Loading...
HomeMy WebLinkAboutA000.1TOP OF FOOTING \A1;8'-1{\H0.750000x;\S1#8;}" \A1;PER STRUCTURAL DETAIL \A1;7'-2{\H0.750000x;\S7#8;}" FINISHED GRADETOP OF FOUNDATIONTOP OF FIRST FLOOR FIRST FLOOR PLATETOP OF SECOND FLOOR SECOND FLOOR PLATE \A1;PER.\PPLAN SCALE:BASEMENT BUILDING SECTION1/4" = 1'-0"1 125125 INSULATION, PER SPEC. BASEMENT FLOOR SYSTEM, PER SPEC. BASEMENT INSULATION IF REQUIRED, PER SPEC.INSULATION, PER SPEC. INSULATION, PER SPEC.INSULATION, PER SPEC. OWNER'S SUITE ENTRY / LAUNDRY 2345678 1 9101112131415 \A1;10"\A1;MIN.\A1;7 {\H0.7x;\S3#4;}"\PMAX\A1;6'-8"\A1;MIN. HEAD CLEARANCE FLOOR SYSTEM, PER SPEC.HANDRAIL PER CODE ATTIC SPACE INSULATION, PER SPEC. PRE-ENGINEERED ROOF TRUSSES, PER MANUFACTURER GARAGE \A1;2'-0"\A1;2'-0"LINE OF OPT. TRAY CLG. \A1;FROST DEPTH\PPER LOCAL CODE \A1;9'-1{\H0.750000x;\S1#8;}"\A1;OPT. 10'-1{\H0.7x;\S1#8;}" \A1;8'-2{\H0.750000x;\S7#8;}"\A1;9'-2{\H0.7x;\S7#8;}" @ OPT. 10' PLATE WINDOW HDR. HGT. WINDOW HDR. HGT. SCALE:BASEMENT BUILDING SECTION1/4" = 1'-0"2 TOP OF FOOTING FINISHED GRADETOP OF FOUNDATIONTOP OF FIRST FLOOR FIRST FLOOR PLATE \A1;PER STRUCTURAL DETAIL INSULATION, \PPER SPEC. PRE-ENGINEERED ROOF TRUSSES, PER MANUFACTURER KITCHEN GATHERING ROOM POWDER STORAGE BASEMENT FLOOR SYSTEM, PER SPEC.INSULATION, PER SPEC. INSULATION, PER SPEC. BASEMENT INSULATION IF REQUIRED, PER SPEC.INSULATION, PER SPEC. INSULATION, PER SPEC.\A1;9'-1{\H0.750000x;\S1#8;}"\A1;OPT. 10'-1{\H0.7x;\S1#8;}" \A1;8'-2{\H0.750000x;\S7#8;}"\A1;9'-2{\H0.7x;\S7#8;}" @ OPT. 10' PLATE WINDOW HDR. HGT.1 9 0 0 G o l f R o a d , S u i t e 3 0 0 S c h a u m b u r g , I l l i n o i s 6 0 1 7 3 Mi d w e s t Z o n e O f f i c e ........................... PLAN NAME SHEET PRODUCTION MANAGER DATE / DESCRIPTION NPC PLAN NUMBERLAWSON PLAN ID GARAGE HANDING REV # NOTE: SCALES NOTED ON DRAWINGS RELATE TO FULL SIZE PLOTS ON 22x34 SHEETS - 11x17 SHEETS REPRESENT 1/2 SCALE PLOTS INITIAL RELEASE DATE:CURRENT RELEASE DATE: (c) Copyright Pulte Home Corporation - 2017 RICK STARKEY06/07/2013 GARAGE LEFT Croix 1993.301 -- 08/01/2017 PLOTTED: October 6, 2017 / Mark Muurisepp / 1993-CROIX-CZ-BAS2-SECT.DWG A2 B.1 Bu i l d i n g S e c t i o n s .Ba s e m e n t F o u n d a t i o n 06/25/18 Mike Sheeks