Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
844.86 Building Permit
Castel lay vt Improvement Location Permit PermitN . 'TiWriS ipte This permit is valid only if construction is started within 120 days of issuance date; all construction is completed (c/o issued) within (2) two years of issuance date unless an extension of time has been officially granted by letter by the Director, Department of Community Development. ' (� NAMI�5> �v e S S PHONES/ BUILDER ,V� 1 STR T - COY 7` T ZIP PO 0 5 ©8_ _ NAME OF BUSINESS (IF APPLICABLE); NAME ,,,-� PHONE OWNER 0110– STREET CITY STATE ZIP LOT SU IVISIgq SECTION LOCATION , I i A C -T M II o .S,L- ADDRESS OF COQ CT ION A. TYP OF CONST CTION 2. O Residential (One or Two Familyp t :a C. D 1.Residenti (On) or Two Family) tj 3. O Commercial f ` •y 2. b Residential (Multi-family)(��� 4. Q Industrial r;,a U. 3. O Commercial 5. Q Other (Specify) - [ic 4. Industrial 6,EA NUV L 5 (yin ZE O E. rOD USE OF PROPERTY5. Q Institutional rTwoFamil Dwellin y gTYP OF SEWAGE DISPOSAL`S amilyL Public (Name of System QYfh J !JPS ) ercialCr f rw3 `� ti 0 Private (Septic Tank, etc.) (,J�s ���� 4. O Industrial a:a 5.0 Other (Sepcify)« I T! OF IMPROVEMENT 1. New Structure . O Commercial Tenant Space 3.0 Addition Porch Room 4.0 Remodel 5.0 Foundation Only 6.0 Demolition 7.0 Accessory Building 8.0 Swimming Pool 9.0 Garage Detached _ Attached PRESENT USE OF PROPERTY F. ZONING CLASS[ CATION OF t 4ERTY Present S G. ESTIMATE COST OF C (Excluding Land Value). 0 H. Lot Split Yes No/i,— I. Flood Zones: Yes—_._. No�r� A. B. / J. Sump Pump: Yes.__ _ No K. Geothermal Heat Pump: Yes—_—_- No X - Th undersigned agrees that any construction, reconstruction, enlargement, relocation or alteration of structure, or any change in the use of land or structures requested by this application will comply with, and comform to, all applicable laws of the State of Indiana, and the "Zoning Ordinance of Carmel, Indiana - 1980", adopted under the authority of Acts of 1979, Public Law 178 Sec. 1 et seq, General Assembly of the State of Indiana, and all Acts amendatory thereto. I further certify that the construction will not be used or occupied until a certificate of occupancy has been issued by the Department of Community Development, Carmel, Indiana. I er certi at on drai are co ect¢ t, Sign�,�r Jof O er or f Ct Q.r Address- -1--A ddr s -U I _ City -1 Sewer �a',city Aj� - irector, De � =CJs'.' Receive By -1 and IIJ State Zip Phone of CRmMunity Development Inspections Needed: Drainage t_7i__oot_in_g/1bhder SlabT�pPol�� Rough In Meter Base Square Footage --- Permit (Sq. Footage) ............-- Inspections .......... .......... __ Certificate of Occupancy......... %L� Total .......................... L� --- Plan Comm. Approved (Date)% ---- Board of Zoning Appeals / t Approval (Date) ---------- /- A f_ T A t) - CARMEL / C LAY TOWN S H I P DEPARTMENT 01P COMMUNITY I3 EVE LO PMENT Buil.din� Permit =reformation CARMEL ZONING ORDINANCE Z-160, SECTION 29.4.2(3): THE BUILDING COMMISSIONER (DIRECTOR, DEPT. OF COMMUNITY DEVELOPMENT OR STAFF) SHALL APPROVE OR DENY THE IMPROVEMENT LOCATION PERMIT (BUILDING PERMIT) WITHIN FIVE (5) WORKING DAYS OF THE RECEIPT OF TA WRITTEN APPLICATION FORM AND ACCOMPANYING MATERIALS. THE IMPROVEMENT LOCATION PERMIT (BUILDING PERMIT) SHALL BE ISSUED WHEN THE PROPOSED STRUCTURE, IMPROVEMENT OR USE AND ITS LOCATION CONFORM IN ALL RESPECTS TO THIS ORDINANCE. The following must be received by the Department of Community Develoument before an building or remodeling permit can be reviewed or issued by the staff: 1. A completed Improvement Location Permit application. 2. Two (2) complete sets of construction plans. In compliance with the State Energy Code, must list R -values on.walls, ceilings, etc. If a commercial construction, plans must be stamped approved by the Indiana State Department of Fire Prevention and Building Safety. 3. A copy of sewer permit (from City of Carmel Engineering Dept. or Hamilton Western Utilities, whichever applies) or septic permit (Hamilton County Health Department). 4. Three (3) copies of a site or plot plan showing the following REQUIRED information (can be obtained from the landowner or land developer): Lot drawn to scale All dimensions Scale and North arrow - All roads, alleys, right-of-ways, etc. - All other utilities and drainage right -of -:ways and.,ea_sements Any applicable flood plain area Building pad elevation and lot corner elevations - All accessory buildings -- existing or proposed - All sidewalks and driveways Sewer and water lines, septic system and well location - Drainage flow arrows - All drainage swales and subsurface facilities (retention/detention areas, eti - Dimensional cross sections of all drainage swales - Sump pump (sump pump pits) showing discharge locations Geothermal heat pump discharge locations Drainage Swales: All required drainage swales must be shown on the plot plan and constructed in .all subdivisions prior to the Department of Community Development -performing a final inspection of any structure per plans on file or per the following: Constructed swales shall be a minimum of 1'6" deep with side slopes of not less than 4 to 1. If this information is not submitted, it will extend the time it takes to get an.approved building permit. I CERTIFY THAT ALL OF THE ABOVE ,LISTED INFORMATION IS SHOWN COMPLETELY AND ACCURATELY ON THE ATTACHED PLOT OR SITE PLAN AS SUBMITTED WITH A BUILDING PERMIT APPLICATION TO THE CARMEL/CLAY DEPARTMENT OF COMMUNITY DEVELOP ENT. SIGNATURE: V v 4 I (P�J���XVM.PHONE: ADDRESS: NAME OF PLUMBING CONTRACTOR: (If Applicable)Pro -PCs S /,0&a 1 `7P VAIA STATE PLUMBING LICENSE NUMBER: �C 9�