY LOSSES INCURRED IN THE EVENT THAT THE LOSS OF
ANY SERVICE PREVENTS THE CLIENT FROM CONDUCTING BUSINESS.
ELECTRICAUDATA/PHONE•
14. ANY REMOVAL OF SUCH ELECTRICAL EQUIPMENT SHALL BE DONE IN SUCH A WAY AS TO
ALLOW THE OPERATIONS OF ADJACENT TENANTS TO CONTINUE WITHOUT INTERRUPTION OF
ANY SERVICE DURING DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL TAKE ALL
NECESSARY PRECAUTIONS IN ORDER TO COMPLY WITH THIS ORDER.
15. THE CONTRACTOR SHALL PROBE ALL CABLES PRIOR TO REMOVAL TO INSURE THAT NO
OPERATIONS ARE INADVERTENTLY INTERRUPTED.
16. REMOVE ALL TELEPHONE EQUIPMENT AS REQUIRED FOR NEW WORK.
17. REMOVE ALL POWER/DATA & TELEPHONE OUTLETS IN PARTITIONS AND COLUMN ENCLOSURES
WHICH ARE DEEMED TO BE REMOVED, AS WELL AS IN CORE WALLS THROUGHOUT. REMOVE
ALL ABANDONED ELECTRICAL AND TELECOMMUNICATIONS CABLING & CONDUIT BACK TO THE
SOURCE.
FLOOR OUTLETS:
18. ALL POWER/DATA FLOOR OUTLETS ARE TO BE REMOVED & SHALL HAVE WIRE/CABLE
REMOVED BACK TO ORIGINAL SOURCE. COORDINATE W/ ENG. DRAWINGS. QUANTITIES &
CONDITIONS VIF.
19. REMOVE & CAP ALL ELECTRICAL AND DATA OUTLETS NOT BEING REUSED IN AREAS OF WORK.
COORDINATE W/ ELECTRICAL DRAWINGS.
9. G.C. IS RESPONSIBLE TO PROTECT ALL EXISTING ITEMS TO REMAIN THROUGHOUT THE
COURSE OF DEMOLITION AND CONSTRUCTION.
10. G.C. MUST PROVIDE ALL REQUIRED PROTECTION TO ALL SURROUNDING AREAS
THROUGHOUT COURSE OF DEMOLITION AND CONSTRUCTION.
11. G.C. IS RESPONSIBLE TO REPAIR AND/OR REPLACE ANY DAMAGE IN THE SURROUNDING
AREAS CAUSED BY DEMOLITION AND CONSTRUCTION IN "AREA OF WORK."
12. A) ALL UNUSED PLUMBING, SHEET METAL DUCTS, AND EQUIPMENT LINES MUST BE
REMOVED AND CAPPED AT THE MAIN RISER OR BRANCH CONNECTION.
B) ALL AC EQUIPMENT, FIRE AND
LIFE AFEITY SYSTEM- MUSTLDING NBE COORDIINATED WITH IMALL VMANAGEMENT N ADVANCE.
13. G.C. SHALL BE RESPONSIBLE FOR ANY LOSSES INCURRED IN THE EVENT THAT THE
LOSS OF ANY SERVICE PREVENTS THE CLIENT FROM CONDUCTING BUSINESS.
ELECTRICAL/DATA/PHON E
14. ANY REMOVAL OF SUCH ELECTRICAL EQUIPMENT SHALL BE DONE IN SUCH A WAY AS
TO ALLOW THE OPERATIONS OF ADJACENT TENANTS TO CONTINUE WITHOUT
INTERRUPTION OF ANY SERVICE DURING DEMOLITION AND CONSTRUCTION. THE
CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS IN ORDER TO COMPLY WITH
THIS ORDER.
15. THE CONTRACTOR SHALL PROBE ALL CABLES PRIOR TO REMOVAL TO INSURE THAT NO
OPERATIONS ARE INADVERTENTLY INTERRUPTED.
16. REMOVE ALL TELEPHONE EQUIPMENT AS REQUIRED FOR NEW WORK.
17. REMOVE ALL POWER/DATA & TELEPHONE OUTLETS IN PARTITIONS AND COLUMN
ENCLOSURES WHICH ARE DEEMED TO BE REMOVED, AS WELL AS IN CORE WALLS
THROUGHOUT. REMOVE ALL ABANDONED ELECTRICAL AND TELECOMMUNICATIONS
CABLING & CONDUIT BACK TO THE SOURCE.
FLOOR OUTLETS:
18. ALL POWER/DATA FLOOR OUTLETS ARE TO BE REMOVED & SHALL HAVE WIRE/CABLE
REMOVED BACK TO ORIGINAL SOURCE. COORDINATE W/ ENG. DRAWINGS. QUANTITIES
& CONDITIONS VIF.
19. REMOVE & CAP ALL ELECTRICAL AND DATA OUTLETS NOT BEING REUSED IN AREAS OF
WORK. COORDINATE W/ ELECTRICAL DRAWINGS.
TYP.
TELECOM/DATA:
20. REMOVE ALL TELEPHONE AND DATA CABLING FROM DEVICE BACK TO THE RACKS OF THE EXISTING
COMMUNICATIONS CLOSET. COORDINATE WITH TELECOMMUNICATIONS VENDOR AND CLIENT. G.C.
SHALL HAVE AN ELECTRICIAN ON PREMISES DURING DEMOLITION AFFECTING ELECTRICAL LINES IN
AREA OF WORK AND ADJACENT SPACES.
DUCTWORK:
REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
PARTITIONS:
21. A) REMOVE ALL PARTITIONS IN THEIR ENTIRETY, WHERE INDICATED, INCLUDING GYPSUM WALL BOARD
AND PLASTER PARTITIONS.
B) REMOVE ALL ASSOCIATED STUDS, TRACKS, FINISHES, ETC. AT PARTITIONS TO BE REMOVED.
C) REMOVE ALL CORNER GUARDS.
PIPING REMOVAL:
22. ELECTRICAL CONDUITS AND PIPING STACKS IN EXISTING WALLS WHICH ARE DEEMED TO BE REMOVED,
SHALL BE DEMOLISHED, UNLESS THEY RUN FROM FLOOR SLAB TO FLOOR SLAB. COORDINATE WITH
ARCHITECT AND ENGINEER AS REQUIRED.
23. A) REMOVE ALL DOORS, FRAMES AND RELATED HARDWARE, WHERE INDICATED.
B) COORDINATE WITH ARCHITECT FOR DOORS, FRAMES AND HARDWARE TO BE SALVAGED.
24. DEMOLITION CONTRACTOR SHALL NOT REMOVE BUILDING CORE DOORS INCLUDING FIRE EXIT DOORS
AND ELEVATOR DOORS, UNLESS OTHERWISE NOTED.
CEILINGS:
25. A) REMOVE ALL CEILINGS IN THEIR ENTIRETY IN "AREA OF WORK" INCLUDING HUNG CEILING SYSTEM,
DUTCHMAN, PLASTER AND GYPSUM WALL BOARD.
B) REMOVE ALL ASSOCIATED, GRID, TILES, CLIPS, HANGERS ETC BACK TO SLAB ABOVE
LIGHT FIXTURES:
26. REMOVE ALL EXISTING LIGHT FIXTURES, RECESSED AND SURFACE MOUNTED, ALL EXIT LIGHTS AND
SWITCHES IN "AREA OF WORK", U.O.N. ELECTRICAL FEEDS / HOMERUNS TO REMAIN FOR RECIRCUITING.
REFER TO ELECTRICAL DRAWINGS FOR EXISTING LIGHT FIXTURE THAT WILL BE REUSED.
MILLWORK -
27. G.C. TO REMOVE ALL EXISTING MILLWORK SCHEDULED FOR DEMOLITION.
FINISHES:
28. WALLS: ON WALLS TO REMAIN, G.C. TO CAREFULLY REMOVE ALL EXISTING WALL FINISHES (WALL
COVERING, PANELING, ETC.) AND PREPARE WALL SURFACE TO RECEIVE NEW WALL FINISHES.
L KEY NOTES
1❑ EXISTING STOREFRONT AND ENTRY DOORS TO BE REMOVED
aEXISTING COLUMN ENCLOSURE TO BE REMOVED
aREMOVE EXISTING FLOOR FINISH & SUBFLOOR
❑4 REMOVE EXISTING WALLS
EXISTING MALL STRUCTURAL COLUMN TO REMAIN.
REMOVE EXISTING MILLWORK
aEXISTING MALL NEUTRAL PIER TO REMAIN
REMOVE EXISTING TOILET ROOM AND PLUMBING FIXTURES. REMOVE
EXISTING FLOORING AND BASE.
�9 REMOVE EXISTING MOP SINK AND WATER HEATER ON SHELF ABOVE.
10 REFER TO ELECTRICAL SHEETS REGARDING EXISTING ELECTRICAL
DISTRIBUTION EQUIPMENT AND COMMUNICATION EQUIPMENT.
11 REFER TO MECHANICAL SHEETS REGARDING EXISTING HVAC EQUIPMENT
AND DUCTWORK.
12 EXISTING CEILING SOFFITS AND LIGHTING TO BE REMOVED.
REFER TO ELECTRICAL SHEETS FOR ADDITIONAL INFORMATION.
13 EXISTING DOOR TO REMAIN.
14 REFER TO SHEET A-1.2 FOR BARRICADE INFORMATION
15 REMOVE EXISTING DOOR AND DOOR FRAME.
16 REMOVE EXISTING PIPE, COORDINATE WITH PLUMBING SHEETS.
17 REMOVE EXISTING STOCK SHELVING ON TRACKS. PATCH AND REPAIR
EXISTING FLOOR TO RECEIVE NEW FLOORING.
LEGEND
D7
0 1' 3' 5'
N
EXISTING WALL TO REMAIN
WALL OR DOOR TO BE REMOVED
CELING TO BE REMOVED
MILLWORK OR FLOORING TO BE REMOVED
❑X NOTE TAG, REFER TO KEYED NOTES
III
III1111111I/IIII r
`OP G� -TER'
4
•'
gTPSEO -
..
• Mw PN•
0
Z Z U
O
U) H o
J ,J
J J co
a U
V V 3
3
U
Z �
q- M
C7 CV g
Z �•,� i O
O CD X U
ti
(-) > O
l o
U) C/) Z Lu
O Q p: uJ
uJJUc4Lu
L
w14-
�(DP�
project no.
210780.03
drawn check by
MC gp
FULL SCALE (24X36):
1/8" = V-0"
HALF-SIZE (12X18):
1/16"= V-0"
(unless otherwise noted)
sheet
Aml
■
DEMOLITION
PLAN
®
M
W
U
o
U�
�
�co
wT-
Z
W
>_
I-
Qo_z
JJ
<_Umw
U
M
zr
Q
U
project no.
210780.03
drawn check by
MC gp
FULL SCALE (24X36):
1/8" = V-0"
HALF-SIZE (12X18):
1/16"= V-0"
(unless otherwise noted)
sheet
Aml
■
DEMOLITION
PLAN