HomeMy WebLinkAbout40O
OFFICE 4
143
SD -2— — 5
150 CFM '
TO RTU -6
OFFICE
144
F G
(T 1/8" = 11-01,
Mechanical First Floor HVAC Plan
NN
M2.1 CONSTRUCTION NOTES
PIPING NOTES AND INSTRUCTIONS. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. DELETE
1 ROUTE STEAM FROM HUMIDIFIERS TO DUCT AT THIS LOCATION. SEE SHEET P2.1 FOR ADDITIONAL STEAM LINER 10' AFTER HUMIDIFIER, REPLACE WITH DUCT WRAP. DUCT
2 HUMIDIFIER UNIT LOCATIONS, SEE P2.1 FOR INSTRUCTIONS. HUMIDISTATS SHALL BE LOCATED IN
CORRESPONDING RTU RETURN DUCTWORK.
3 GRAVITY RELIEF CAP ON ROOF ABOVE. SEE SHEET M2.2.
4 BASEBOARD ELECTRIC HEATERS BY E.C., SEE ELECTRICAL DRAWINGS.
5 THERMOSTATS SHALL BE AVERAGED BETWEEN THE TWO SPACES SHOWN.
6 DUCT UP TO ROOF, TRANSITION TO 16x16 CONNECTION TO UNIT (SUPPLY AND RETURN). VERIFY WITH
EQUIPMENT MANUFACTURER.
7 CENTER DIFFUSER ON WALL BETWEEN COLUMNS.
MSKTD
& Associates, Inc.
ARCHITECTURE ENGINEERING INTERIOR DESIGN
1715 MAGNAVOX WAY 930 NORTH MERIDIAN
FORT WAYNE, IN 46804 INDIANAPOLIS, IN 46204
voice 260.432.9337 voice 317.917.1190
fax 260.436.2402 fax 317.822.6236
http://www.msktd.com
CERTIFICATION
D :NSC
G\STERFO V*
•No. 3/
_ * 890360 * s
' STATE OF
�SS70N00000
A006•��,`�``\`,
The concepts, ideas, designs, plans, and details as
shown on this document are the sole property of
MSKTD & Associates, Inc., and were created,
developed and presented for use on this specific
project. None of the concepts, ideas, designs, plans,
and details shall be used by any person, firm, or
corporation for any purpose whatsoever, without the
expressed written consent of MSKTD & Associates,
Inc. The Owner shall be permitted to retain copies
for information and reference in connection with this
project.
Revisions: Date: By:
SHEET TITLE
Mechanical HVAC
I1
'loor Plan
COMMISSION NUMBER DATE
MSKTD 5629 2-11-11
BUILD 65076
SHEET NUMBER
M2,01