HomeMy WebLinkAboutA0061J— 1 1—VU
45-07-08
NEW ROOF FRAMING NOTES:
- FURNISH & INSTALL NEW 3-PLY 14" LVL BEAMS ON TOP OF POSTS AS SHOWN ON PLANS &
DETAILS. TOP OF BEAM ELEVATION = TOP TO WALLOF EXISTINGSUNROOM.
- FURNISH & INSTALL HIP SCISSOR TRUSSES AS SHOWN ON PLANS & DETAILS. NEW
TRUSSES TO BE 12/12 EXTERIOR PITCH TO MATCH EXISTINGAND 6/12 INTERIOR PITCH.
FIELDVERIFY PITCHES OF EXISTINGROOFS PRIOR TOORDERINGTRUSSES. TRUSSESTO
BEAR ON NEW LVL BEAMS AND STUD WALLS OF STORAGEAS SHOWN ON PLANS &
DETAILS.
- FURNISH& INSTALL2XbOVERBUILD RAFTER FRAMING TO TIE IN NEW ROOF SLOPES TO
EXISTINGSUNROOM ROOF SLOPES.
- FURNISH & INSTALL NEW 1/16" OSB ROOF DECKING WITH H-CLIPS.
- FURNISH & INSTALL NEW 2X SUBFASCIA TO MATCH EX ISTINO.
RELEASED IFCR CONSTRUCTION
P10-SEDI—ROOF FRAMING PLAN
N itpntEai al
DAN T 06/25/18
Adam Schriner
J 1—VV—VV
www.caseind .corn
99 E. Carmel Drive, Suite 100
Carmel, Indiana 46032
317.846.2600 317.846.2601(f
Dave Null
Lead Designer
dnull@caseindy.com
Craig Dice
Designer
cdice@caseindy.com
Approved By:
Date:
These drawings have been
prepared by Case Design &
Remodeling solely for Its use and
should not be reproduced or relled
upon by any other partles.
Dlmenslons shown or scaled are
subject to change per actual job
condition and must be verlfled.
Materials are to be supplied as
speclfled as equal or standard
when not uniquely speclfled.
Installed materlals may vary In
appearance fromdrawings.
Reference manufacturer's product
data for actual appearance and
speclflcatlons.
O
V �
�a
M
> O
J c�
L p1a,fo
.(M 0
7 M gw�
3co0E
E 0 L
V) O �qu
Revision: Date:
#1 03.02.18
#2 03.14.18
#3 06.04.18
FINAL
Sheet: of
6 18