HomeMy WebLinkAbout41Mechanical Roof HVAC Plan.
N
0
N
r
M2.2 CONSTRUCTION NOTES
1 FURNISH AND INSTALL GAS PRESSURE REGULATORS AT EACH UNIT.
2 CONDENSATE SHALL DRAIN TO ROOF. SEE CONDENSATE TRAP DETAIL SHEET M5.1.
3 PAINT GAS PIPING ON ROOF WITH TWO COATS OF BLACK RUSTOLEUM PAINT. SUPPORT GAS
PIPING ON 4' CENTERS WITH PIPE SUPPORT, SEE DETAIL SHEET M5.1.
4 SET CONDENSING UNIT ON EQUIPMENT CURB (PATE, MODEL ES -5). ROUTE REFRIGERANT LINES,
SIZE AND SLOPE PER MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS.
5 USE PATE "PIPE SEAL" AT ROOF PENETRATION. SEE DETAIL SHEET M5.1.
MSKTD
& Associates, Inc.
ARCHITECTURE ENGINEERING INTERIOR DESIGN
1715 MAGNAVOX WAY 930 NORTH MERIDIAN
FORT WAYNE, IN 46804 INDIANAPOLIS, IN 46204
voice 260.432.9337 voice 317.917.1190
fax 260.436.2402 fax 317.822.6236
http://www.msktd.com
CERTIFICATION
\�����\\\\\1111111111
�.\ `\� D.
G\ S *6. ��
�%
s * ' 890360
STATE OF
��.C` '•. IND I ANP .•• �Or �
•••'•00.0•••0
The concepts, ideas, designs, plans, and details as
shown on this document are the sole property of
MSKTD & Associates, Inc., and were created,
developed and presented for use on this specific
project. None of the concepts, ideas, designs, plans,
and details shall be used by any person, firm, or
corporation for any purpose whatsoever, without the
expressed written consent of MSKTD & Associates,
Inc. The Owner shall be permitted to retain copies
for information and reference in connection with this
project.
Revisions: Date: By:
SHEET TITLE
Mechanical HVAC
Roof Plan
COMMISSION NUMBER DATE
MSKTD 5629 2-11-11
BUILD 65076
SHEET NUMBER