Loading...
HomeMy WebLinkAbout42c t L 0 v V V General Mechanical Specifications: ALL WORK SHALL CONFORM TO ALL APPLICABLE STATE, LOCAL, AND NATIONAL CODES. ALL WORK SHALL BE IN ACCORDANCE WITH CITY OF CARMEL BUILDING CODES. PROVIDE TESTS AND ARRANGE INSPECTIONS AS REQUIRED. THE CODE SHALL BE FOLLOWED AT A MINIMUM. PROVIDE HIGHER GRADES OF MATERIAL AND WORKMANSHIP WHERE REQUIRED. THIS CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS REQUIRED BY THE AUTHORITIES HAVING JURISDICTION. ANY PRODUCT MANUFACTURER NOT LISTED ON THE DRAWINGS BUT WISHING TO BID MUST BE SUBMITTED TO ENGINEER FOR APPROVAL NOT LESS THAN 7 DAYS PRIOR TO BID DATE. SUBMIT SHOP DRAWINGS FOR APPROVAL PRIOR TO FABRICATION PURCHASE AND/OR INSTALLATION. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING DIFFUSER LOCATIONS WITH ARCHITECT'S REFLECTED CEILING PLANS. DIFFUSER LOCATIONS ON SHOP DRAWINGS ARE SUBJECT TO APPROVAL BY THE ARCHITECT. SUBMIT FOR APPROVAL PRODUCT DATA FOR ALL EQUIPMENT LISTED ON THE MECHANICAL SCHEDULE SHEET, AND FOR DUCT AND PIPE INSULATION, VALVES, FIRE -STOPPING AND FIRE DAMPERS. SUBMITTALS TO INCLUDE RATED CAPACITIES, FURNISHED SPECIALITIES, WIRING DIAGRAMS, ACCESSORIES, CERTIFIED FAN -PERFORMANCE CURVES, CERTIFIED PUMP - PERFORMANCE CURVES, AS PERTAINS TO THAT PIECE OF EQUIPMENT. DRAWINGS (PLANS, SCHEMATICS, AND DIAGRAMS) INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING, DUCTWORK, AND EQUIPMENT. THE LOCATION AND ARRANGEMENT TAKE INTO CONSIDERATION PIPE SIZING AND FRICTION LOSS, EXPANSION, AND OTHER DESIGN PARAMETERS. CLEARANCES ABOVE CEILINGS IN CERTAIN AREAS ARE LIMITED AND MAY NECESSITATE ALTERNATE DUCTWORK AND/OR PIPING ROUTINGS. WHERE POSSIBLE, PIPING, DUCTWORK, AND EQUIPMENT SHALL BE INSTALLED AS INDICATED. CHANGES REQUIRED TO MEET ARCHITECTURAL AND STRUCTURAL CONDITIONS ARE TO BE APPROVED BY THE ENGINEER. THE DRAWINGS AND SPECIFICATIONS ARE NOT INTENDED TO SHOW ALL DETAILS. THE CONTRACTOR SHALL SECURE SATISFACTORY INFORMATION BEFORE SUBMITTING THEIR BID PROPOSAL AND INCLUDE IN THE PROPOSAL A SUM SUFFICIENT TO COVER ALL ITEMS OF LABOR AND MATERIAL REQUIRED FOR THE COMPLETE INSTALLATION OF THE DEVICES AND SYSTEM DESCRIBED. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH THAT OF ALL OTHER TRADES PRIOR TO FABRICATION AND INSTALLATION. ROOF PENETRATIONS REQUIRE COORDINATION WITH GENERAL CONTRACTOR. APPROVE PENETRATION, FLASHING MATERIALS, AND CURBS WITH ROOFING CONTRACTOR RESPONSIBLE FOR ROOF WARRANTY, PRIOR TO INSTALLATION OF PENETRATIONS. M.C. IS RESPONSIBLE FOR ALL SUPPLEMENTAL STEEL REQUIRED TO SUPPORT EQUIPMENT CURBS. ALL ROOFTOP MOUNTED EQUIPMENT SHALL BE INSTALLED LEVEL, PLUMB, AND FIRMLY ANCHORED IN LOCATIONS INDICATED. OBSERVE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND RECOGNIZED INDUSTRY PRACTICES TO INSURE THAT PRODUCTS SERVE THEIR INTENDED FUNCTION ROOFTOP AIR HANDLING UNITS SHALL BE MANUFACTURED BY TRANE, YORK OR CARRIER. ALL SHEET METAL DUCTWORK SHALL BE G-60 COATED GALVANIZED STEEL CONFORMING TO ASTM A653 AND A924 STANDARDS OF GAUGE AND REINFORCEMENT COMPLYING WITH CURRENT ADDITIONS OF SMACNA STANDARDS. DUCTWORK SHALL BE AIRTIGHT (5% LEAKAGE). ALL TRANSVERSE JOINTS AND LONGITUDINAL SEAMS SHALL BE SEALED. FABRICATE ELBOWS WITH CENTERLINE RADIUS EQUAL TO 1.5 TIMES THE DUCT WIDTH IN THE PLANE OF THE TURN; AND FABRICATE TO INCLUDE FACTORY MANUFACTURED TURNING VANES IN ELBOWS WHERE SHORTER RADIUS IS NECESSARY. LIMIT ANGULAR TAPERS TO 30 DEGREES AND 20 DEGREES FOR EXPANDING TAPERS, MAXIMUM STRAIGHT LENGTH OF FLEX DUCT SHALL BE 4 FEET. FLEXIBLE DUCT SHALL NOT BE USED IN PLACE OF ELBOWS. TAKE -OFFS SHALL NOT BE PLACED CLOSER THAN 12" FROM THE END OF A TRUNK OR LESS THAN 24" DOWNSTREAM FROM AN ELBOW. PROVIDE AND INSTALL DUCT TRANSITIONS TO ALL TERMINAL DEVICES FOR CONNECTIONS TO EITHER SIDE AS REQUIRED. SEE PLANS FOR DUCT SIZES AND REFER TO TERMINAL UNIT SCHEDULE FOR RECOMMENDED INLET AND OUTLET SIZE. MANUAL VOLUME DAMPERS ARE TO BE PROVIDED IN ALL DUCT RUN OUTS FOR SUPPLY DIFFUSERS AND EXHAUST GRILLES. PROVIDE SQUARE -TO -ROUND AND ROUND -TO - ROUND DUCT TRANSITIONS AT SUPPLY DIFFUSERS AS REQUIRED FOR PROPER CONNECTION. DUCT LAYOUT IS DIAGRAMATIC IN NATURE. ADJUST TO FIELD CONDITIONS. ADD OFFSETS WHERE NEEDED. ALL RECTANGULAR SUPPLY DUCT SHALL BE LINED WITH 1/2" LINER. LAMINATE LINER TO INTERNAL SURFACES IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. DUCT DIMENSIONS ARE "FREE AREA" AND SHALL NOT BE REDUCED. ALL ROUND SUPPLY AIR DUCT SHALL BE WRAPPED EXTERNALLY WITH 1 1/2" THICK FLEXIBLE FIBERGLASS INSULATION. EXHAUST DUCT NEED NOT BE INSULATED OR LINED EXCEPT TO PROVIDE LINING FOR 5 FT. UPSTREAM OF EXHAUST FAN FOR ACOUSTICAL REASONS.NO DUCT LINER SHALL BE INSTALLED 10 FT. DOWNSTREAM OF HUMIDIFIER MANIFOLDS. ALL ROUND DUCTWORK SHALL BE EXTERNALLY INSULATED. THIS INSULATION SHALL ACHIEVE A 25/50 FLAME -SPREAD AND SMOKE -DEVELOPED RATING IN ACCORDANCE WITH NFPA 255. THE SMOKE DEVELOPMENT RATING FOR PIPE INSULATION SHALL NOT EXCEED 150. INSTALL INSULATION PRODUCTS ON SPECIFIED DUCTWORK, PIPING, AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES TO INSURE THAT THE INSULATION SERVES ITS INTENDED PURPOSE, MATERIALS EXPOSED WITHIN DUCTS OR PLENUMS SHALL HAVE A FLAME -SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE -DEVELOPED RATING OF NOT MORE THAN 50 IN ACCORDANCE WITH SECTION 102 (A), IMC (675 IAC 18-1). ANY PLASTIC PIPING, ROUTED IN SUCH LOCATION SHALL BE COVERED WITH INSULATION AS REQUIRED TO COMPLY WITH ABOVE INDICATED FLAME -SPREAD AND SMOKE -DEVELOPED RATING. AIR SMOKE DETECTORS FOR AIR HANDLING UNIT SHUTDOWN AND FOR SMOKE DAMPER CONTROL WILL BE PROVIDED AS PART OF THE FIRE ALARM SYSTEM. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING THE DETECTORS AND FOR PREPARING THE DUCTWORK FOR MOUNTING THE DETECTORS. CONTRACTOR SHALL INSTALL CONSTRUCTION FILTERS ON ALL AIR DISTRIBUTION EQUIPMENT SERVING NEW TO INSURE THAT COILS AND INTERNAL COMPONENTS ARE PROTECTED. BY COMPLETION OF THE PROJECT THE M.C. SHALL REPLACE CONSTRUCTION FILTERS WITH NEW FILTERS. ALL BACKDRAFT DAMPERS SHALL BE RUSKIN MODEL CBD4 OR PRE -APPROVED EQUAL. THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL TEMPERATURE CONTROL WIRING, THERMOSTATS, RELAYS, AND INTERLOCKS ETC. AS REQUIRED. 112" FIBERGLASS DUCT LINER N NU I It: bUU I I U tat JILCU 1 u IVIM 1 lir/ RETURN GRILLE DIMENSIONS. INSTALL PLASTIC PIPE MARKERS ON ALL PIPING, AND INCLUDE ARROWS TO SHOW NORMAL DIRECTION OF FLOW. PROVIDE A VALVE TAG ON EVERY VALVE, COCK AND CONTROL DEVICE IN EACH PIPING SYSTEM. EXCLUDE CHECK VALVES, VALVES FROM FACTORY -FABRICATED EQUIPMENT UNITS, PLUMBING FIXTURE FAUCETS, HOSE -BIBS, HVAC TERMINAL DEVICES, AND SIMILAR ROUGH -IN CONNECTIONS OF END-USE FIXTURES AND UNITS. ALL ABOVE GRADE CONDENSATE DRAIN PIPING SHALL BE COVERED WITH 1/2" PRE -FORMED ELASTOMERIC FOAM INSULATION. ALL CONNECTIONS BETWEEN DISSIMILAR PIPING MATERIAL SHALL BE MADE WITH "EPCO" FITTINGS TO PREVENT GALVANIC ACTION. INSTALL CHROME -PLATED PIPE ESCUTCHEONS ON EACH PIPE PENETRATION THROUGH FLOORS, WALLS, PARTITIONS, AND CEILINGS WHERE PENETRATION IS EXPOSED TO VIEW. INSTALL HANGERS, SUPPORTS, CLAMPS AND ATTACHMENTS TO SUPPORT PIPING PROPERLY FROM BUILDING STRUCTURE. ARRANGE FOR GROUPING OF PARALLEL RUNS OF HORIZONTAL PIPING TO BE SUPPORTED TOGETHER ON TRAPEZE HANGERS WHERE POSSIBLE. ALL PIPING HANGER AND SUPPORTS SHALL BE UL OR FM APPROVED. UNIONS AND VALVES SHALL BE PROVIDED AT CONNECTIONS TO ALL EQUIPMENT. INSTALL VALVES WHERE REQUIRED FOR PROPER OPERATION OF PIPING AND ISOLATION OF EACH PIECE OF EQUIPMENT. IN ADDITION INSTALL SECTIONAL VALVES ON EACH BRANCH AND RISER, CLOSE TO MAIN, AND WHERE BRANCH OR RISER SERVES TWO OR MORE PIECES OF MECHANICAL EQUIPMENT OR FIXTURES. LOCATE VALVES SO AS TO BE ACCESSIBLE AND SO THAT SEPARATE SUPPORT CAN BE PROVIDED WHEN NECESSARY. INSTALL VALVES WITH STEMS POINTED UP IN VERTICAL POSITION WHERE POSSIBLE, BUT IN NO CASE WITH STEMS POINTED DOWNWARD FROM HORIZONTAL PLANE. WHERE INSULATION IS INDICATED, INSTALL EXTENDED STEM VALVES, ARRANGED IN PROPER MANNER TO RECEIVE INSULATION. REFRIGERANT PIPING SHALL BE TYPE ACR DRAWN COPPER TUBING WITH WROUGHT COPPER FITTINGS AND BRAZED JOINTS ABOVE GROUND WITHIN BUILDING. USE TYPE K, ANNEALED TEMPER COPPER TUBING FOR 2 INCH AND SMALLER WITHOUT JOINTS BELOW GROUND AND WITHIN SLABS. MECHANICAL FITTINGS (CRIMP OR FLAIR) ARE NOT PERMITTED. REFRIGERANT SUCTION LINES SHALL BE INSULATED WITH 1 INCH ELASTOMERIC INSULATION. ANY INSULATION LOCATED OUTSIDE SHALL BE COVERED WITH 2 COATS OF ULTRAVIOLET RESISTANT PAINT. HANGING OF PIPING SHALL BE ON NOT MORE THAN 10'-0" CENTERS WITH 3/8" RODS. ACCEPTABLE MANUFACTURERS FOR AIR GRILLES INCLUDE: CARNES; HART & COOLEY; KRUEGER INDUSTRIES; PRICE; TITUS; TUTTLE & BAILEY. VOLTAGE FOR ALL EQUIPMENT IS TO BE VERIFIED BY THE MECHANICAL CONTRACTOR. ALL FINAL POWER (LINE VOLTAGE) WIRING OF ALL EQUIPMENT WILL BE EXECUTED BY THE ELECTRICAL CONTRACTOR. ALL THERMOSTATS SHALL BE MOUNTED NEAR DOORS OR CORNERS OF WALLS UNLESS SHOWN OTHERWISE. ALL THERMOSTATS TO BE MOUNTED AT 48" A.F.F. COMPLY WITH MANUFACTURER'S WRITTEN INSTRUCTIONS FOR INSTALLATION OF VIBRATION CONTROL ON ALL MECHANICAL EQUIPMENT. ADJUST TO ENSURE THAT UNITS HAVE EQUAL DEFLECTION, DO NOT BOTTOM OUT UNDER LOADING, AND ARE NOT SHORT-CIRCUITED BY OTHER CONTACTS OR BEARING POINTS. A COMPLETE AIR TEST AND BALANCE SHALL BE PERFORMED IN COMPLETE ACCORDANCE WITH NEBB OR AABC NATIONAL STANDARDS FOR FIELD MEASUREMENTS AND INSTRUMENTATION. MECHANICAL CONTRACTOR SHALL CHANGE BELTS AND SHEAVES ON AIR HANDLING EQUIPMENT AS DIRECTED BY BALANCING CONTRACTOR, IF REQUIRED, TO ACHIEVE DESIGN PARAMETERS WITH NO EXTRA COST TO THE OWNER. THE CONTRACTOR SHALL PROVIDE A COMPETENT OPERATING TECHNICIAN TO INSTRUCT THE OWNER IN THE OPERATION AND MAINTENANCE REQUIREMENTS OF THE INSTALLED EQUIPMENT. THE CONTRACTOR SHALL ASSEMBLE AND SUBMIT THREE COPIES OF PRINTED INSTRUCTIONS, INCLUDING EQUIPMENT CUTS AND WIRING DIAGRAMS FOR THE OPERATION AND MAINTENANCE OF EACH ITEM OF INSTALLED EQUIPMENT. THE CONTRACTOR SHALL GUARANTEE ALL WORK AND MATERIALS FOR ONE YEAR AFTER DATE OF ACCEPTANCE AGAINST ALL DEFECTS OF MATERIALS, EQUIPMENT AND WORKMANSHIP. INSTALL ENGRAVED PLASTIC LAMINATE SIGN OR PLASTIC EQUIPMENT MARKER ON OR NEAR EACH MAJOR ITEM OF MECHANICAL EQUIPMENT. DURING CONSTRUCTION, WHEN ROOFTOP UNITS ARE OPERATING, INSTALL MERV-8 FILTERS. JUST PRIOR TO OCCUPANCY, INSTALL MERV-13 FILTERS. AFTER THE FLUSH OUT PERIOD, INSTALL NEW MERV-13 FILTERS FOR EACH UNIT, SEE SPECIFICATIONS FOR FLUSHOUT PROCEDURE. FOR LEED REQUIREMENTS AND COMMISSIONING DETAILS, SEE SPECIFICATIONS. Sequence of O-Derations PACKAGED ROOFTOP UNITS UNITS SHALL BE CONTROLLED THERMOSTATICALLY, (1) PER ZONE (EXCEPTION: RTU -3 HAS (2) THERMOSTATS WHICH SHALL BE AVERAGED). EACH THERMOSTAT SHALL HAVE AN OCCUPANCY OVERRIDE - 3 HOUR INTERVAL. OCCUPIED COOLING: CONSTANT SPEED FAN SHALL RUN CONTINUOUSLY WITH CYCLING DX COMPRESSOR TO SATISFY SETPOINT. COMPRESSOR SHALL HAVE ANTI -SHORT CYCLE TIMER. UNIT SHALL BE SET FOR MINIMUM VENTILATION REQUIREMENT. WHEN CONDITIONS ARE MET, UNIT SHALL GO TO 100% ECONOMIZER AND POWERED EXHAUST SHALL ENERGIZE. HEATING SHALL BE DISABLED. OCCUPIED HEATING: THE GAS HEAT SHALL CYCLE BETWEEN STAGES TO SATISFY HEATING SETPOINT. COOLING SHALL BE DISABLED. UNOCCUPIED COOLING/HEATING: UNIT FAN AND COILS SHALL CYCLE AS REQUIRED TO SATISFY REDUCED SETPOINT. ECONOMIZER DISABLED. HUMIDIFIERS UNITS SHALL MODULATE AS REQUIRED TO MAINTAIN A MINIMUM 30% RELATIVE HUMIDITY IN THE SPACES SERVED, AS MEASURED BY HUMIDISTAT LOCATED IN RETURN AIR OF TO EACH RTU. EXHAUST FAN EXHAUST FAN SHALL RUN CONTINUOUSLY DURING EXTENDED OCCUPIED HOURS, "OFF" DURING UNOCCUPIED HOURS. EXHAUST FAN OCCUPANCY HOURS SCHEDULE IS SET AT THE LIGHTING PANEL (BY E.C.). BASEBOARD HEATERS UNITS SHALL CYCLE AS REQUIRED TO MEET SETPOINT, AS SET BY LOCAL THERMOSTAT. UNITS ARE INTERLOCKED WITH ROOM THERMOSTAT SUCH THAT UNIT CANNOT BE ENERGIZED FOR HEATING IF CORRESPONDING RTU IS IN COOLING MODE. ELECTRIC HEATER -VESTIBULE UNIT SHALL CYCLE AS REQUIRED TO MEET SETPOINT VIA LOCAL THERMOSTAT. ELECTRIC WATER HEATER OCCUPIED: UNIT SHALL MAINTAIN A DOMESTIC HOT WATER TEMPERATURE OF 120 DEG F. A HOT WATER RETURN RECIRCULATING PUMP SHALL RUN CONTINUOUSLY AND SHALL SHUTOFF IF WATER HEATER HEATING COILS ARE DE -ENERGIZED FOR 5 MINUTES. PUMP SHALL RESTART WHEN COILS ARE ENERGIZED. UNOCCUPIED: RECIRCULATING PUMP SHALL BE "OFF". ALTERNATE M1 BUILDING AUTOMATION CONTROLLER A. CONTROLLER SHALL ACCEPT MONITORING INPUTS FROM PACKAGED ROOFTOP UNITS, RTU AIRFLOW MONITORS, EXHAUST FAN, HUMIDIFIERS, AND FAN COIL UNIT. CONTROLLER SHALL HAVE AN ONBOARD GRAPHIC OUTPUT AND REMOTE ACCESS MONITORING CAPABILITY. B. CONTROLLER SHALL MONITOR OUTDOOR AIR DELIVERY. WHEN OUTDOOR AIR INTAKE IS 15% UNDER MINIMUM VENTILATION REQUIREMENT, AN ALARM DISPLAY AND SOUND SHALL BE GIVEN. C. WHEN THE CO2 SENSOR MEASURES ABOVE SPACE CO2 LIMIT, THE CONTROLLER SHALL SIGNAL THE CORRESPONDING RTU TO OVERRIDE AND ECONOMIZE TO 100% UNTIL THE SENSOR SIGNALS THAT THE SPACE CO2 THRESHOLD IS MET. D. EXHAUST FAN SCHEDULE/CONTROL SHALL BE SWITCH FROM THE LIGHTING CONTROLLER TO THIS CONTROLLER. Return Grille and Sound Boot Detail. ROUND TO ROUND 10" AND LARGER RECTANGULAR DUCT RECTANGULAR TO RECTANGULAR RECTANGULAR DUCT RECTANGULAR TO ROUND 8" AND LESS ROUND TO ROUND 8" AND SMALLER RECTANGULAR DUCT RECTANGULAR TO ROUND 10" AND LARGER Typical Duct Take Off Detail. Mechanical Schedule FCU -1 DUCTLESS SPLIT SYSTEM - SERVER ROOM A. MITSUBISHI ELECTRIC MODEL #MS-A09WA "MR. SLIM" INDOOR DUCTLESS AIR CONDITIONER. 9,500 BTU/HR, SEER 13.0,115V, 1.2 MCA, 15A BREAKER, B. MU-A09WA OUTDOOR CONDENSING UNIT. SINGLE ROTARY COMPRESSOR, 14A MCA, R410A REFRIGERANT, LOW AMBIENT CONTROLLER (0 DEGREES). C. WIRELESS WALL -MOUNTED REMOTE CONTROLLER. UH -1 CEILING -RECESSED UNIT HEATER - ENTRANCE VESTIBULE A. REZNOR MODEL #ECR, SIZE "2", 2 KW, 450 CFM, 208 V, T -STAT B. SUPPORT WITH RUBBER/SPRING ISOLATORS. GI GR -2, GI GRAVITY RELIEF HOOD A. COOK MODEL 20 -PR. 1,500 CFM AT 0.05" SP. B. FURNISH WITH CURB AND BIRDSCREEN. C. COUNTER -BALANCED BACKDRAFT DAMPER. D. PROVIDE SHEET METAL DRIP PAN UNDERNEATH UNIT. Alternate M I 45° TAKEOFF Mechanical EnOneeriniz S ACCU AIR COOLED CONDENSING UNIT A.F.F. ABOVE FINISHED FLOOR AHU- AIR HANDLER UNIT ATV AIR TUNING VANE BDD BACK DRAFT DAMPER CAL- COMBUSTION AIR LOUVER CH- CABINET HEATER EAL- EXHAUST AIR LOUVER EAT ENTERING AIR TEMPERATURE EAV- EXHAUST AIR VENTILATOR EDB ENTERING DRY BULB EF- EXHAUST FAN EG- EXHAUST GRILLE ESP EXTERNAL STATIC PRESSURE EWB ENTERING WET BULB FCU FAN COIL UNIT FD FIRE DAMPER FTR FINNED TUBE RADIATION GPM GALLONS PER MINUTE HP HEAT PUMP HVAC- HTG, VENT, & AC UNIT L- LOUVER LAT LEAVING AIR TEMP LDB LEAVING DRY BULB LWB LEAVING WET BULB MAT MIXED AIR TEMP MD MANUAL DAMPER MOD MOTOR OPERATED DAMPER MUA MAKE-UP AIR UNIT CAD OUTSIDE AIR DAMPER OAI OUTSIDE AIR INTAKE CAL OUTSIDE AIR LOUVER RAD- RELIEF AIR DAMPER RAL- RELIEF AIR LOUVER RHP RADIANT HEATING PANEL RTU- ROOFTOP UNIT RV RELIEF VENT SD SPLITTER DAMPER SF SUPPLY FAN SFD SMOKE FIRE DAMPER TB- TERMINAL BOX TG- TRANSFER GRILLE TSP TOTAL STATIC PRESSURE UH- UNIT HEATER VAV- VARIABLE AIR VOLUME BOX OS SENSOR ❑S SWITCH T- THERMOMETER Q THERMOMETER TOTAL CFM CONNECT NEW TO EXISTING O HUMIDISTAT TO THERMOSTAT TOG THERMOSTAT W/ GUARD (DA ASPIRATING THERMOSTAT -HWS F O SMOKE DETECTOR PO PRESSURE SENSOR NOTE: SOME SYMBOLS MAY NOT BE USED bols 1. FURNISH WITH POWERED -EXHAUST OPTION. 2. FURNISH WITH MERV-13 FILTERS. 3. FURNISH WITH MANUFACTURER -PROVIDED PROGRAMMABLE THERMOSTAT. 4. SEPERATE DISCONNECT BY E.C. 1. FURNISH AND INSTALL OUTDOOR AIR MONITORING (FLOW MEASURING DEVICE AT EACH RTU WITH SIGNAL OUTPUT FOR ALARM, SEE SEQUENCE OF OPERATIONS, 2. FURNISH AND INSTALL BUILDING AUTOMATED CONTROLLER FOR MONITORING, SCHEDULING, AND CONTROLLING OF HVAC EQUIPMENT. SEE SEQUENCE OF OPERATIONS. 3. FURNISH AND INSTALL CO2 SENSORS IN CONFERENCE ROOM 112, CONFERENCE ROOM 140, AND PUBLIC MEETING ROOM 106. SEE SEQUENCE OF OPERATIONS. AFM: OUTDOOR AIRFLOW MONITOR A. EBTRON, ADVANTAGE GOLD MODEL GTX-116-PC B. INSTALL IN 12" SHEET METAL SLEEVE BETWEEN RTU AND RTU OUTSIDE INTAKE HOOD. C. OUTPUT: 0-10 V, INPUT: 24 V. IF BRANCH DUCT IS LARGER THAN INLET TO DIFFUSER, PROVIDE TRANSITION AT THIS POINT RIGID DUCT ELBOW CENTER LINE RADIUS = 1.5 NECK DIA. 4'-0" MAX. FLEXIBLE DUCT ACOUSTICAL CEILING DIFFUSER Diffuser/Duct Connection Detail. wuw� �cr cn41 crur-n111 F TAG VOLUME DAMPER MODEL VERTICAL FIRE DAMPER -� BACK WATER VALVE-; v- CHECK VALVE +H- FLEX DUCT -H rj- BUTTERFLY VALVE EF -1 COOK 111 BALL VALVE 1 0.8 RECTANGULAR DIFFUSER r GATE VALVE BELT I 10.1 --�\- DOUBLE BACKFLOW PREVENTER LAY -IN ROUND DIFFUSER EG -2 GAS COCK 80F -NT 24x24 ------- EQUIP/PIPING TO BE DEMOLISHED MARK SLOT DIFFUSER MODEL EXISTING EQUIPMENT TO REMAIN TOTAL CFM OA CFM -VAC VACUUM PIPING EWB RETURN GRILLE/DIFFUSER A AIR PIPING TOTAL MBH STAGES -HWS HOT WATER SUPPLY RTU -1 YORK -HWR HOT WATER RETURN 800 EXHAUST GRILLE/DIFFUSER CHWS CHILLED WATER SUPPLY 80 67 -CHWR CHILLED WATER RETURN 95 FLOW SETTER Fp FIRE PROTECTION PIPING 36.0 1-4 LPS LOW PRESSURE STEAM SUPPLY 4F__TEMP WELL LPR CONDENSATE STEAM RETURN 208/3/60 METER -MPS MED. PRESSURE STEAM SUPPLY M 58.0 -MPR MED. PRESSURE STEAM RETURN ] CAP LINE -HPWS HEAT PUMP WATER SUPPLY RTU -3 YORK HPWR- HEAT PUMP WATER RETURN 44 3 -WAY CONTROL VALVLE p CONDENSATE DRAIN 80 67 _HG -REFRIGERANT HOT GAS - 2 WAY CONTROL VALVE RS REFRIGERANT SUCTION 36.0 LINE STRAINER RL REFRIGERANT LIQUID D2NY 060 -CWS CONDENSER WATER SUPPLY �- HORIZONTAL FIRE DAMPER -CWR CONDENSER WATER RETURN 1. FURNISH WITH POWERED -EXHAUST OPTION. 2. FURNISH WITH MERV-13 FILTERS. 3. FURNISH WITH MANUFACTURER -PROVIDED PROGRAMMABLE THERMOSTAT. 4. SEPERATE DISCONNECT BY E.C. 1. FURNISH AND INSTALL OUTDOOR AIR MONITORING (FLOW MEASURING DEVICE AT EACH RTU WITH SIGNAL OUTPUT FOR ALARM, SEE SEQUENCE OF OPERATIONS, 2. FURNISH AND INSTALL BUILDING AUTOMATED CONTROLLER FOR MONITORING, SCHEDULING, AND CONTROLLING OF HVAC EQUIPMENT. SEE SEQUENCE OF OPERATIONS. 3. FURNISH AND INSTALL CO2 SENSORS IN CONFERENCE ROOM 112, CONFERENCE ROOM 140, AND PUBLIC MEETING ROOM 106. SEE SEQUENCE OF OPERATIONS. AFM: OUTDOOR AIRFLOW MONITOR A. EBTRON, ADVANTAGE GOLD MODEL GTX-116-PC B. INSTALL IN 12" SHEET METAL SLEEVE BETWEEN RTU AND RTU OUTSIDE INTAKE HOOD. C. OUTPUT: 0-10 V, INPUT: 24 V. IF BRANCH DUCT IS LARGER THAN INLET TO DIFFUSER, PROVIDE TRANSITION AT THIS POINT RIGID DUCT ELBOW CENTER LINE RADIUS = 1.5 NECK DIA. 4'-0" MAX. FLEXIBLE DUCT ACOUSTICAL CEILING DIFFUSER Diffuser/Duct Connection Detail. wuw� �cr cn41 crur-n111 F TAG MANUFACTURER MODEL CFM ESP IN. WC ELECTRICAL HP AIR HANDLING UNIT SCHEDULE DRIVE SONES SERVICE NOTES EF -1 COOK 111 600 1 0.8 115/1/60 1 1/6 1 ROOF DOWNBLAST BELT I 10.1 RESTROOMS SUPPLY FAN LAY -IN EG -2 DX COOLING COIL 80F -NT 24x24 GAS HEATING COIL ALUMINUM MARK MANUFACTURER MODEL SIZE TOTAL CFM OA CFM ELECTRICAL ESP FAN HP EDB EWB LDB LWB OA AMB SENS MBH TOTAL MBH STAGES MBH NOTES RTU -1 YORK D2NY 024 800 110 208/3/60 0.6 0.50 80 67 59.2 57.6 95 18.0 23.8 2 36.0 1-4 RTU -2 YORK D2NY 036 1200 155 208/3/60 0.6 0.75 80 67 59.6 58.0 95 26.5 34.3 2 36.0 1-4 RTU -3 YORK D2NY 036 1200 135 208/3/60 0.6 0.75 80 67 59.6 58.0 95 26.5 34.3 2 36.0 1-4 RTU -4 YORK D2NY 060 1800 240 208/3/60 0.6 1.00 80 67 58.2 56.4 95 42.4 59.8 2 65.0 1-4 RTU -5 YORK D2NY 036 1200 120 208/3/60 0.6 0.75 80 67 59.6 58.0 95 26.5 34.3 2 36.0 1-4 RTU -6 YORK D2NY 024 800 60 208/3/60 0.6 0.50 80 67 59.2 57.6 95 18.0 23.8 2 36.0 1-11 RTU -7 YORK D2NY 036 1200 125 208/3/60 0.6 0.75 80 67 59.6 58.0 95 26.5 34.3 2 36.0 1-4 RTU -8 YORK D2NY 060 1800 70 208/3/60 0.6 1 1.00 80 67 58.2 56.4 95 42.4 59.8 2 65.0 1-4 1. FURNISH WITH POWERED -EXHAUST OPTION. 2. FURNISH WITH MERV-13 FILTERS. 3. FURNISH WITH MANUFACTURER -PROVIDED PROGRAMMABLE THERMOSTAT. 4. SEPERATE DISCONNECT BY E.C. 1. FURNISH AND INSTALL OUTDOOR AIR MONITORING (FLOW MEASURING DEVICE AT EACH RTU WITH SIGNAL OUTPUT FOR ALARM, SEE SEQUENCE OF OPERATIONS, 2. FURNISH AND INSTALL BUILDING AUTOMATED CONTROLLER FOR MONITORING, SCHEDULING, AND CONTROLLING OF HVAC EQUIPMENT. SEE SEQUENCE OF OPERATIONS. 3. FURNISH AND INSTALL CO2 SENSORS IN CONFERENCE ROOM 112, CONFERENCE ROOM 140, AND PUBLIC MEETING ROOM 106. SEE SEQUENCE OF OPERATIONS. AFM: OUTDOOR AIRFLOW MONITOR A. EBTRON, ADVANTAGE GOLD MODEL GTX-116-PC B. INSTALL IN 12" SHEET METAL SLEEVE BETWEEN RTU AND RTU OUTSIDE INTAKE HOOD. C. OUTPUT: 0-10 V, INPUT: 24 V. IF BRANCH DUCT IS LARGER THAN INLET TO DIFFUSER, PROVIDE TRANSITION AT THIS POINT RIGID DUCT ELBOW CENTER LINE RADIUS = 1.5 NECK DIA. 4'-0" MAX. FLEXIBLE DUCT ACOUSTICAL CEILING DIFFUSER Diffuser/Duct Connection Detail. wuw� �cr cn41 crur-n111 F TAG MANUFACTURER MODEL CFM ESP IN. WC ELECTRICAL HP MOUNTING STYLE DRIVE SONES SERVICE NOTES EF -1 COOK 111 600 1 0.8 115/1/60 1 1/6 1 ROOF DOWNBLAST BELT I 10.1 RESTROOMS 1 1. FURNISH WITH BIRDSCREEN, ROOF CURB, INTEGRAL DISCONNECT, AND BELT TENSIONER. 2. ON/OFF OPERATION BY LIGHTING CONTROLLER (BY E.C.). RIGID DUCT 1. FURNISH WITH CONCEALMENT LOUVERS AND PATTERN STYLE "MISSION".. 2. SUPPLY GRILLE SHALL BE FABRICATED TO MATCH THE CURVATURE OF THE WALL (ALONG THE 12" DIMENSION) -18 FOOT RADIUS. 3. BORDER IS 24"x24". A / V HVAC Isometric - For Reference. Not to Scale To. Duct Elbow Detail. * S SLIP OR U OPTIONAL ALL SUCH CONNECTIONS TO BE SEALED Ty -P. Divided Flow Branch Connection. MSKTD L Associates, Inc. URE ENGINEERING INTERIOR DESIGN AVOX WAY 930 NORTH MERIDIAN NE, IN 46804 INDIANAPOLIS, IN 46204 2.9337 voice 317.917.1190 2402 fax 317.822.6236 http://www.msktd.com CERTIFICATION D. 0 Illllfl//// �.P•.......00 •,. y /i * i 890360 i * 3'; STATE OF i0T•% IND IAN .0 � P '000 00 11//SS ��NAL \\��. •\ \``, 111\\\\\ The concepts, ideas, designs, plans, and details as shown on this document are the sole property of MSKTD & Associates, Inc., and were created, developed and presented for use on this specific project. None of the concepts, ideas, designs, plans, and details shall be used by any person, firm, or corporation for any purpose whatsoever, without the expressed written consent of MSKTD & Associates, Inc. The Owner shall be permitted to retain copies for information and reference in connection with this project. Revisions: Date: By: SHEET TITLE Mechanical Schedules and Details COMMISSION NUMBER E2- MSKTD 56291-11 BUILD 65076 SHEET NUMBER M5,01 DIFFUSER, GRILLE AND REGISTER SCHEDULE TAG MANUFACTURER MODEL SIZE (IN) INLET (IN) MATERIAL COLOR PATTERN MOUNTING NOTES EG -1 PRICE 80F-HI NT 12x12 10x10 ALUMINUM WHITE EGG CRATE LAY -IN EG -2 PRICE 80F -NT 24x24 22x22 ALUMINUM WHITE EGG CRATE LAY -IN EG -3 PRICE 80F -NT 12x12 10x10 ALUMINUM WHITE EGG CRATE LAY -IN 3 RG -1 PRICE 80F -NT 12x12 10x10 ALUMINUM WHITE EGG CRATE LAY -IN 3 SD -1 PRICE SPD 24x24 6 STEEL WHITE SQUARE PLAQUE LAY -IN SD -2 PRICE SPD 24x24 8 STEEL WHITE SQUARE PLAQUE LAY -IN SG -1 STEELCREST CUSTOM 12x10 12x10 I STEEL I WHITE 1/2" SQUARE SURFACE 1,2 1. FURNISH WITH CONCEALMENT LOUVERS AND PATTERN STYLE "MISSION".. 2. SUPPLY GRILLE SHALL BE FABRICATED TO MATCH THE CURVATURE OF THE WALL (ALONG THE 12" DIMENSION) -18 FOOT RADIUS. 3. BORDER IS 24"x24". A / V HVAC Isometric - For Reference. Not to Scale To. Duct Elbow Detail. * S SLIP OR U OPTIONAL ALL SUCH CONNECTIONS TO BE SEALED Ty -P. Divided Flow Branch Connection. MSKTD L Associates, Inc. URE ENGINEERING INTERIOR DESIGN AVOX WAY 930 NORTH MERIDIAN NE, IN 46804 INDIANAPOLIS, IN 46204 2.9337 voice 317.917.1190 2402 fax 317.822.6236 http://www.msktd.com CERTIFICATION D. 0 Illllfl//// �.P•.......00 •,. y /i * i 890360 i * 3'; STATE OF i0T•% IND IAN .0 � P '000 00 11//SS ��NAL \\��. •\ \``, 111\\\\\ The concepts, ideas, designs, plans, and details as shown on this document are the sole property of MSKTD & Associates, Inc., and were created, developed and presented for use on this specific project. None of the concepts, ideas, designs, plans, and details shall be used by any person, firm, or corporation for any purpose whatsoever, without the expressed written consent of MSKTD & Associates, Inc. The Owner shall be permitted to retain copies for information and reference in connection with this project. Revisions: Date: By: SHEET TITLE Mechanical Schedules and Details COMMISSION NUMBER E2- MSKTD 56291-11 BUILD 65076 SHEET NUMBER M5,01