HomeMy WebLinkAboutA0050
12'-9 7/16"
NEVq FOUNDATION NOTES:
- FURNISH & INSTALL (6)18"® X 48"D CAST -IN -FLAGS CONCRETE PIERS AS SHOWN ON
PLANS & DETAILS.
- FURNISH & INSTALL (6) NEVq 6X6 TREATED POSTS ON TOP OF CONCRETE PIERSAS
SHOWN ON PLANS & DETAILS.
- FURNISH & INSTALL NEVq CAST -IN -PLACE CONCRETE MONOLITHIC SLAB AND FOUNDATION
VgALL FOR STORAGE AS SHOWN ON PLANS & DETAILS.
RELEASED IFCR CONSTRUCTION
R ectfi SE -Di— FO U N
I I ICItp a� L ��rel
DATE/ 4 06/2 i18
Adam Schriner
DATIO N PLAN
www.caseind .com
99 E. Carmel Drive, Suite 100
Carmel, Indiana 46032
317.846.2600 317.846.2601(f
Dave Null
Lead Designer
dnull@caseindy.com
Craig Dice
Designer
cdice@caseindy.com
Approved By:
Date:
These drawings have been
prepared by Case Design &
Remodeling solely for Its use and
should not be reproduced or relied
upon by any other parties.
Dlmenslons shown or scaled are
subject to change per actual job
condition and must be verified.
Mater lals are to be supplied as
specified as equal or standard
when not uniquely specified.
Installed materials may vary In
appearance from drawings.
Reference manufacturer's product
data for actual appearance and
specifications.
O
V �
�a
> M
O
CC J
aL M
p1 IV,
.� 0O WJ
30E
E 0 L
ViO:1u
Revision: Date:
#1 03.02.18
#2 03.14.18
#3 06.04.18
FINAL
Sheet: of
is
W9