HomeMy WebLinkAbout44Cao
N
CV
N
0
N
N
-15 4
-
Plumbing First Floor
Vent- Piping Plan
Storm, Sanitary and
- 11
P2.2 CONSTRUCTION NOTES
1 ROUTE SLOPED HUMIDIFIER DRAIN/BLOWDOWN TO NEAREST FD -2. SEE SECTION SHEET
P5.1 FOR ADDITIONAL INSTRUCTIONS.
i FURNISH AND INSTALL SINK DISPOSAL PER MANUFACTURER'S INSTRUCTIONS AND PER
PLUMBING FIXTURE SCHEDULE, SEE SHEET P5.1.
MSKTD
& Associates, Inc.
ARCHITECTURE ENGINEERING INTERIOR DESIGN
1715 MAGNAVOX WAY 930 NORTH MERIDIAN
FORT WAYNE, IN 46804 INDIANAPOLIS, IN 46204
voice 260.432.9337 voice 317.917.1190
fax 260.436.2402 fax 317.822.6236
http://www.msktd.com
CERTIFICATION
`O;\\\\\\1111111111
!Z��� P��:• •N/1'
•��
* 890360
-)3 • STATE OF
'00
//VD I ANP .•'���
The concepts, ideas, designs, plans, and details as
shown on this document are the sole property of
MSKTD & Associates, Inc., and were created,
developed and presented for use on this specific
project. None of the concepts, ideas, designs, plans,
and details shall be used by any person, firm, or
corporation for any purpose whatsoever, without the
expressed written consent of MSKTD & Associates,
Inc. The Owner shall be permitted to retain copies
for information and reference in connection with this
project.
Revisions: Date: By;
SHEET TITLE
Plumbing Storm,
Sanitary and Vent
Floor Plan
COMMISSION NUMBER DATE
MSKTD 5629 2.11-11
BUILD 65076
SHEET NUMBER
P2.2