Loading...
HomeMy WebLinkAboutA0050 12'-9 7/16" NEVq FOUNDATION NOTES: - FURNISH & INSTALL (6)18"® X 48"D CAST -IN -FLAGS CONCRETE PIERS AS SHOWN ON PLANS & DETAILS. - FURNISH & INSTALL (6) NEVq 6X6 TREATED POSTS ON TOP OF CONCRETE PIERSAS SHOWN ON PLANS & DETAILS. - FURNISH & INSTALL NEVq CAST -IN -PLACE CONCRETE MONOLITHIC SLAB AND FOUNDATION VgALL FOR STORAGE AS SHOWN ON PLANS & DETAILS. RELEASED IFCR CONSTRUCTION R ectfi SE -Di— FO U N I I ICItp a� L ��rel DATE/ 4 06/2 i18 Adam Schriner DATIO N PLAN www.caseind .com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f Dave Null Lead Designer dnull@caseindy.com Craig Dice Designer cdice@caseindy.com Approved By: Date: These drawings have been prepared by Case Design & Remodeling solely for Its use and should not be reproduced or relied upon by any other parties. Dlmenslons shown or scaled are subject to change per actual job condition and must be verified. Mater lals are to be supplied as specified as equal or standard when not uniquely specified. Installed materials may vary In appearance from drawings. Reference manufacturer's product data for actual appearance and specifications. O V � �a > M O CC J aL M p1 IV, .� 0O WJ 30E E 0 L ViO:1u Revision: Date: #1 03.02.18 #2 03.14.18 #3 06.04.18 FINAL Sheet: of is W9