Loading...
HomeMy WebLinkAbout4GENERAL NOTES 1. 4. NOT USED 5. COMMUNICATION AND DATA CABLE (TEFLON) TO BE FURNISHED AND INSTALLED BY TENANT'S TELEPHONE SUBCONTRACTOR EXCEPT AS INDICATED ON EQUIPMENT SCHEDULE OR ENGINEERING DRAWINGS. 6. SECURITY SYSTEM CONTRACTOR TO COORDINATE WITH OWNER'S SECURITY CONTRACTOR. SECURITY SYSTEMS INCLUDE THE FOLLOWING ITEMS; MOTION DETECTORS, KEYPADS, CAMERAS, HOLDUP BUTTONS. CONTRACTOR TO PROVIDE POWER ONLY AS INDICATED ON DRAWINGS. SECURITY CONTRACTOR TO INSTALL ALL LOW TENSION WIRING TO ABOVE UNITS. 7. BACK BOARD CONTRACTOR TO SUPPLY AND INSTALL A FIRE -RATED PLYWOOD BACKBOARD IN LOCATIONS AS REQUIRED BY ELECTRICAL ENGINEER'S DRAWINGS. BACKBOARD SHALL BE PAINTED BLACK LEAVING ONE RATING LABEL EXPOSED IN A SUITABLE LOCATION. DOORBELL SYSTEMS DAY CHIMES AND NIGHT BELLS AND ASSOCIATED ON/OFF SWITCHES SHALL BE PROVIDED AND INSTALLED BY ELECTRICAL SUB -CONTRACTOR. AND TELEPHONE NOTES FOR LIGHTING AND SWITCHING REQUIREMENTS, SEE REFLECTED CEILING PLAN, NOTES AND SYMBOLS ON DRAWING. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF ALL LOCAL LAWS, CODES AND REGULATIONS OF ALL AUTHORITIES HAVING JURISDICTION. IN 34. CONTRACTOR SHALL PROVIDE WOOD BLOCKING, BRACING AND NAILERS AS 11. FACE PLATES ® CASE OF CONFLICT BETWEEN REQUIREMENTS, THE MOST RESTRICTIVE SHALL REQUIRED FOR MILLWORK, EQUIPMENT, SHELVING, ETC. COORDINATE WITH TENANT. CONTRACTOR TO ENSURE ANY WOOD BLOCKING, SHEATHING, ETC. M A. FACE PLATES FOR WALL SIGNAL OUTLETS TO BE ONE HOLE TYPE U.O.N. APPLY. CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL OTHER IS FRT (FIRE RETARDENT TREATED). DURING STORE OPEN HOURS. TENANTS GENERAL CONTRACTOR MUST HIRE THE LANDLORD'S ROOFING CONTRACTOR FOR ALL ROOF REPAIR AND 2. BIDDING CONTRACTORS SHALL VISIT THE JOBSITE AND VERIFY ALL FIELD CONDITIONS AS NECESSARY TO COMPLETE THE WORK AND COMPARE TO 35. GENERAL CONTRACTOR TO PROVIDE 5% ADDITIONAL STOCK OF FINISH o FINISHING OF PENETRATIONS AND EQUIPMENT CURBS. PROVIDE AIR APPLICABLE CONSTRUCTION DOCUMENTS. REPORT DISCREPANCIES C. FACE PLATES FOR COMBINATION SIGNAL/TELEPHONE WALL OUTLETS TO HAVE TWO MODULAR PHONE JACKS U.O.N. FACE PLATES TO BE MATERIALS OR AS AGREED TO BY THE CONSTRUCTION MANAGER. COMPLETED WITHOUT CONFLICT OR DELAY. BETWEEN FIELD CONDITIONS AND CONSTRUCTION DOCUMENTS TO OWNER'S REPRESENTATIVE PRIOR TO SUBMITTING BID. FAILURE TO REPORT 36. ALL SURFACES WHICH ARE INDICATED TO BE FINISHED OR PAINTED SHALL BE 26. CONTRACTOR SHALL COORDINATE THE REQUIREMENTS OF ANY AND ALL DISCREPANCIES DOES NOT RELIEVE CONTRACTOR OF THE RESPONSIBILITY IN ADDITION TO COMPLYING WITH ALL CODE AND GOVERNMENT AGENCIES HAVING JURISDICTION, ALL WORK PERFORMED SHALL FULLY COMPLY WITH PREPARED, SANDED, TREATED, AND PRIMED IN STRICT ACCORDANCE WITH COMMERCIAL QUALITY STANDARDS, AND IN STRICT ACCORDANCE WITH FINISH ALL ELECT. CONDUIT AND PLUMBING PIPING IN CEILING OF FLOOR BELOW TO PROVIDE FINISHED PRODUCT TO THE INTENT OF THE CONSTRUCTION >" MATERIAL MANUFACTURER'S INSTRUCTIONS. 0 WILL BE INSTALLED AS TIGHT TO SLAB AS POSSIBLE. DOCUMENTS AND SHALL NOT RESULT IN ADDITIONAL TIME OR COMPENSATION MILLWORK (CABINET) SKETCHES/DETAILS. ANY CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER AND ARCHITECT PRIOR TO CRITERIA MANUAL. 13. OR REVISE THE ESTABLISHED CONTRACT AMOUNTS. 37. ALL FINISH SURFACES PENETRATED SUCH AS CEILING TILES AND MILLWORK 3. THE CONTRACTOR SHALL ADHERE TO THE CONSTRUCTION DOCUMENTS. SPECIFICATIONS (WHEN APPLICABLE). COUNTERS FOR ANY REASON MUST HAVE AN ASSOCIATED GROMMET APPROVED FOR THAT USE, UNLESS OTHERWISE NOTED. NOT USED. SHOULD ANY ERROR OR INCONSISTENCY APPEAR REGARDING THE MEANING M Q OR INTENT OF THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR SHALL IMMEDIATELY REPORT SAME TO THE ARCHITECT WHO WILL MAKE ANY 38. PROVIDE OCCUPANCY SIGN IN A CONSPICUOUS LOCATION IN ACCORDANCE CONTRACTOR TO PROVIDE ALL NECESSARY CORE DRILLS TO LOCATE 28. NECESSARY CLARIFICATION, OR REVISIONS AS REQUIRED. EQUIPMENT WITH STATE AND LOCAL CODES, DESIGN TO BE APPROVED BY ARCHITECT.. 4. NOT USED. 39 APPLICATION OF MATERIAL OR EQUIPMENT INSTALLED BY OTHERS 8. A CONSTITUTES ACCEPTANCE OF THAT WORK, AND ASSUMPTION OF THE. 1. 5. CONTRACTOR AND HIS SUBCONTRACTORS AND AGENTS SHALL HOLD ALL ALL ELECTRICAL WORK TO BE FILED BY THE LICENSED ELECTRICAL CONTRACTOR @ THE B.E.C. RESPONSIBILITY FOR SATISFACTORY INSTALLATION AND PERFORMANCE. PROVIDE AND INSTALL ALL NECESSARY IN -WALL FRAMING REQUIRED TO CARRY SHELF, HANGING, AND VALANCE LOADS, RAILINGS, ETC. AS PER APPLICABLE AND REQUIRED LICENSES FOR THE JURISDICTION WHERE THE WORK WILL BE PERFORMED. 40. CONTRACTOR SHALL PROVIDE ALL NECESSARY BRACING TO STRUCTURE FOR POWER BEING PROVIDED INSTEAD OF THE MODEL LISTED CONTRACTOR SHALL NOTIFY INTERIOR PARTITIONS, SOFFITS, CEILINGS, PLATFORMS, ETC. WHETHER 1 6. CONTRACTOR AND HIS AGENTS SHALL ACQUAINT THEMSELVES WITH ALL THE ARCHITECT AND PROVIDE THE ARCHITECT WITH CATALOG SHOWN ON THE DRAWINGS OR NOT. ELEVATIONS/DATUMS 30. LANDLORD/DEVELOPER REQUIREMENTS AND SHALL COMPLY FULLY WITH SUCH. 41. EXISTING UTILITIES ARE SHOWN GENERICALLY AND HAVE NOT BEEN 2. COUNTERTOPS, EQUIPMENT, BOOTHS, WALLS, ETC.; COLOR TO BE APPROVED BY OWNER. SPECIFICALLY VERIFIED BY THE OWNER OR THE OWNER'S REPRESENTATIVE. TENANT SHALL FURNISH AND INSTALL ALL EQUIPMENT INDICATED AS 'NIC' IN 7. TO ENSURE COORDINATION BETWEEN DISCIPLINES, CONTRACTOR SHALL 31. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY CONSTRUCTION DOCUMENTS. CONTRACTOR SHALL PROVIDE POWER, RECEPTACLES, CONNECTIONS, OR OTHER LABOR OR MATERIAL AS SPECIFIED SUPPLY EACH SUBCONTRACTOR OR AGENT WITH A FULL SET OF B. GWB CEILING HEIGHTS TO BE AS INDICATED ON REFLECTED CEILING PLANS AND ELEVATIONS. RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT OCCUR BY THE SEALED IN ACCORDANCE WITH THE BUILDING CODE AND ENERGY CODE. CONSTRUCTION DOCUMENTS FOR THEIR USE. CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL 32. 8. MAINTAIN SAFE EXITING AND APPROPRIATE FIRE PREVENTION PROCEDURES ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE UTILITIES. LOCATIONS/DIMENSIONS AT ALL TIMES DURING THE CONSTRUCTION PROCESS. 42. NOT USED. 9. ALL WORK LISTED, SHOWN OR IMPLIED IN THE CONSTRUCTION DOCUMENTS SHALL BE SUPPLIED AND INSTALLED BY THE CONTRACTOR EXCEPT WHERE 43. ALL WORK SHALL BE DONE TO THE HIGHEST STANDARDS OF TRADE PRACTICE. FOR EQUIPMENT [FURNISHED EITHER BY HIM OR OWNER] INCLUDING EXACT AND TYPES OF ELECTRICAL OR PLUMBING CONNECTIONS, SIZES OF OTHERWISE NOTED. THE CONTRACTOR SHALL CLOSELY COORDINATE HIS WORK WITH THAT OF OTHER CONTRACTORS AND VENDORS TO ASSURE THAT 44. THE CONTRACTOR SHALL REMEDY, WITHOUT COST TO THE OWNER, ANY EQUIPMENT, ETC. ALL SCHEDULES ARE MET AND THAT ALL WORK IS DONE IN CONFORMANCE COVER PLATE. DEFECTS DUE TO FAULTY WORKMANSHIP. WITH THE MANUFACTURER'S REQUIREMENTS. 45. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING DIGITAL PHOTOGRAPHS 10. CONTRACTOR SHALL PROTECT THE EXISTING CONSTRUCTION AND REPAIR OF THE CONSTRUCTION SITE, IN AN ADEQUATE NUMBER TO SHOW THE EXTENT OF WORK ACCOMPLISHED, EVERY MONDAY TO OWNER AND ARCHITECT. ANY DAMAGE OCCURRING AS A RESULT OF THEIR OPERATIONS AT NO COST TO THE TENANT OR LANDLORD. CONTRACTOR SHALL ALSO ENSURE THAT THEIR OPERATIONS DO NOT INTERFERE WITH THE OPERATION OF THE 46. ENGINEERING FOR THE PROJECT RELATING TO FIRE PROTECTION SYSTEMS REMAINDER OF THE DEVELOPMENT/MALL. BARRIERS TO NOISE, DUST AND DESIGNS ARE BY OTHER PARTIES UNDER SEPARATE CONTRACTS WITH THE OWNER OR GENERAL CONTRACTOR. SECURITY BETWEEN CONSTRUCTION AREAS AND PUBLIC AREAS SHALL BE ERECTED, MAINTAINED AND REMOVED PER THE DEVELOPMENT CRITERIA BY THE CONTRACTOR. 47. THESE DRAWINGS ARE PREPARED FOR THE PURPOSES OF CONSTRUCTION ONLY. THESE DRAWINGS ARE NOT TO BE USED FOR MAINTENANCE PURPOSES 11. CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION OF WORK, MATERIALS, AS ACTUAL CONDITIONS MAY VARY FROM THOSE SHOWN ON THESE DRAWINGS DUE TO CHANGE ORDERS, ALTERATIONS BY OTHERS, FIELD FIXTURES, ETC. FROM LOSS, DAMAGE, FIRE, THEFT, ETC. CONDITIONS, ETC. 12. NO CLAIMS FOR ADDITIONAL COMPENSATION AND/OR TIME SHALL BE MADE 48. NOT USED. OR CONSIDERED VALID UNLESS WRITTEN NOTIFICATION IS RECEIVED BY THE OWNER'S REPRESENTATIVE AND THE ADDITIONAL COMPENSATION AND/OR 49. NOT USED. TIME IS APPROVED IN ADVANCE OF PROCEEDING WITH THE WORK. 13. CONTRACTOR SHALL VERIFY AND PROVIDE ALL UTILITY CONNECTIONS 50. USE FIRE RATED (IF REQUIRED BY CODE) SEALANT AROUND ALL PIPES, DUCTS, CONDUIT, OUTLETS, SWITCHES, ETC. ON BOTH SIDES OF CROSSING / 5. (PLUMBING, ELECTRICAL, GAS, ETC. IN THE FORM OF SUPPLY AND DRAIN PIPES, CONDUIT AND PULLING WIRES, ETC.) RELATED TO EQUIPMENT AND PENETRATING WALL WITH THERMAL INSULATION. APPLIANCES. 51. EACH CONTRACTOR SHALL LEAVE THE SITE IN A NEAT, CLEAN, AND ORDERLY 6. 14. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING, PATCHING AND CONDITION UPON THE CONCLUSION OF THEIR WORK ON A DAILY BASIS. ALL WASTE, RUBBISH, AND EXCESS MATERIALS SHALL BE REMOVED FROM THE FITTING NECESSARY TO ACHIEVE THE INTENT OF THE CONSTRUCTION DOCUMENTS. SITE PROMPTLY AND IN AN APPROPRIATE MANNER. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF 15. NEW WORK AT EXISTING CONDITIONS SHALL ALIGN WITH AND MATCH ALL TRASH. EXISTING WORK EXCEPT WHERE OTHERWISE DIMENSIONED OR DETAILED. 52. SAFETY: ALL CONDUIT WORK, EQUIPMENT AND MATERIALS SHALL BE IN FULL 7 16. CONTRACTOR SHALL NEVER SCALE DRAWINGS. LOCATIONS FOR ALL ACCORDANCE WITH THE LATEST SAFETY RULES AND REGULATIONS OF ALL AUTHORITIES AND AGENCIES HAVING JURISDICTION. PARTITIONS, WALLS, CEILINGS, ETC. WILL BE DETERMINED BY DIMENSIONS ON THE DRAWINGS. ANY AREA OF THE PLANS MISSING REQUIRED DIMENSIONS MUST BE REPORTED TO THE ARCHITECT IMMEDIATELY. 53. CONSULT UTILITY PLAN AND STRUCTURAL DRAWINGS BEFORE SAW CUTTING 8. CONCRETE SLAB OR CORE DRILLING CONCRETE SLAB. COORDINATE ALL SLAB 17. DIMENSIONS ARE TO FACE OF FINISHED MATERIAL UNLESS NOTED WORK WITH MALL MANAGEMENT BEFORE COMMENCING. OTHERWISE. 54. SIGN CONTRACTOR SHALL OBTAIN ALL SIGN APPROVAL AND PERMITS FROM 18. CONTRACTOR SHALL COORDINATE THE DELIVERY AND STORAGE OF LOCAL BUILDING DEPARTMENT AS APPLICABLE. EQUIPMENT WITH EQUIPMENT SUPPLIER AND TAKE MEASURES TO ENSURE THE PROTECTION OF EQUIPMENT FROM DAMAGE DURING THE CONSTRUCTION 55. IT SHALL BE THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO PHASE PRIOR TO AND AFTER EQUIPMENT INSTALLATION. FULLY EXAMINE THE TENANT SPACE, ALL EXISTING STRUCTURES AND ALL OTHER EXISTING STRUCTURE ON THE PROJECT SITE BEFORE COMMENCING 19. CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES IN THE FIELD AND THE WORK. GENERAL CONTRACTOR SHALL VERIFY ALL DIMENSIONS (VERTICAL, HORIZONTAL AND OTHERWISE), AS WELL AS TO VERIFY THE PROVIDE ADDITIONAL UTILITY SERVICE AS REQUIRED TO MEET THE SCOPE AND INTENT OF THE WORK. CONDITION AND NATURE OF THE TENANT CONSTRUCTION, MATERIALS, AND AVAILABLE UTILITIES AND STRUCTURAL ELEMENTS AND TO NOTIFY THE 20. VERIFY LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION OWNER'S REPRESENTATIVE, IN WRITING, OF ANY AND ALL DISCREPANCIES BETWEEN THE SAID EXISTING CONDITIONS AND THESE DRAWINGS. FURTHER, START. ANY AND ALL LOSSES OF BUSINESS TO THE LANDLORD, DEVELOPER OR OTHER PARTY RESULTING FROM DAMAGE CAUSED BY CONTRACTOR IT SHALL BE THE JOINT RESPONSIBILITY OF THE GENERAL CONTRACTOR AND OPERATIONS SHALL BE THE RESPONSIBILITY OF CONTRACTOR. ANY UTILITIES ALL SUBCONTRACTORS AND SUPPLIERS OF MATERIALS TO SECURE ALL NECESSARY ADAPTATIONS TO SAME AS REQUIRED FOR THEIR RESPECTIVE DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED/REPLACED IMMEDIATELY AT THE SOLE EXPENSE OF THE CONTRACTOR. WORK PRIOR TO ORDERING, FABRICATION OR INSTALLATION OF ANY MATERIALS, EQUIPMENT OR COMPONENTS WHICH ARE TO BE INTEGRATED 21. CONTRACTOR SHALL PROVIDE DRAFT/FIRE STOPS, AS REQUIRED BY INTO THE WORK OF THIS PROJECT. NO CLAIMS FOR ADDITIONAL COMPENSATION SHALL BE MADE OR SHALL BE VALID UNLESS WRITTEN GOVERNING CODES AND JURISDICTIONS. NEW AND EXISTING PENETRATIONS IN FIRE -RATED PARTITIONS OR DRAFT STOPS SHALL BE PROTECTED BY A NOTIFICATION IS RECEIVED BY THE OWNER'S REPRESENTATIVE AND THE SYSTEM LISTED BY A RECOGNIZED TESTING AGENCY. ADDITIONAL COMPENSATION IS APPROVED IN ADVANCE OF PROCEEDING WITH THE WORK. 22. PROVIDE FIRE EXTINGUISHERS PER APPLICABLE CODES. VERIFY FINAL LOCATIONS WITH ANN TAYLOR, CONSTRUCTION MANAGER AND FIRE 56. THE STORE IS TO BE CONSTRUCTED IN ONE PHASE AND NOT IN DISTINCT 9. DEPARTMENT. SECTIONS. AS SUCH, THE HOURS OF WORK SHALL INCLUDE THOSE OUTSIDE 10. NORMAL MALL STORE HOURS FOR DEMOLITION, STRUCTURAL, SHEETROCK 23. CONTRACTOR SHALL COORDINATE WORK THAT AFFECTS THE ROOF WITH THE CEILINGS AND OTHER WORK WHICH CANNOT BE PERFORMED DURING STORE OPERATIONS. LANDLORD AND, IF REQUIRED BY THE LANDLORD, CONTRACT WITH THE SHELL ROOFING SUBCONTRACTOR TO PERFORM ALL WORK OF PENETRATING THE ROOF FOR ANY AND ALL ITEMS ADDED ON THE ROOF AND PATCHING/SEALING 57. THE CONTRACTOR SHALL PROVIDE FOR DAILY CLEANUP AND CONTINUOUS OF SUCH PENETRATIONS DURING AND AFTER EQUIPMENT INSTALLATION. HOUSE CLEANING AND TRASH REMOVAL. THIS WILL BE STRICTLY ENFORCED AND IN NO WAY COMPROMISED. COORDINATE TRASH REMOVAL AND 24. CONTRACTOR SHALL REVIEW THE DIMENSIONS OF ALL EQUIPMENT IN THE DUMPSTER PLACEMENT WITH MALL OPERATIONS MANAGER. PROJECT NOTES SEE DWG. FOR EQUIPMENT SCHEDULES AND NOTES. ALSO SEE ENGINEERING DWGS. ('E' SERIES) FOR CIRCUITS, PANELS, ETC. 3. ALL ELECTRICAL LOCKSETS OF ELECTRIC DEADBOLTS ARE TO BE PURCHASED WITH WIRING DIAGRAMS COORDINATING THEM CORRECTLY WITH SWITCHES AND CONTROLS SPECIFIED. 4. LOCATION / DIMENSION A. LOCATE ALL WALL RECEPTACLES, TELEPHONE AND SIGNAL OUTLETS 15" A.F.F. TO CENTERLINE UNLESS OTHERWISE INDICATED. B. INSTALL ALL WALL RECEPTACLES, TELEPHONE AND SIGNAL OUTLETS VERTICALLY UNLESS OTHERWISE INDICATED. C. ALL EXPOSED POWER SWITCHES (FAN, SECURITY, ETC.) SHALL BE INSTALLED AND AT SAME CENTERLINE A.F.F. AS ADJACENT LIGHT SWITCH, OR SHALL BE LOCATED AS OTHERWISE DIMENSIONED ON THE DRAWINGS. IF NOT DIMENSIONED, ARCHITECT SHALL DIRECT SUCH LOCATION IN FIELD. D. SEE ELEVATIONS FOR LOCATIONS OF WALL RECEPTACLES, TELEPHONE & SIGNAL OUTLETS UNLESS OTHERWISE DIMENSIONED OR INDICATED ON THE DRAWINGS. E. FLOOR RECEPTACLES, TELEPHONE AND SIGNAL OUTLETS SHALL BE LOCATED ONLY AS DIMENSIONED ON DRAWINGS OR AS OTHERWISE DIRECTED BY THE ARCHITECT. F. PAIRED WALL RECEPTACLES, TELEPHONE AND SIGNAL OUTLETS SHALL BE LOCATED 6"O.C. APART VERTICALLY, UNLESS OTHERWISE INDICATED ON DWGS. GANG SIMILAR OUTLETS WHENEVER POSSIBLE. ALL FINISH RECEPTACLE AND OUTLET PLATES SHALL BE INSTALLED PLUMB TO FLOOR AND CAREFULLY ALIGNED WITH OTHER PLATES IN THE IMMEDIATE AREA. TOP OF ALL FLUSH FLOOR RECEPTACLES AND OUTLETS SHALL BE FLUSH W/ TOP OF FINISH FLOOR, UNLESS OTHERWISE INDICATED, AND SHALL BE PROVIDED WITH CARPET FLANGES OR TRIM RINGS FOR EACH OUTLET TYPE AS APPROPRIATE FOR EACH FINISH FLOOR CONDITION. SUBSCRIPT'F' INDICATES FLUSH TYPE. SUBSCRIPT "CAB" AT RECEPTACLES, TELEPHONE AND SIGNAL OUTLETS. INDICATE THAT THIS ITEM IS TO BE LOCATED ON OR IN CABINETWORK (SEE CABINETWORK DRAWINGS FOR CLARIFICATION OF THESE FINISH LOCATIONS/DIMENSIONS). TELEPHONE / SIGNAL RUNS A. AT ALL WALL TELEPHONE AND SIGNAL OUTLETS, STUB -UP CONDUIT INTO SUSPENDED CEILING, UNLESS OTHERWISE INDICATED ON DRAWINGS. WHERE PARTITION DOES NOT EXTEND TO SUSPENDED CEILING, ROUTE HORIZONTALLY AS REQUIRED TO NEAREST CEILING -HIGH PARTITION. B. AT ALL FLOOR TELEPHONE AND SIGNAL OUTLETS, STUB -UP CONDUIT INTO SUSPENDED CEILING CIA NEAREST CEILING -HIGH PARTITION, UNLESS OTHERWISE INSTRUCTED ON THE DRAWINGS. C. ALL TELEPHONE AND SIGNAL CONDUIT SHALL BE MINIMUM OF'/4 UNLESS OTHERWISE REQUIRED ON THE DRAWINGS OR REQUIRED BY THE SIZE OF CABLE TO BE HOUSED (REF. ENGINEER'S ELECTRICAL DRAWINGS WHEN APPLICABLE.) D. ALL TELEPHONE AND SIGNAL WIRING IN PLENUM RETURN SPACE SHALL BE TEFLON. E. ALL TELEPHONE WIRING IS N.I.C. (BY TENANT'S TELEPHONE CONTRACTOR). F. ALL SIGNAL WIRING AND CABLE IS N.I.C., UNLESS OTHERWISE INDICATED ON THE DRAWINGS. NOT USED NIGHT BELL (N.B.) AND DAY CHIME (D.C.) SHALL BE LOCATED ABOVE FINISHED CEILING (SEE REFLECTED CEILING PLANS FOR PERFORATED TILE LOCATIONS AND ENGINEER'S DRAWINGS IN THIS SET FOR UNIT SPACES. E. ALL WALL THERMOSTATS SHALL BE INSTALLED VERIFY EXACT LOCATION W/ ARCHITECT AT 4'-6" A.F.F. U.O.N. F. CEILING TILE GRIDS TO BE CENTERED IN ROOM UNLESS OTHER START POINTS ARE SHOWN. G. ALL LIGHTING FIXTURES SHALL BE LOCATED BY POSITION SHOWN IN CEILING GRID U.O.N. OR DIMENSIONED. H. ALL REGISTERS, DIFFUSERS AND SPRINKLERS SHALL BE LOCATED BY POSITION SHOWN IN CEILING GRID U.O.N. OR DIMENSIONED. 3. MISCELLANEOUS A. ALL FINISH SWITCH PLATES SHALL BE INSTALLED SQUARE WITH ADJACENT FRAMES, WALLS AND CABINETWORK. B. SUBSCRIPT "CAB" AT SWITCHES INDICATE THAT ITEM IS TO BE LOCATED ON OR IN CABINETWORK. SEE CABINETWORK DWGS FOR CLARIFICATIONS OF THESE LOCATIONS. C. EXIT LIGHTS SHALL BE SPECIFIED ON ENGINEER'S LIGHTING PLAN. D. SPRINKLER SUBCONTRACTOR SHALL SUBMIT PROPOSED LAYOUT FOR ARCHITECT'S APPROVAL. (SEE SHOP DRAWING SUBMITTAL REQUIREMENTS) 4. SWITCHING A. ALL LIGHT FIXTURES SHALL BE SWITCHED BY SWITCH(ES) AS INDICATED FOR ITS CONTROL GROUP (SEE SYMBOL DESCRIPTION) B. IF NO CONTROL GROUP IS SHOWN, FIXTURE SHALL BE SWITCHED BY SWITCH LOCATED IN SAME SPACE. 5. FINISHES A. SEE LIGHTING FIXTURE SCHEDULE FOR ALL LIGHT FIXTURE FINISHES, FLANGES, LAMPING, ETC. B. ALL SWITCH PLATES SHALL BE WHITE, UNLESS OTHERWISE NOTED. C. ALL TOGGLE SWITCHES SHALL BE LEVITON DECORA ROCKER TYPE, WHITE FINISH. U.N.O. D. DIMMER SWITCHES AND PLATES SHALL BE LEVITON DECORA SLIDER TYPE TO MATCH ABOVE. E. NOT USED. F. ALL SPRINKLER HEADS SHALL BE BUILDING STANDARD CONCEALED TYPE G. ALL REGISTERS, DIFFUSERS & SPRINKLERHEAD COVERS SHALL BE PAINTED TO MATCH CEILING FINISH, U.O.N. 6. EXISTING CONDITIONS G.C. SHALL EXAMINE PREMISES PRIOR TO STARTING WORK TO DETERMINE IF ANY EXISTING ELECTRICAL CONDUITS, SPRINKLER PIPING, PLUMBING LINES, OR DUCTWORK ARE IN CONFLICT WITH THE LOCATIONS OF NEW LIGHT FIXTURES, CEILING A/C UNITS, ETC. G.C. SHALL PROVIDE FOR TENANT'S REVIEW AN ITEMIZED PRICE FOR THE RELOCATION OF ANY EXISTING WORK TO AVOID CONFLICT WITH NEW WORK. 7. PROVIDE ACCESS AS REQUIRED FOR ALL EQUIPMENT AND AS APPROVED PRIOR TO CONSTRUCTION BY ARCHITECT. 3. CONTRACTOR SHALL CHECK CLEARANCES FOR LIGHT FIXTURES PRIOR TO ORDERING FIXTURES AND REPORT ANY CONFLICTS TO ARCHITECT. WHEN FIXTURE INSTALLATION IS READY TO COMMENCE, CONTRACTOR WILL RECHECK CLEARANCES PRIOR TO INSTALLING ANY FIXTURE OR GROUP OF FIXTURES IN A ROOM OR SPACE. BUILDING RULES CLEAN-UP / TRASH REMOVAL: 1. CONSTRUCTION AREA MUST BE BROOM SWEPT DAILY AND ALL CONSTRUCTION DEBRIS MUST BE REMOVED DAILY. 2. CONTRACTOR SHALL PROVIDE ITS OWN CLEANING AND TRASH REMOVAL SERVICE FOR BOTH DEMOLITION AND CONSTRUCTION DEBRIS AND DAILY CLEANING. ALL SUBCONTRACTORS TO BE APPROVED PRIOR TO COMMENCEMENT OF WORK. 3. SHOE WIPING MATS WILL BE INSTALLED AT ALL OPENINGS BETWEEN CONSTRUCTION AND PUBLIC AREAS AND AT EACH FREIGHT ELEVATOR. 4. AT THE COMPLETION OF THE JOB, EXCESS MATERIAL, MUST BE REMOVED FROM JOB AND CARTED AWAY FROM THE BUILDING. CONTACT THE BUILDING MANAGER TO SCHEDULE USE OF THE FREIGHT ELEVATOR. 5. DEBRIS FROM WORK AREA, FLOOR AND LOADING AREAS. THE BUILDING MANAGER MAY PROVIDE CLEAN-UP, BUT THEY MUST BE ISSUED A SCHEDULE AND CHARGEABLE WORK ORDER NUMBER FOR ANY SUCH WORK. CONTACT THE BUILDING MANAGER. 6. TRASH REMOVAL MUST BE SCHEDULED AS PERMITTED BY BUILDING MANAGEMENT. ELEVATORS: 1. USE OF THE BUILDING ELEVATOR MUST BE SCHEDULED WITH BUILDING MANAGEMENT. 2. ALL REQUEST FOR EARLY OR AFTER HOUR FREIGHT ELEVATOR SERVICE MUST BE MADE AT LEAST 2 DAYS IN ADVANCE. SPECIAL CONDITIONS 1. SHOP DRAWINGS PROCEDURE- IN ADDITION TO THE SHOP DRAWINGS AND SAMPLE SUBMITTAL REQUIREMENTS SET FORTH IN THE CONSTRUCTION DOCUMENTS, THE ARCHITECT REQUIRES THAT THE GENERAL CONTRACTOR SUBMIT ALL SHOP DRAWINGS FIRST TO THE ARCHITECT, WHO WILL THEN SUBMIT THEM TO THE ENGINEERS (OR OTHER CONSULTANTS) FOR REVIEW BEFORE BEING RETURNED TO THE G.C. THROUGH THE ARCHITECTS OFFICE FOR COORDINATION. NO SHOP DRAWINGS SHALL BE SENT DIRECTLY TO THE ENGINEERS WITHOUT PRIOR SEPARATE EXPRESS AGREEMENT OF THE ARCHITECT AS TO EACH EXCEPTION TO THIS RULE. 2. ALL SHOP DRAWINGS & CUTSHEETS MUST BE REVIEWED BY ANN TAYLOR DESIGN MANAGER AFTER ARCHITECT AND CONSULTANT REVIEW AND PRIOR TO BEING RETURNED TO THE GENERAL CONTRACTOR. REVIEWED SHOP DRAWINGS & CUTSHEETS MUST BE UPLOADED TO CONSTRUCTWARE IN THE APPROPRIATE FOLDER AFTER APPROVAL BY GENERAL CONTRACTOR. 3. 3/8" SCALE COMPOSITE DRAWINGS - AT LEAST TEN DAYS PRIOR TO COMMENCING ANY FABRICATION OR INSTALLATION WORK, THE G.C. SHALL COMPLETE THE PREPARATION FOR HIS OWN OF A COORDINATED MECHANICAL (HVAC), ELECTRICAL (POWER, LIGHTING, TELEPHONE, LIFE SAFETY, COMMUNICATIONS), PLUMBING AND SPRINKLER DRAWING (OR DRAWINGS) AT 3/8"=1'-0" SCALE WITH ALL RELEVANT EXISTING CONDITIONS SHOWN (I.E., CONDUITS, STRUCTURE, PIPING, ALARM & EXIT SYSTEMS, ACCESS NEEDS, ETC.) AND SHALL INFORM THE ARCHITECT AT THIS TIME OF ALL CONFLICTING CONDITIONS. 4. SITE TELEPHONE, FAX MACHINE, AND REFERENCE TABLE - THE G.C. SHALL INSTALL AND MAINTAIN AT HIS OWN EXPENSE ON THE IMMEDIATE SITE AT THE SAME LOCATION A LOCKING SITE TELEPHONE AND FAX MACHINE, TO BE AVAILABLE STRICTLY FOR JOB-RELATED NEEDS AND USES, AND AT LEAST ONE 3'-0" X T-0" REFERENCE TABLE, TO BE USED EXCLUSIVELY FOR A REQUIRED SITE WORKING COPY OF THE DRAWINGS, WITH AT LEAST TWO T-0" FOOT LONG SHELVES ABOVE FOR STORAGE OF CATALOG CUTS, SHOP DWG's. & SAMPLES. G.C. SHALL HAVE A TELEPHONE AND FAX ON SITE FROM COMMENCEMENT OF PROJECT. 5. CATALOGS, MAINTENANCE INSTRUCTIONS, GUARANTEES- PRIOR TO THE COMPLETION OF THIS WORK THE G.C. SHALL FURNISH THE TENANT/OWNER WITH A COMPLETE SET (IN LOOSE LEAF BINDER (S) OF MANUFACTURER'S CATALOGS, OPERATING INSTRUCTIONS, & SIMILAR DATA AND ALL GUARANTEE'S FOR ALL EQUIPMENT AND OPERABLE DEVICES FURNISHED OR INSTALLED BY THE G.C. IN THIS CONSTRUCTION, AND SHALL ORIENT AND INSTRUCT THE PERSONNEL DESIGNATED BY THE TENANT/OWNER IN THE OPERATION OF ALL SUCH EQUIPMENT. 6. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CHALK ON SITE THE LOCATIONS OF ALL PARTITION WALLS. LIGHT FIXTURES, WALL FIXTURES, EXIT SIGNS, SPRINKLER HEADS, ACCESS PANELS, AND LINEAR DIFFUSERS FOR REVIEW BY ARCHITECT. 7. FACE OF DOOR JAMB SHALL BE 4" FROM ADJACENT WALL UNLESS OTHERWISE NOTED. PROVIDE GALVANIC INSULATION BETWEEN DISSIMILAR METALS. TURNOVER REQUIREMENTS 1. THE CONTRACTOR SHALL ARRANGE FOR ALL INSPECTIONS AND FURNISH OWNER'S REPRESENTATIVE WITH THE CERTIFICATE OF OCCUPANCY. G.C. IS ALSO TO PROVIDE A TYPE -WRITTEN LIST OF NAMES, ADDRESSES AND PHONE NUMBERS OF ALL SUBCONTRACTORS AND MATERIAL SUPPLIERS. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HAVING THE ENTIRE STORE CLEANED TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE AT THE TIME OF CARPET, FIXTURE AND FURNITURE INSTALLATION AND AT TURNOVER. 3. PRIOR TO THE STORE OPENING, CONTRACTOR IS TO ARRANGE FOR A NEEB CERTIFIED INDEPENDENT BALANCING CONTRACTOR TO BALANCE THE HVAC SYSTEM AND PROVIDE A COPY OF THE BALANCING REPORT TO THE OWNER'S REPRESENTATIVE AND THE MALL MANAGER IN A FORMAT ACCEPTABLE TO THE MALL. 4. IF REQUIRED BY LANDLORD, THE CONTRACTOR SHALL SECURE ANY NECESSARY APPROVALS FOR STORE SPRINKLER SYSTEM REQUIRED BY LANDLORD'S INSURANCE CARRIER. 5. CONTRACTOR TO TURN OVER ALL KEYS TO THE OWNER'S REPRESENTATIVES AND MARK EACH KEY FOR IDENTIFICATION. 6. THE CONTRACTOR SHALL SET ALL THE TIME CLOCKS, THERMOSTATS, ETC. PER THE REQUIREMENTS OF THE OWNER'S REPRESENTATIVE. 7. THE CONTRACTOR SHALL EXPLAIN THE OPERATION OF ALL MECHANICAL SYSTEMS TO THE OWNER'S REPRESENTATIVE AND PROVIDE COPIES OF OPERATION, MAINTENANCE AND WARRANTY MANUALS. 8. GENERAL CONTRACTOR SHALL SUBMIT ONE COMPLETE SET OF REPRODUCIBLE DRAWINGS INDICATING ALL DISCREPANCIES, CHANGES, ETC. AND ACTUAL LOCATIONS OF CONCEALED WORK (I.E., UNDERGROUND CONDUIT) TO THE OWNER'S REPRESENTATIVE. THE GENERAL CONTRACTOR SHALL ALSO SUBMIT A PHOTOCOPY OF THE ACTUAL PANEL DIAGRAM. 9. THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS SHALL WARRANTY THE WORK FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE BY TENANT OF FINISHED WORK. 10. THE GENERAL CONTRACTOR SHALL INSTALL NEW FILTERS IN THE HVAC UNITS ONE WEEK PRIOR TO TURNOVER OF THE PROJECT. DRAWING NOTES 1. DRAWINGS ARE INTENDED TO CONVEY DESIGN INTENT ONLY. CONTRACTOR AND/OR FABRICATOR SHALL HAVE SOLE RESPONSIBILITY FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE WORK TO PRODUCE THE INTENT OF THE DRAWINGS. CONTRACTOR/FABRICATOR IS SOLELY RESPONSIBLE FOR STRUCTURAL INTEGRITY AND PERFORMANCE OF ALL ELEMENTS. 2. CONTRACTOR/FABRICATOR IS SOLELY RESPONSIBLE FOR COORDINATING AND VERIFYING ALL DIMENSIONS. ANY DISCREPANCIES RELATED TO THE DRAWINGS MUST BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO FABRICATION. 3. ANY DEVIATION FROM THE INTENT OF THE DRAWINGS MUST BE APPROVED BY ARCHITECT & ANN TAYLOR DESIGN MANAGER. 4. SHOP DRAWINGS AND SAMPLES OF ALL FINISHES MUST BE SUBMITTED AND MUST BE APPROVED BY ARCHITECT & ANN TAYLOR DESIGN MANAGER. 5. DO NOT SCALE DRAWINGS FIRE ALARM SYSTEM NOTES 1. BEFORE DEMOLITION CAN START, A DISCONNECT MUST BE DONE ON THE MALL FIRE ALARM SYSTEM AND THE D.D.C. CONTROL SYSTEM. ANY DAMAGE DONE TO THE SYSTEM WILL BE PAID FOR BY GENERAL CONTRACTOR AT THEIR EXPENSE. P�\C ASSIQY No 109000 3 s STATE OF Z OZ U 0 c U) H O N � J - J J cu a U Z N a- M W CR 0 N M O cci O c� a. U cn U) z w O Q p rn W W J 0 N LL, M 0 LLJ w 0 hW-- PROJECT REGARDLESS OF THE SOURCE AND COORDINATE ACCESS TO THE 58. CONTRACTOR TO REPLACE FILTERS ON HVAC UNIT AT COMPLETION OF 11. FACE PLATES ® SPACE AND VERIFY CLEAR FLOOR SPACE IS PROVIDED AS REQUIRED TO ENSURE EASE OF INSTALLATION. PROJECT. THE HVAC SYSTEM SHALL BE MAINTAINED IN SERVICE AS LONG AS POSSIBLE TO ALLOW FOR THE SHORTEST SHUTDOWN TIME AS POSSIBLE M A. FACE PLATES FOR WALL SIGNAL OUTLETS TO BE ONE HOLE TYPE U.O.N. 25. CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL OTHER DURING STORE OPEN HOURS. TENANTS GENERAL CONTRACTOR MUST HIRE THE LANDLORD'S ROOFING CONTRACTOR FOR ALL ROOF REPAIR AND t-4 B. FACE PLATES FOR TELEPHONE OUTLETS TO BE PROVIDED BY TENANT'S TELEPHONE SUBCONTRACTOR. U CONTRACTORS AND VENDORS FURNISHING LABOR, MATERIALS, ETC. ON THE PROJECT TO ENSURE THE WORK AS A WHOLE SHALL BE EXECUTED AND o FINISHING OF PENETRATIONS AND EQUIPMENT CURBS. PROVIDE AIR Q C. FACE PLATES FOR COMBINATION SIGNAL/TELEPHONE WALL OUTLETS TO HAVE TWO MODULAR PHONE JACKS U.O.N. FACE PLATES TO BE -- COMPLETED WITHOUT CONFLICT OR DELAY. BALANCE REPORT TO MALL OPERATIONS MANAGER. W PROVIDED AND INSTALLED BY TENANT'S TELEPHONE SUBCONTRACTOR 26. CONTRACTOR SHALL COORDINATE THE REQUIREMENTS OF ANY AND ALL 59. IN ADDITION TO COMPLYING WITH ALL CODE AND GOVERNMENT AGENCIES HAVING JURISDICTION, ALL WORK PERFORMED SHALL FULLY COMPLY WITH 12. ALL ELECT. CONDUIT AND PLUMBING PIPING IN CEILING OF FLOOR BELOW DRAWINGS INCLUDING ARCHITECTURAL, MECHANICAL, ELECTRICAL, >" ALL STANDARDS AND REQUIREMENTS SET FORTH IN MALL TENANT DESIGN 0 WILL BE INSTALLED AS TIGHT TO SLAB AS POSSIBLE. i- MILLWORK (CABINET) SKETCHES/DETAILS. ANY CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER AND ARCHITECT PRIOR TO CRITERIA MANUAL. 13. REFER TO ENGINEERING DRAWINGS FOR OTHER SYMBOLS, NOTES AND J U EXECUTION OF WORK. U SPECIFICATIONS (WHEN APPLICABLE). 27. NOT USED. M Q 14. CONTRACTOR TO PROVIDE ALL NECESSARY CORE DRILLS TO LOCATE 28. CONTRACTOR TO VERIFY THAT EQUIPMENT HAS APPROPRIATE CLEARANCESOUTLETS, EQUIPMENT NOTES DEVICES OR TO CONNECT CONDUIT BETWEEN FLOORS. DURING INSTALLATION INCLUDING MAINTENANCE CLEARANCES; VERIFY A THOSE WHICH INVOLVE CONFLICTING UTILITIES. 1. CONTRACTOR SHALL FURNISH AND INSTALL ALL EQUIPMENT SHOWN OR 15. ALL ELECTRICAL WORK TO BE FILED BY THE LICENSED ELECTRICAL CONTRACTOR @ THE B.E.C. 29. PROVIDE AND INSTALL ALL NECESSARY IN -WALL FRAMING REQUIRED TO CARRY SHELF, HANGING, AND VALANCE LOADS, RAILINGS, ETC. AS PER SPECIFIED IN CONSTRUCTION DOCUMENTS. CONTRACTOR SHALL PROVIDE LATEST MODEL OF EQUIPMENT. WHERE NEWER MODEL OF EQUIPMENT IS REFLECTED CEILING NOTES PLANS. BEING PROVIDED INSTEAD OF THE MODEL LISTED CONTRACTOR SHALL NOTIFY THE ARCHITECT AND PROVIDE THE ARCHITECT WITH CATALOG 1. ELEVATIONS/DATUMS 30. PROVIDE SILICONE SEALANT AT ALL JOINTS AND INTERFACES OF ALL CUTS/LITERATURE SHOWING THE NEWER MODEL. COUNTERTOPS, EQUIPMENT, BOOTHS, WALLS, ETC.; COLOR TO BE APPROVED BY OWNER. 2. TENANT SHALL FURNISH AND INSTALL ALL EQUIPMENT INDICATED AS 'NIC' IN A. ALL ACOUSTIC TILE CEILINGS SHALL L INSTALLED AS NOTED. GRAIN DIRECTION OF TILE, IF ANY GRAIN, SHALL BE NORTH -SOUTH. 31. ALL JOINTS AND OTHER OPENINGS IN THE BUILDING ENVELOPE SHALL BE CONSTRUCTION DOCUMENTS. CONTRACTOR SHALL PROVIDE POWER, RECEPTACLES, CONNECTIONS, OR OTHER LABOR OR MATERIAL AS SPECIFIED B. GWB CEILING HEIGHTS TO BE AS INDICATED ON REFLECTED CEILING PLANS AND ELEVATIONS. SEALED IN ACCORDANCE WITH THE BUILDING CODE AND ENERGY CODE. AND/OR SHOWN BY THESE NOTES, SCHEDULES, AND DRAWINGS. 32. ALL WOOD IN CONTACT WITH CONCRETE MASONRY SHALL BE PRESSURE- 3. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE 2. LOCATIONS/DIMENSIONS TREATED, MOISTURE -RESISTANT WOOD. MANUFACTURER'S RECOMMENDATION. CONTRACTOR SHALL CONFIRM WITH CONTRACTOR OR MANUFACTURER'S REPRESENTATIVE ALL REQUIREMENTS A. LOCATE ALL SWITCHES AT T-6" A.F.F. TO CENTERLINE OF SWITCH U.O.N. B. INSTALL ALL SWITCHES VERTICALLY U.O.N. 33. ALL WOOD TRIM OR OTHER PREFINISHED TRIM ITEMS SHALL BE CUT TO FIT AND RAW, EXPOSED SURFACES SHALL BE FINISHED TO MATCH ADJACENT AND FOR EQUIPMENT [FURNISHED EITHER BY HIM OR OWNER] INCLUDING EXACT AND TYPES OF ELECTRICAL OR PLUMBING CONNECTIONS, SIZES OF C. SCALE ELEVATIONS LOCATION OF SWITCHES U.O.N. D. ALL SWITCHES IN SAME LOCATION SHALL BE GANGED UNDER A SINGLE FINISH MATERIALS. EQUIPMENT, ETC. COVER PLATE. E. ALL WALL THERMOSTATS SHALL BE INSTALLED VERIFY EXACT LOCATION W/ ARCHITECT AT 4'-6" A.F.F. U.O.N. F. CEILING TILE GRIDS TO BE CENTERED IN ROOM UNLESS OTHER START POINTS ARE SHOWN. G. ALL LIGHTING FIXTURES SHALL BE LOCATED BY POSITION SHOWN IN CEILING GRID U.O.N. OR DIMENSIONED. H. ALL REGISTERS, DIFFUSERS AND SPRINKLERS SHALL BE LOCATED BY POSITION SHOWN IN CEILING GRID U.O.N. OR DIMENSIONED. 3. MISCELLANEOUS A. ALL FINISH SWITCH PLATES SHALL BE INSTALLED SQUARE WITH ADJACENT FRAMES, WALLS AND CABINETWORK. B. SUBSCRIPT "CAB" AT SWITCHES INDICATE THAT ITEM IS TO BE LOCATED ON OR IN CABINETWORK. SEE CABINETWORK DWGS FOR CLARIFICATIONS OF THESE LOCATIONS. C. EXIT LIGHTS SHALL BE SPECIFIED ON ENGINEER'S LIGHTING PLAN. D. SPRINKLER SUBCONTRACTOR SHALL SUBMIT PROPOSED LAYOUT FOR ARCHITECT'S APPROVAL. (SEE SHOP DRAWING SUBMITTAL REQUIREMENTS) 4. SWITCHING A. ALL LIGHT FIXTURES SHALL BE SWITCHED BY SWITCH(ES) AS INDICATED FOR ITS CONTROL GROUP (SEE SYMBOL DESCRIPTION) B. IF NO CONTROL GROUP IS SHOWN, FIXTURE SHALL BE SWITCHED BY SWITCH LOCATED IN SAME SPACE. 5. FINISHES A. SEE LIGHTING FIXTURE SCHEDULE FOR ALL LIGHT FIXTURE FINISHES, FLANGES, LAMPING, ETC. B. ALL SWITCH PLATES SHALL BE WHITE, UNLESS OTHERWISE NOTED. C. ALL TOGGLE SWITCHES SHALL BE LEVITON DECORA ROCKER TYPE, WHITE FINISH. U.N.O. D. DIMMER SWITCHES AND PLATES SHALL BE LEVITON DECORA SLIDER TYPE TO MATCH ABOVE. E. NOT USED. F. ALL SPRINKLER HEADS SHALL BE BUILDING STANDARD CONCEALED TYPE G. ALL REGISTERS, DIFFUSERS & SPRINKLERHEAD COVERS SHALL BE PAINTED TO MATCH CEILING FINISH, U.O.N. 6. EXISTING CONDITIONS G.C. SHALL EXAMINE PREMISES PRIOR TO STARTING WORK TO DETERMINE IF ANY EXISTING ELECTRICAL CONDUITS, SPRINKLER PIPING, PLUMBING LINES, OR DUCTWORK ARE IN CONFLICT WITH THE LOCATIONS OF NEW LIGHT FIXTURES, CEILING A/C UNITS, ETC. G.C. SHALL PROVIDE FOR TENANT'S REVIEW AN ITEMIZED PRICE FOR THE RELOCATION OF ANY EXISTING WORK TO AVOID CONFLICT WITH NEW WORK. 7. PROVIDE ACCESS AS REQUIRED FOR ALL EQUIPMENT AND AS APPROVED PRIOR TO CONSTRUCTION BY ARCHITECT. 3. CONTRACTOR SHALL CHECK CLEARANCES FOR LIGHT FIXTURES PRIOR TO ORDERING FIXTURES AND REPORT ANY CONFLICTS TO ARCHITECT. WHEN FIXTURE INSTALLATION IS READY TO COMMENCE, CONTRACTOR WILL RECHECK CLEARANCES PRIOR TO INSTALLING ANY FIXTURE OR GROUP OF FIXTURES IN A ROOM OR SPACE. BUILDING RULES CLEAN-UP / TRASH REMOVAL: 1. CONSTRUCTION AREA MUST BE BROOM SWEPT DAILY AND ALL CONSTRUCTION DEBRIS MUST BE REMOVED DAILY. 2. CONTRACTOR SHALL PROVIDE ITS OWN CLEANING AND TRASH REMOVAL SERVICE FOR BOTH DEMOLITION AND CONSTRUCTION DEBRIS AND DAILY CLEANING. ALL SUBCONTRACTORS TO BE APPROVED PRIOR TO COMMENCEMENT OF WORK. 3. SHOE WIPING MATS WILL BE INSTALLED AT ALL OPENINGS BETWEEN CONSTRUCTION AND PUBLIC AREAS AND AT EACH FREIGHT ELEVATOR. 4. AT THE COMPLETION OF THE JOB, EXCESS MATERIAL, MUST BE REMOVED FROM JOB AND CARTED AWAY FROM THE BUILDING. CONTACT THE BUILDING MANAGER TO SCHEDULE USE OF THE FREIGHT ELEVATOR. 5. DEBRIS FROM WORK AREA, FLOOR AND LOADING AREAS. THE BUILDING MANAGER MAY PROVIDE CLEAN-UP, BUT THEY MUST BE ISSUED A SCHEDULE AND CHARGEABLE WORK ORDER NUMBER FOR ANY SUCH WORK. CONTACT THE BUILDING MANAGER. 6. TRASH REMOVAL MUST BE SCHEDULED AS PERMITTED BY BUILDING MANAGEMENT. ELEVATORS: 1. USE OF THE BUILDING ELEVATOR MUST BE SCHEDULED WITH BUILDING MANAGEMENT. 2. ALL REQUEST FOR EARLY OR AFTER HOUR FREIGHT ELEVATOR SERVICE MUST BE MADE AT LEAST 2 DAYS IN ADVANCE. SPECIAL CONDITIONS 1. SHOP DRAWINGS PROCEDURE- IN ADDITION TO THE SHOP DRAWINGS AND SAMPLE SUBMITTAL REQUIREMENTS SET FORTH IN THE CONSTRUCTION DOCUMENTS, THE ARCHITECT REQUIRES THAT THE GENERAL CONTRACTOR SUBMIT ALL SHOP DRAWINGS FIRST TO THE ARCHITECT, WHO WILL THEN SUBMIT THEM TO THE ENGINEERS (OR OTHER CONSULTANTS) FOR REVIEW BEFORE BEING RETURNED TO THE G.C. THROUGH THE ARCHITECTS OFFICE FOR COORDINATION. NO SHOP DRAWINGS SHALL BE SENT DIRECTLY TO THE ENGINEERS WITHOUT PRIOR SEPARATE EXPRESS AGREEMENT OF THE ARCHITECT AS TO EACH EXCEPTION TO THIS RULE. 2. ALL SHOP DRAWINGS & CUTSHEETS MUST BE REVIEWED BY ANN TAYLOR DESIGN MANAGER AFTER ARCHITECT AND CONSULTANT REVIEW AND PRIOR TO BEING RETURNED TO THE GENERAL CONTRACTOR. REVIEWED SHOP DRAWINGS & CUTSHEETS MUST BE UPLOADED TO CONSTRUCTWARE IN THE APPROPRIATE FOLDER AFTER APPROVAL BY GENERAL CONTRACTOR. 3. 3/8" SCALE COMPOSITE DRAWINGS - AT LEAST TEN DAYS PRIOR TO COMMENCING ANY FABRICATION OR INSTALLATION WORK, THE G.C. SHALL COMPLETE THE PREPARATION FOR HIS OWN OF A COORDINATED MECHANICAL (HVAC), ELECTRICAL (POWER, LIGHTING, TELEPHONE, LIFE SAFETY, COMMUNICATIONS), PLUMBING AND SPRINKLER DRAWING (OR DRAWINGS) AT 3/8"=1'-0" SCALE WITH ALL RELEVANT EXISTING CONDITIONS SHOWN (I.E., CONDUITS, STRUCTURE, PIPING, ALARM & EXIT SYSTEMS, ACCESS NEEDS, ETC.) AND SHALL INFORM THE ARCHITECT AT THIS TIME OF ALL CONFLICTING CONDITIONS. 4. SITE TELEPHONE, FAX MACHINE, AND REFERENCE TABLE - THE G.C. SHALL INSTALL AND MAINTAIN AT HIS OWN EXPENSE ON THE IMMEDIATE SITE AT THE SAME LOCATION A LOCKING SITE TELEPHONE AND FAX MACHINE, TO BE AVAILABLE STRICTLY FOR JOB-RELATED NEEDS AND USES, AND AT LEAST ONE 3'-0" X T-0" REFERENCE TABLE, TO BE USED EXCLUSIVELY FOR A REQUIRED SITE WORKING COPY OF THE DRAWINGS, WITH AT LEAST TWO T-0" FOOT LONG SHELVES ABOVE FOR STORAGE OF CATALOG CUTS, SHOP DWG's. & SAMPLES. G.C. SHALL HAVE A TELEPHONE AND FAX ON SITE FROM COMMENCEMENT OF PROJECT. 5. CATALOGS, MAINTENANCE INSTRUCTIONS, GUARANTEES- PRIOR TO THE COMPLETION OF THIS WORK THE G.C. SHALL FURNISH THE TENANT/OWNER WITH A COMPLETE SET (IN LOOSE LEAF BINDER (S) OF MANUFACTURER'S CATALOGS, OPERATING INSTRUCTIONS, & SIMILAR DATA AND ALL GUARANTEE'S FOR ALL EQUIPMENT AND OPERABLE DEVICES FURNISHED OR INSTALLED BY THE G.C. IN THIS CONSTRUCTION, AND SHALL ORIENT AND INSTRUCT THE PERSONNEL DESIGNATED BY THE TENANT/OWNER IN THE OPERATION OF ALL SUCH EQUIPMENT. 6. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CHALK ON SITE THE LOCATIONS OF ALL PARTITION WALLS. LIGHT FIXTURES, WALL FIXTURES, EXIT SIGNS, SPRINKLER HEADS, ACCESS PANELS, AND LINEAR DIFFUSERS FOR REVIEW BY ARCHITECT. 7. FACE OF DOOR JAMB SHALL BE 4" FROM ADJACENT WALL UNLESS OTHERWISE NOTED. PROVIDE GALVANIC INSULATION BETWEEN DISSIMILAR METALS. TURNOVER REQUIREMENTS 1. THE CONTRACTOR SHALL ARRANGE FOR ALL INSPECTIONS AND FURNISH OWNER'S REPRESENTATIVE WITH THE CERTIFICATE OF OCCUPANCY. G.C. IS ALSO TO PROVIDE A TYPE -WRITTEN LIST OF NAMES, ADDRESSES AND PHONE NUMBERS OF ALL SUBCONTRACTORS AND MATERIAL SUPPLIERS. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HAVING THE ENTIRE STORE CLEANED TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE AT THE TIME OF CARPET, FIXTURE AND FURNITURE INSTALLATION AND AT TURNOVER. 3. PRIOR TO THE STORE OPENING, CONTRACTOR IS TO ARRANGE FOR A NEEB CERTIFIED INDEPENDENT BALANCING CONTRACTOR TO BALANCE THE HVAC SYSTEM AND PROVIDE A COPY OF THE BALANCING REPORT TO THE OWNER'S REPRESENTATIVE AND THE MALL MANAGER IN A FORMAT ACCEPTABLE TO THE MALL. 4. IF REQUIRED BY LANDLORD, THE CONTRACTOR SHALL SECURE ANY NECESSARY APPROVALS FOR STORE SPRINKLER SYSTEM REQUIRED BY LANDLORD'S INSURANCE CARRIER. 5. CONTRACTOR TO TURN OVER ALL KEYS TO THE OWNER'S REPRESENTATIVES AND MARK EACH KEY FOR IDENTIFICATION. 6. THE CONTRACTOR SHALL SET ALL THE TIME CLOCKS, THERMOSTATS, ETC. PER THE REQUIREMENTS OF THE OWNER'S REPRESENTATIVE. 7. THE CONTRACTOR SHALL EXPLAIN THE OPERATION OF ALL MECHANICAL SYSTEMS TO THE OWNER'S REPRESENTATIVE AND PROVIDE COPIES OF OPERATION, MAINTENANCE AND WARRANTY MANUALS. 8. GENERAL CONTRACTOR SHALL SUBMIT ONE COMPLETE SET OF REPRODUCIBLE DRAWINGS INDICATING ALL DISCREPANCIES, CHANGES, ETC. AND ACTUAL LOCATIONS OF CONCEALED WORK (I.E., UNDERGROUND CONDUIT) TO THE OWNER'S REPRESENTATIVE. THE GENERAL CONTRACTOR SHALL ALSO SUBMIT A PHOTOCOPY OF THE ACTUAL PANEL DIAGRAM. 9. THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS SHALL WARRANTY THE WORK FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE BY TENANT OF FINISHED WORK. 10. THE GENERAL CONTRACTOR SHALL INSTALL NEW FILTERS IN THE HVAC UNITS ONE WEEK PRIOR TO TURNOVER OF THE PROJECT. DRAWING NOTES 1. DRAWINGS ARE INTENDED TO CONVEY DESIGN INTENT ONLY. CONTRACTOR AND/OR FABRICATOR SHALL HAVE SOLE RESPONSIBILITY FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE WORK TO PRODUCE THE INTENT OF THE DRAWINGS. CONTRACTOR/FABRICATOR IS SOLELY RESPONSIBLE FOR STRUCTURAL INTEGRITY AND PERFORMANCE OF ALL ELEMENTS. 2. CONTRACTOR/FABRICATOR IS SOLELY RESPONSIBLE FOR COORDINATING AND VERIFYING ALL DIMENSIONS. ANY DISCREPANCIES RELATED TO THE DRAWINGS MUST BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR TO FABRICATION. 3. ANY DEVIATION FROM THE INTENT OF THE DRAWINGS MUST BE APPROVED BY ARCHITECT & ANN TAYLOR DESIGN MANAGER. 4. SHOP DRAWINGS AND SAMPLES OF ALL FINISHES MUST BE SUBMITTED AND MUST BE APPROVED BY ARCHITECT & ANN TAYLOR DESIGN MANAGER. 5. DO NOT SCALE DRAWINGS FIRE ALARM SYSTEM NOTES 1. BEFORE DEMOLITION CAN START, A DISCONNECT MUST BE DONE ON THE MALL FIRE ALARM SYSTEM AND THE D.D.C. CONTROL SYSTEM. ANY DAMAGE DONE TO THE SYSTEM WILL BE PAID FOR BY GENERAL CONTRACTOR AT THEIR EXPENSE. P�\C ASSIQY No 109000 3 s STATE OF Z OZ U 0 c U) H O N � J - J J cu a U Z N a- M W CR 0 N M O cci O c� a. U cn U) z w O Q p rn W W J 0 N LL, M 0 LLJ w 0 hW-- project no. 210780.03 drawn check by MC BP ® M W t-4 U�It U o Q m -- z W W � w >" 0 i- Qoz J U J U m w M Q U project no. 210780.03 drawn check by MC BP FULL SCALE (24X36): 1/8" = 1'-0" HALF-SIZE (12X18): 1/16" = 1'-0" (unless otherwise noted) sheet Am004 GENERALAND ADDITIONAL NOTES a� A FULL SCALE (24X36): 1/8" = 1'-0" HALF-SIZE (12X18): 1/16" = 1'-0" (unless otherwise noted) sheet Am004 GENERALAND ADDITIONAL NOTES