Loading...
HomeMy WebLinkAbout18060105.3S EVA_UATION FOZ : CNSTRUC D ri PROJECTS A o-a,nes ,aNM�I span p.rrrm a.mm evwasa, pr me p]Izr see. ar me ge mrre r.d r_edaa. ra. rvl,wm ,.u, r.-mr Inal.r.ex. n s C A^„nr%na uw (1)Ime perucar Frdert ocic ar 11 -rel l,.11-1 0ii'a eflmped[n _ IIIre E1-11 falw.ire a Ia Nil_ Yes_ 4. f,se-ORe I]e r9ln II Neta RLL PreOalEM50fl CONCERNS MEED TO as 111111 "IN a I--1 RCIIpI 1-n Re Mme.1 hY number -1p de ama'nnal a: Pe, aN-senestle- npvprrenCrne'RepresentaNee�lzlm'-vamp' d. _ cenv3ncre�r�er,Iaw.a -„color-ane. _ --... p.w. Fepal 3epm,J.De tKUSIUN CUN I KOL NOTES: DISTURBED AREA = 0.24 ACRES 1. AN erosion control pradoose %hall be in accordance with the IDNR "Indiana Handbook For Erosion Control In Developing Areas. dated October 1992 and the SCS "Field Office Technical Guide. 2. The Coy Eng,neer has me nghl to require additional erasion control measurer in the field as conditions warrant. 3. Copies of the lever of item and response from the City of Carmel office for Rule 5 compliance, when reuired. q 4. Any other nformaeon reasonably required by the commission or administrator to properly evaluate the plan. 5. There shall be no dirt debne or storage of materials in the street. 6. AN erosion control metenals shall be approved by the City of Carmel prior to installation. 7. No soil with be removed or 61Poaad of from the grading site. THE CONTRACTOR IS RE21XIBL FOR ALL INSTALLATION AND MAINTENANCE OF EROSION CONTROL AND STORM WATER POLLUTION UTION PREVENTION FOR THE PROJECT AREA, No-.: TAY DUFFNER VARHAN 41 1500 SHELBOURNE ROAD ohcre: ;317) 987-8353 it of OAc"fkafbns: Conlrocto• 's to 'nrorm the C'ly bl Carm.l of who this stormwbter pollution prevention individual is at the pre--tr—, re 1 G. V-' fo dry earth disturbing It construdion bcliliti- THE INDANA STOR.v WATER QUALITY MANUAL & Tb= CITY OF Greenwood STANDARDS SHA__ BE USED IN CONJUNC-ION WF- THE SE OF EROSION CONTROL PLAYS. EROSION CONTROL SEQUENCE I. Tne folomn er &, cD ' -4 meas,res shall be in place pfiar to coy land disturbing activt es: L . C'eo*e o etcti'zed cr r --tion entrance I n, orf Ternpora'v r of -� Iecrion Measures on existing slcrm inle's. 1.3. ^say Tenlporcti S -eice and/or Sill Sock Protector as shown on approved plans 1.4, rs,o' lemaarati Corc•e'e woshoL- 2. Once arc clst.;rarg ar,1r es aegr. tie following practices shall be provided: 2. Or Ce earth ds'uly-g cc"es begin, the ad %cent roadways, adjacent drives and park ng log shall be con finuoisly monitored for sed'ment racking. If sediment is fc.--mmediate act 3n Is equirec to clean the offsite areas Ord the curent erosion control practices will need `a be inspeced and modifed accoreirgly to prevent cry'_dier scare 4o- Caving the project si-e. 2.2. Once the new ser sh.,c-_res%pipes are is In place, me opproorcte type of'We- protection measures shall be placed. 2.3. Ccn-n_ec mor torr- cl a I exposed areas shall be performed in order ro ver'fy the surrounding areas are not beccmirg sediment laden from censtrucion activities 015 le. 2.4. As rhe CO-sr.Cta, cc -,t3 ds'Lroed areas sholl be stabilized as soon cs they are at finished grade or will be left bare for more than 15 days. 25. orc,ide Fncg'-de say actio^ Lear Penal grading of all areas including erosion control olenzefngseeding and sodding as appropriate. 12.6. $ram' sewers -a' Decors s Iced due to construction ariviiies shall be cleaned will C jet vocucm one the mateoal Grocery disposed of. EROSION CONTROL NOTES: L AN praaose- stage, -r, sed merr conrrol shall be in conformance win the City of Carmel S'andards, Discrepancies between the plans and fie Manual <hall not alleviate 're c-ngcco-from adieH-g'c tie requirements as se' forth in the Manual. 2. AI e'cs cn Ca•-'oI pro: --es sho to in accordance with the "Inclono Storm Wo`er G?Jorty Mcruol" and the SCS "Feld Office Tech n cal Guide". d. Tie GN ^g Tee' has re •gr •o'eouire additional erosion control measures it the'Sld as conditions warrant, 4. Aodflone oroso, arc ieo,mert corhol measures may be reouired by the inspector. S. Tie storm weer oiciry Lint ;hew-, on hese plans shall be the snit Inslolled dJring the development or ^his property. No subst'Aftlons shall be permitted. EROSION CONTROL SCHEDULE EROSION CONTROL MEASURE - MAINTENANCE T INSTALLATION SEQUENCE SEE CHART FOR MAINTENANCE REQUIREMENTS GRATE REINFORCED CORNERS MANAGEABLE 2 FOOT CONTAINMENT AREA DANDY SACK LIR STRAPS OPTIONAL OVERFLOW PORTS DUMPINGD STRAPS STORM N LET nava 8 • -ANny ;AaX,w r,1,Gr„ WR0Y70® IR 4R6 091 IsIN A wCVEN ol Th! %CLL(Nd,NG SPECIfICAiICNe'. POLYETHYLENE LINING TO WT. ] s. s �=.,,'�s—e, weed soar n s,: •, so. v.xr a -+,spa m *, c also sson eao [sra 90 GKn enNe 3r A] 1365' A V 1,x1 ca -«uYe W- ,w t: ✓at en Abe %10 w c .rni u,n Uss % Pte•^�^Ce111v c�,us slo s,e�e crass w cm 5902 -las Sac AI': are- _y Sul u. oe :+ue Lv .oar uptiorwl oil absorbent p1lows DETAIL Of INLET SEDIMENT CONTROL DEVICE PROJECT: DR. Il CRY/STATE: DATE: DR. NO: METAL PINS OR STAPLES TO SECURE THE O 7 NOTE: POLYETHYLENE LINING TO WASHING AREA: 15' % 20' MIN. WOOD OR METAL STAKES TO SECURE THE STRAW BALES. STRAW BALE BARRIER STRAW BALES POLYETHYLENE LINING (10 15' MIN. STRAW HALE MILE] METERS) - THE LINING SHOULD BARRIER EXTEND OVER THE STAN BALES, SAND BAGS, OR GRAVEL BERM. � SLOPE TO SLOPE 0 27.\ OW POINT O o\ STABILIZE WASH AREA WITH COMPACTED SOIL MATERIAL POLYETHYLENE LINING (10 MILLIMETERS) - THE LINING p FRONT ELEVATION SHOULD EXTEND MR THE _ ,TAW BALES, SAND BAGS, OR SLOPE 0 2% SLOPE 0 6% � 0 GRAVEL BERM. 0 —� O METAL PINS OR STAPLES o SAND BAGS OR 6" POLYETHYLENE LINING (10 TO SECURE THE 0 GRAVEL BERM. MILLIMETERS) - THE LINING SHOULD ST LINING TC o S/ Q STRAW BALE EXTEND OVER THE THEPOLYETHYLENE STRAW STRAW BALES, AW B THE BALES. 0 BARRIER SAND HAGS, OR GRAVEL BERM. / O p SLOPE ®z% y Q 0 e8 co 0 COMPACTED SOIL MATERIAL COMPACTED SOIL MATERIAL ENTRANCE & EX15T TO WASH AREA: WOOD OR METAL STAKES TO SECURE WIDTH AS REQUIRED TO ACCOMODATE STRAW BALES (2 PER STRAW BALE) EQUIPMENT AND SPRAY -SPLASH AREA. P PLAN nONSTRUCT GRAVEL BERM 6 ABOVE SECTION A—A STABILIZED BASE COURSE AT ENTRY -EXIT TO RETAIN WASH RUNOFF, A 0 CONCRETE WASHOUT AREA NOT TO SCALE SEASONAL SOIL PROTECTION CHART: 6TABILRATgN PRAC ITE JAN FEB MAR APR MAY JUNE JULY AUG SEPT OCT NOV DEC PREMANENT A '11111VU1P--'lli SEEDING DORMANT B _01 B _D SEEDING TEMPORA SEEPING RY CE '-LININ D SODDING IF—'4111111UP D— MULCHING G A KENTUCKY BLUEGRASS 40 LBS/ACRE; CREEPING REO FESCUE 40 LBS/ACRE; PLUS 2 TONS STRAW MULCH/ACRE, OR ADD ANNUAL RYEGRASS 20 LBS/ACRE. B = KENTUCKY BLUEGRASS 60 LBS/ACRE; CREEPING RED FESCUE 60 LBS/ACRE; PLUS 2 TONS STRAW MULCH/ACRE, OR ADO ANNUAL RYEGRASS 30 LBS/ACRE. C = SPRING OATS 3 BUSHEL/ACRE D = WHEAT OR RYE 2 BUSHEL/ACRE E = ANNUAL RYEGRASS 40 LBS/ACRE F = SOD G = STRAW MULCH 2 TONS/ACRE "/I/' IRRIGATION NEEDED DURING JUNE, JULY, ANO/OR SEPTEMBER IRRIGATION NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD SEASONAL SOIL PROTECTION CHART POSTS - T X 2" WOOD OR STEEL FENCE POST W/ PROJECTION TO FASTEN FABRIC - SPACING 5 OL. -NO JOINTS ALONG LENGTH -STAPLE OR WIRE TO POSTS -(AND WIRE FENCE IF USED) 6" % 6" TRENCH TO BE BACKFILLED AND COMPACTED - INSTALLATION' 'THE BOTTOM 1' OF THE FENCE SHALL BE BURIED IN THE TRENCH ON THE UPSLOPE SIDE, 2. FENCE SHALL BE INSTALLED ALONG LEVEL GRADES, NOT ACROSS FLOW CHANNELS. 3. IF OPTIONAL SUPPORT WIRE FENCE 15 USED, POST SPACING MAY BE EXTENDED TO 8' O.C. MAINTENANCE 1. INSPECT SILT FENCE PERIODICALLY (WEEKLY) AND AFTER EACH STORM EVENT. 2. IF FABRIC IS TORN OR DAMAGED OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE, OR IT IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE NOT TO UNDERMINE THE FENCE DURING SEDIMENT REMOVAL. 5. AFTER THE CONTRIBUTING AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND REMAINING SEDIMENT, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. SILT FENCE SECTION NOT TO SCALE - PRACTICE 3.74 GEOTE%TILE 12' (MIN.) FILTER FABRIC SECTION VIEW INDOT Nil. 2 MAINTENANCE! 1, INSPECT WEEKLY, AND AFTER EACH STORM EVENT OR HEAVY USE. 2. RESHAPE AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. 3. TOPORESS WITH CLEAN STONE AS REQUIRED. MAINTAIN MINIMUM DEPTH THROUGHOUT CONSTRUCTION. 4, IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY SWEEPING OR BRUSHING. (DO NOT FLUSH AREA WITH WATER.) 5. REPAIR ANY BROKEN PAVEMENT IMMEDIATELY. STABLIZED CONSTRUCTION ENTRANCE NOT TO SCALE - PRACTICE 3.0 14020 Miss. sm.— Drive Carmel, Indiana 46033 P: 317.324.8695 F: 317.324.8717 www.Frl -Ensi PROJECT: DUFFNER GUEST HOUSE PROJECT LOCATION: 11500 SHELBOURNE ROAD CARMEL, INDIANA 46032 HAMILTON COUNTY SECTION, TOWNSHIP, RANGE. kl___S6, T17N, R3E CLIENT, AY DUFFNER VARHAN 11500 SHELBOURNE ROAD CARMEL, INDIANA 46032 PLAN DATE. 5/17/2018 DESIGN: CHECK: DRAWN AF AF KG PROJECT NO. 1803003 SHEET NAME EROSION CONTROL DETAILS SHEET NO. C103