Loading...
HomeMy WebLinkAboutA0061J— 1 1—VU 45-07-08 NEW ROOF FRAMING NOTES: - FURNISH & INSTALL NEW 3-PLY 14" LVL BEAMS ON TOP OF POSTS AS SHOWN ON PLANS & DETAILS. TOP OF BEAM ELEVATION = TOP TO WALLOF EXISTINGSUNROOM. - FURNISH & INSTALL HIP SCISSOR TRUSSES AS SHOWN ON PLANS & DETAILS. NEW TRUSSES TO BE 12/12 EXTERIOR PITCH TO MATCH EXISTINGAND 6/12 INTERIOR PITCH. FIELDVERIFY PITCHES OF EXISTINGROOFS PRIOR TOORDERINGTRUSSES. TRUSSESTO BEAR ON NEW LVL BEAMS AND STUD WALLS OF STORAGEAS SHOWN ON PLANS & DETAILS. - FURNISH& INSTALL2XbOVERBUILD RAFTER FRAMING TO TIE IN NEW ROOF SLOPES TO EXISTINGSUNROOM ROOF SLOPES. - FURNISH & INSTALL NEW 1/16" OSB ROOF DECKING WITH H-CLIPS. - FURNISH & INSTALL NEW 2X SUBFASCIA TO MATCH EX ISTINO. RELEASED IFCR CONSTRUCTION P10-SEDI—ROOF FRAMING PLAN N itpntEai al DAN T 06/25/18 Adam Schriner J 1—VV—VV www.caseind .corn 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f Dave Null Lead Designer dnull@caseindy.com Craig Dice Designer cdice@caseindy.com Approved By: Date: These drawings have been prepared by Case Design & Remodeling solely for Its use and should not be reproduced or relled upon by any other partles. Dlmenslons shown or scaled are subject to change per actual job condition and must be verlfled. Materials are to be supplied as speclfled as equal or standard when not uniquely speclfled. Installed materlals may vary In appearance fromdrawings. Reference manufacturer's product data for actual appearance and speclflcatlons. O V � �a M > O J c� L p1a,fo .(M 0 7 M gw� 3co0E E 0 L V) O �qu Revision: Date: #1 03.02.18 #2 03.14.18 #3 06.04.18 FINAL Sheet: of 6 18