HomeMy WebLinkAbout26project no.
210780.03
drawn check by
MC BP
E
Z
0
Z
®
0 p
c
N
0
_
Cl)
J J
=
DOOR AS SCHEDULED
to
a
U
FLOOR AS SCHEDULED
I I
I JAMB I
I I
FLOOR AS SCHEDULED
3
U
I I
REF. 1/A-2.2
O Cfl
Q' CD
W
0 CV M
Z M u') OU
O cs, a
U�r--
X
0
W
DOOR, AS SCHEDULED
Q
O Q O rn
Q
m
00
I I
WJ �CV W
LENGTH
Or- O
r- W J
w�011 �
I I
Q
V
J
w
I I
I I
LINES OF DOOR JAMB,
I I
�
I I
U
BEYOND
I I
I I BLACK RUBBER
RECESSED "COCA" MAT
I
VCT FLOORING,
PER SCHEDULE
I I REDUCER STRIP
I I
I I
I I
INSTALL PER MANUFACTURES
RECOMMENDATIONS
JOINT FILLER
JOINT FILLER
DOOR AS SCHEDULED
TILE FLOORING, AS
SCHEDULED
I I
I I
I I
I I
I I
COORDINATE
I I
ROPPE #33 FULL RUBBER
SEALED CONC. FLOOR
I I
yyppp
THRESHOLD WITH
I I
THRESHOLD
I
FLOORING
DOOR MANUFACTURER
(E) CONCRETE SLAB
_
I -<
F
I I
ALIGN
d
.qQ d
d °'d d' D ! ..d
® d ..d q tl
Yj ° .'d
I
d ..
9
d®d
.a 6 .
qq
.
qd
. qd
da IA
5,1/2
da
, a
dd
ea
A 4
a
A
d..
dd
d
d
o
`
d'
_ad _L
..
d
CONTINUOUS
1'
a 6 a .. a
q
° d' d
EXTRUDED "L"
OF DOOR
ALUMINUM FRAME
6
FLOOR TRANSITION - VCT TO CONCRETE
55
FLUSH TRANSITION - WOOD TO MAT
4
RUBBER THRESHOLD @ TOILET ROOM
A-8.1
3" = 1' 0"
A-8.1
3" = 1' 0"
A-8.1
3" = 1' 0"
CARPET WOOD STRIP FLOORING
I I
I
DOOR AS
I I
SCHEDULED
I I
ALIGN FLOOR L____J
1' 4" AFF
IFFT
FINISHES WITH FACE
B.O. DOOR
I I
OF DOOR FRAME DOOR FRAME
EXISTING EXTERIOR MALL FLOOR NEW ANN TAYLOR STORE FLOOR
FLOOR AS SCHEDULED
I JAMB I
FLOOR AS SCHEDULED
(BEYOND)
I I
I
TILE TO POINT OF CLOSURE INSTALL
L_ DOOR, AS SCHEDULED
DOOR AS SCHEDULED
PER MANUFACTUERS INSTRUCTIONS
I I
I I
LINES OF DOOR JAMB,
I I
VERIFY W/ MALL
I I RECESSED "COCA" MAT
BEYOND
1/8" THICK FLUSH METAL
I I INSTALL PER MANUFACTURES
CARPET & PADDING, AS
TRIM, AS SCHEDULED
I I RECOMMENDATIONS
I
SCHEDULED
I I
WOOD STRIP FLOORING,
I I
I I
THRESHOLD, AS SCHEDULED
PLYWOOD SUBSTRATE
WOOD STRIP FLOORING ON
1/8" THICK FLUSH METAL
TRIM, AS SCHEDULED
I I COORDINATE
I I
AS SCHEDULED
I I
I I
SETTING BED
ON MANUFACTURER
MANUFACTURER
I I THRESHOLD WITH
I I
ALUMINUM TRANSITION
RECOMMENDED
RECOMMENDED ADHESIVE
EXTERIOR MALL SURFACE
I I DOOR MANUFACTURER
I I
WOOD FLOORING ADHESIVE
FILL AS REQUIRED
ADHESIVE
I I
PER MANUFACTURER
I I
REQUIREMENTS
I I
ALIGN
ALIGN
I I
I I
TOP OF SLAB
L ____ J
TOP OF SLAB ALIGN
L___J
IIIAn 111 11 1111111 1/1111
Jill
III
—
—ad
—A — — --
—
A
a
d d d a d
.d '.
d
'C1
' a.A d ". d d God
d ®
sl
d
d d /R
B d
4
da,
q
d
.q .d
ad
d aA A
°
A tl
d
d a d a
a
a
dd q d a d
q
a ad ®
a d
ad' q ".
q A ti d..' �.
d
d
4.
dd d v
a e d 4 a
d.
° a
da.'
q
d d
a d
., -n.. - ..
-d �.
I' _
d .A a
- -q
d
3
FLUSH TRANSITION - WOOD TO CARPET
2
FLUSH STONE TRANSITION @ ENTRY
ALUMINUM THRESHOLD @ BOH
A-8.1
3" = 1' 0"
A-8.1
3" = 1' 0"
A-8.1
3" = 1' 0"
project no.
210780.03
drawn check by
MC BP
E
Z
0
Z
®
0 p
c
N
0
_
Cl)
J J
=
J J
to
a
U
o
W
3
U
Z v
M
O Cfl
Q' CD
W
0 CV M
Z M u') OU
O cs, a
U�r--
X
0
W
CJS u:) Z O W
Q
O Q O rn
Q
m
00
Z
WJ �CV W
Or- O
r- W J
w�011 �
Q
V
project no.
210780.03
drawn check by
MC BP
®
04
M
W
O
U
o
W
N
W
LU
Z
W
Q
Q
>
Z
J
Q
V
J
w
M
�
U
project no.
210780.03
drawn check by
MC BP
FULL SCALE (24X36):
1/8"= 1'-0"
HALF-SIZE (12X18):
1/16"= 1'-0"
(unless otherwise noted)
sheet
A=8m
1
DOOR & TRANSITION
DETAILS
O
N
A
FULL SCALE (24X36):
1/8"= 1'-0"
HALF-SIZE (12X18):
1/16"= 1'-0"
(unless otherwise noted)
sheet
A=8m
1
DOOR & TRANSITION
DETAILS