HomeMy WebLinkAboutRieth-Riley Construction Co, Inc/Eng/CO #5/7,126.62/96th & Hazel Dell RAB – Project #16-ENG-35City of Carmel Project 16 -ENG -35 96th Street and Hazel Dell RAB CHANGE ORDER #5 With the closure of Hazel Dell, the designated detour route to 96'h Street uses westbound 106'h Street to southbound Gray Rd to return to 96`h Street. The concern is during peak hours the southbound to eastbound traffic movement that used Hazel Dell will now be using Gray Rd., producing a higher volume of traffic creating a queue at the intersection. This change order is being created to add an additional southbound left turn lane, which requires additional signal heads, signal timing adjustments, and temporary pavement markings to designate the new movement. A changeable message board is being added to provide notice to the traveling public of the new traffic pattern at the intersection. Contract Price prior to this Change Order $1,601,993.70 Contract Price will be increased/decreased by this Change Order $7,126.62 --------------------------------------------------------------------------------- New Contract Price including this Change Order $1,609,120.32 Amount Adjusted Contract Price Cumulative % Change from Original Contract Original Contract $1,588,508.79 $1,588,508.79 N/A C01— Const Chng 1 Storm Water Bond $(4,164.65) $1,584,344.14 (0.3%) CO2 — MM Add Insured General Oblig. Bond $0.00 $1,584,344.14 (0.3%) CO 3 — Const Chng 2 General Oblig. Bond $5,111.10 $1,589,455.24 0.06% CO 3 — Const Chag 2 Storm Water Bond $3,250.34 $1,592,705.58 0.3% CO 4—Temp Const. Fence and New Fence General Oblig. Bond $9,288.12 $1,601,993.70 0.85% CO 5 — Added Turn Lane at Gray Rd General Oblig. Bond $7,126.62 $1,609,120.32 1.30% CITY OF CARMEL TO: CONTRACT CHANGE ORDER NO.: 5 oc� Chris Ogg DATE: 5/22/18 One Civic Square PROJECT NAME: 16 -ENG -35 Carmel, IN 46032 CITY REQ. NO.: N/A CITY PO NO.: 100624 - General Obligation Bond CITY PO DATE: 8/2/2017 I. You are directed to make the following changes in this Contract: (Brief Description) With the closure of Hazel Dell., the designated detour route to 96'h Street uses westbound 1061 Street to southbound Gray Rd to return to 96h Street. The concern is during peak hours the southbound to eastbound traffic movement that used Hazel Dell will now be using Gray Rd., producing a higher volume of traffic creating a queue at the intersection. This change order is being created to add an additional southbound left turn lane, which requires additional signal heads, signal timing adjustments, and temporary pavement markings to designate the new movement. A changeable message board is being added to provide notice to the traveling public of the new traffic pattern at the intersection. ITEM New 107 — Relocate Signal Heads New 108 —Temp. 4" White Ln, Paint New 109 — Temp. 4" Yellow Ln. Paint New 110 — Port. Chg, Message Board New I I l — Temp. White Arrow New 112 —Temp. White ONLY SCHEDULED ADJUSTMENT AMOUNT I LS x $1,622.42 = $1,622.42 225 LFT x $3.34 = $751.50 63 LFT x $3.34 = $210.42 1.0 EA x $3,896.59 = $3,896.59 6.0 EA x $89.06 = $534.36 1.0EAx$111.33=$111.33 (+) OR ( ) DAYS 0 0 0 0 0 0 II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C. No.: N/A Other: The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 1,601,993.70 Contract Price will be increased/decreased by this Change Order $ 7,126.62 New Contract Price including this Change Order $ 1,609,120.32 Contract Time Prior to this Change Order 74 Days 12/13/17 Completion Date Net increased/decreased resulting from this Change Order 0 Days Current Contract Time including this Change Order 74 Days 12/13/17 Completion Date AR -6 Version 2016.08-31 This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are Recommended CHA ENGINEER 300 S. Meridian Street Address Indianapolis, IN 46225 City/State/Zip By: Phone: Date: 5, 12',-1 Y Version 2016-08-31 The Above Changes Are Accepted: Rieth-Riley Construction CONTRACTOR 1751 W. Minnesota Street Address Indianapolis, IN 46221 Approved: /CZ,4, zdzw�— ames Brainard, Mayor n vnnA . Al Mary Lori W City/State/Zip Jere y K shman, PE, City EatUneer By: 4AE Phone. j� Christine S. auley lerk- reasurer Date: [ Date: IETHY3 fr y p ILEY CONSTRucTioN Co., INC. s loc— 100% Quality • 100% Employee Owned • Over 100 Years LETTER OF TRANSMITTAL TO: CHA Companies DATE: 5/16/18 REV 5.21.18 300 S. Meridian St Extension EWA RELOCATE SIGNAL HEAD Indianapolis, IN 46225 PROJECT: 16 -ENG -35 9611 & Hazel Dell $1,622.42 JOB #: RR Job# 3200723 ATTN: Brian Andres RE: Temp striping and turn signal at EWA TEMPORARY 4" YELLOW LINE, PAINT 63.00 9611 / Gray We Are Sending: Submitted For: Action Taken: _...... Shop Drawings X Approval _ ......... ....................... Approved as Submitted Letter _ ......... _. _.._ ..___ Your Use Approved as Noted Prints/Plans ......... ......_......_.__._.................... As Requested Returned After Loan X Change OrderReview . and Comment _._ . _ ......... __....... Resubmit Copies Samples ' Submit Copies ......_. Specifications Sent Via: Email Returned .........._ _. __. _ Other:X Attached ...... Returned for Corrections .. ........... ___....... , Separate Cover Via: Due Date: Notes/Remarks: The following pricing is based upon the requested scope of work for temporary striping and signal changes for MOT at 96' Street and Gray Road Item Description Quantity Unit Unit Price Extension EWA RELOCATE SIGNAL HEAD 1.00 LS $1,622.42 $1,622.42 EWA TEMPORARY 4" WHITE LINE, PAINT 225.00 LF $3.34 $751.50 EWA TEMPORARY 4" YELLOW LINE, PAINT 63.00 LF $3.34 $210.42 EWA 1PORTABLE CHANGEABLE MESSAGE SIGN 1.00 1 EA 1 $3,896.591 $3,896.59 EWA TEMPORARY WHITE LANE ARROW, PAINT 6.00 1 EA 1 $89.061 $534.36 EWA ITEMPORARY WHITE LANE ARROW, PAINT 1.00 1 EA 1 $111.331 $111.33 $7,126.62 The scope of work covered by this request does not include removal of temporary signal head or striping. CC: 3200723 - Job File Eric Holmes, RR Superintendent John Tuddy, RR General Superintendent Signed: Jeff M i r. Project Manager P.O. Box 276 1751 4V Minnesota St. • Indianapolis, 1N 46206Phone: (317) 634 5561 • www.rieth-riley.com MATERIAL 109.05 (b)(3) Purchased or Manufactured Description Quantity Unit Unit Price Extenstion EXTENSION (25) $0.00 $0.00 $0.00 $0.00 $0.00 (28) $ $ Is I $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18)-(19) 10 %x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $0.00 (22) Equipment# CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE Days EXTENSION (25) $0.00 $0.00 $0.00 $0.00 $0.00 (28) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Trucking - Striaght Time $0.00 $0.00 Trucking - Over Time $0.00 $0.00 Trucking - Double Time $0.00 $0.00, TOTAL EQUIPMENT TOTAL TRUCKING FUEL, LUBRICANTS AND TRANSPORTATION COSTS TOTAL LINES (23) + (24) + (25) 10 % x LINE (26) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) SUBCONTRACTORS 109.05 (b)(6) TOTAL SUBCONTRACT WEEK ENDING 10 % x LINE (30) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) TOTAL OF WORK COMPLETED FOR THE WEEK $0.00 (23) $0.00 (24) $0.00 (25) $0.00 (26) $0.00 (27) $0.00 (28) $1,457.29 (30) $145.73 (31) $1,603.02 (33) TOTAL LINES (12), (17), (22), (28) & (33) $1,603.02 (34) fflgvNM% OF BOND RATE BASED UPON LINE (34) $17.63 (35) 10 % x LINE (35) $1.76 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $1,622.42 (37) Page 2 of 2 MATERIAL 109.05 (b)(3) Purchased or Manufactured Description Quantity Unit Unit Price Extenstion $ $ $0.00 $0.00 a $ $ $ s $ Is $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE(18)+(19) 10 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $0.00 (22) Equipment# CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE Days EXTENSION (25) $0.00 $0.00 $0.00 $0.00 $0.00 (28) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Trucking - Striaght Time $0.00 $0.00 Trucking - Over Time $0.00 $0.00 Trucking - Double Time $0.00 0.00 TOTAL EQUIPMENT TOTAL TRUCKING FUEL, LUBRICANTS AND TRANSPORTATION COSTS TOTAL LINES (23) + (24) + (25) 10 % x LINE (26) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) SUBCONTRACTORS 109.05 (bl(6) TOTAL SUBCONTRACT WEEK ENDING 10 % x LINE (30) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30)+(31) TOTAL OF WORK COMPLETED FOR THE WEEK $0.00 (23) $0.00 (24) $0.00 (25) $0.00 (26) $0.00 (27) $0.00 (28) AMOUNT $3.00 (30) $0.30 (31) $3.30 (33) TOTAL LINES (12), (17), (22), (28) 8 (33) $3.30 (34) 91111M% OF BOND RATE BASED UPON LINE (34) $0.04 (35) 10 % x LINE (35) $0.00 (36) TOTAL EXTRA WORK LINES: (34)+(35)+(36) $3.34 (37) Page 2 of 2 MATERIAL 109.05 (b)(3) Purchased or Manufactured Description Quantity Unit Unit Price Extenstion EXTENSION (25) S $ S $ S $ $ $ Is $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18)-(19) 10 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20)+ (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $0.00 (22) Equipment # CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE Days EXTENSION (25) $0.00 $0.00 $0.00 $0.00 $0.00 (28) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Trucking - Striaght Time $0.00 $0.00 Trucking - Over Time $0.00 $0.00 Trucking - Double Time $0.00 $0.00 SUBCONTRACTORS 109.05 (b)(6) TOTAL EQUIPMENT TOTAL TRUCKING FUEL, LUBRICANTS AND TRANSPORTATION COSTS TOTAL LINES (23) + (24) + (25) 10 % x LINE (26) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) $0.00 (23) $0.00 (24) $0.00 (25) $0.00 (26) $0.00 (27) $0.00 (28) DESCRIPTION AMOUNT ITS 4" yellowpaint) $3.00 TOTAL SUBCONTRACT WEEK ENDING $3.00 (30) 10%x LINE (30) $0.30 (31) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) $3.30 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) & (33) $3.30 (34) % OF BOND RATE BASED UPON LINE (34) $0.04 (35) 10 % x LINE (35) $0.00 (36) TOTAL EXTRA WORK LINES: (34) + (35) +(36) $3.34 (37) Page 2of2 MATERIAL 109.05 (b)(3) Purchased or Manufactured Description Quantity Unit Unit Price Extenstion $ $ S $ S $ S $ s $ s $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE(18)+(19) 10 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $0.00 (22) Equipment# CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE Days EXTENSION (25) $0.00 $0.00 $0.00 $0.00 $0.00 (28) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Trucking - SViaght Time $0.00 $0.00 Trucking - Over Time $0.00 $0.00 Trucking - Double Time $0.00 $0.00 TOTAL EQUIPMENT TOTAL TRUCKING FUEL, LUBRICANTS AND TRANSPORTATION COSTS TOTAL LINES (23) + (24) + (25) 10 % x LINE (26) GRAND TOTAL FOR EQUIPMENT: LINES (26)+(27) SUBCONTRACTORS 109.05 (b)(6) TOTAL SUBCONTRACT WEEK ENDING 10 % x LINE (30) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) + (31) TOTAL OF WORK COMPLETED FOR THE WEEK $0.00 (23) $0.00 (24) $0.00 (25) $0.00 (26) $0.00 (27) $0.00 (28) AMOUNT $3,500.00 (30) $350.00 (31) $3,850.00 (33) TOTAL LINES (12), (17), (22), (28) 8 (33) $3,850.00 (34) % OF BOND RATE BASED UPON LINE (34) $42.35 (35) 10 % x LINE (35) $4.24 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $3,896.59 (37) Page 2 of 2 MATERIAL 109.05 (b)(3) Purchased or Manufactured Description Quantity Unit Unit Price Extenstion S $ S $ s $ s $ $ $ Is $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE(18)+(19) 10 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $0.00 (22) Equipment # CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE Days EXTENSION (25) $0.00 $0.00 $0.00 $0.00 $0.00 (28) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Trucking - Striaght Time $0.00 $0.00 Trucking - Over Time $0.00 $0.00 Trucking - Double Time $0.00 0.00 TOTAL EQUIPMENT TOTAL TRUCKING FUEL, LUBRICANTS AND TRANSPORTATION COSTS TOTAL LINES (23) + (24) + (25) 10 % x LINE (26) GRAND TOTAL FOR EQUIPMENT: LINES (26)+(27) SUBCONTRACTORS 109.05 (b)(61 $0.00 (23) $0.00 (24) $0.00 (25) $0.00 (26) $0.00 (27) $0.00 (28) DESCRIPTION AMOUNT ITS(painted lane arrow $80.00 TOTAL SUBCONTRACT WEEK ENDING $80.00 (30) 10%x LINE (30) $8.00 (31) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30) +(31) $88.00 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) 8 (33) $88.00 (34) IffaffilM% OF BOND RATE BASED UPON LINE (34) $0.97 (35) 10 % x LINE (35) $0.10 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $89.06 (37) Page 2 of 2 MATERIAL 109.05 (b)(3) Purchased or Manufactured Description Quantity Unit Unit Price Extenstion EXTENSION (25) a $ $ $ $ $ $ $ Is $ MATERIALS PURCHASED MATERIALS MANUFACTURED TOTAL: LINE (18)-(19) 10 % x LINE (20) GRAND TOTAL FOR MATERIALS: LINE (20) + (21) EQUIPMENT 109.05 (b)(4) $0.00 (18) $0.00 (19) $0.00 (20) $0.00 (21) $0.00 (22) Equipment# CONTRACTOR OWNED EQUIPMENT FHWA HOURLY RATE Days EXTENSION (25) $0.00 $0.00 $0.00 $0.00 $0.00 (28) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Trucking - Striaght Time $0.00 Trucking - Over Time $0.00 $0.00 Trucking - Double Time $0.00 $0.00 TOTAL EQUIPMENT TOTAL TRUCKING FUEL, LUBRICANTS AND TRANSPORTATION COSTS TOTAL LINES (23) + (24) + (25) 10 % x LINE (26) GRAND TOTAL FOR EQUIPMENT: LINES (26) + (27) SUBCONTRACTORS 109.05 (b)(61 $0.00 (23) $0.00 (24) $0.00 (25) $0.00 (26) $0.00 (27) $0.00 (28) AMOUNT 100 TOTAL SUBCONTRACT WEEK ENDING $100.00 (30) 10%x LINE (30) $10.00 (31) GRAND TOTAL FOR SUBCONTRACTORS: LINES (30)+(31) $110.00 (33) TOTAL OF WORK COMPLETED FOR THE WEEK TOTAL LINES (12), (17), (22), (28) & (33) $110.00 (34) % OF BOND RATE BASED UPON LINE (34) $1.21 (35) 10%xLINE (35) $0.12 (36) TOTAL EXTRA WORK LINES: (34) + (35) + (36) $111.33 (37) Page 2 of 2 .. S Indiana Traffic Services, LLC 3867 North Commercial Parkway Office Number: Greenfield, Indiana 46140 Fax Number: 317-891-8065 317-891-8248 CHANGE ORDER Certified DBE: State of Indiana Certified WBE: City of Indianapolis Date: 5/11/2018 Submitted by: Larry Hodson Contract: 16 -ENG -35 e-mail: LarryH(a)lndianatrafficservices.com Location: 96TH AND HAZEL DELL Cell Number: 317-696-8603 Countv: HAMILTON Office NumhP.r 317-891-8065 Item Item Number Description Estimated Quantities Unit of Measure Unit Cost Extended Amount EWA-1-1 TPM REMOVEABLE D.W. 4 IN 225.00 LF $ 3.00 $ 675.00 EWA-1-2 TPM REMOVABLE D.Y. 4 IN 63.00 LF $ 3.00 $ 189.00 EWA-1-3 PORTABLE CHANGEABLE MESSAGE SIGN 1.00 EA $ 3,500.00 $ 3,500.00 EWA-1-4 TPMM REMOVABLE L.I. ARROW 6.00 EA $ 100.00 $ 600.00 EWA-1-5 TPMM REMOVABLE WORD ONLY 1.00 EA $ 150.00 $ 150.00 Total Quotel $ 5,114.00 A. Customer to ACKNOWLEDGE CHANGE ORDER requests as received. If Owner DOES NOT pay for requested work through change order, Customer assumes the responsibility for payment. B. ITS WILL SCHEDULE AND COMPLETE THE CHANGE ORDER WORK AFTER WE RECEIVE A SIGNED COPY CHANGE ORDER FROM THE OWNER. We are an Equal Opi)ortunitym o er Accepted By: Date Accepted: Accepted For: Memo To: Doug Haney, Corporation Counsel From: Lisa Scott CC: Jeremy Kashman Date: 06/04/18 Re: C.O. #5 96th & Hazel Dell Project #16 -ENG -35 Doug, please find attached 1 original of same change order for project #16 -ENG -35 for 9e & Hazel Dell. Please review & initial for the next BPW Meeting. Change Order #5- Original Contract Amount: $1,588,508.79 Increase: $7,126.62 New Contract Amount $1,609,120.32 Thank you, Lisa Scott 0 Page 1