HomeMy WebLinkAbout326862 06/29/18 VOUCHER NO. WARRANT NO. Prescribed by State Board of Accounts City Form No.201(Rev.1995)
Vendor# 371561 ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
WHITE CONSTRUCTION, INC. IN SUM OF$ CITY OF CARMEL
3900 E. WHITE AVENUE An invoice or bill to be properly itemized must show:kind of service,where performed,dates service
rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
CLINTON, IN 47842
Payee
$528,272.00
Purchase Order#
ON ACCOUNT OF APPROPRIATION FOR
Engineering
Terms
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
101438 2 44-628.70 $528,272.00 1 hereby certify that the attached invoice(s),or 6/15/18 2 City Center Drive and 3rd Ave SW RAB- $528,272.00
2200 900 2200 900 Community Crossing Grant
bill(s)is(are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Tuesday,June 19,2018
Jeremy Kashman
Director
I hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
20
Cost distribution ledger classification if claim paid motor vehicle highway fund.
Clerk-Treasurer
i
CITY OF CARMEL
PROJECT NO. 16-ENG-108
City Center Drive and 3rd Avenue SW RAB
Progress Estimate Summary Sheet Ft Signature Page
F. 0 . 10143$
9 00 - 44
Progress Estimate No 2
Partial x
Final
Earned`to date $ 729,093.89
Previous payments $ 142,125.00
Earnings this estimate $ 586,968.89
Retainage $ 58,696.89
Amount due Contractor $ 528,272.00
CONTRACTOR: .�i /lil_ -� DATE:
White Construction Phone: (800) 355-9401
3900 East Whilte Avenue, PO Box 249 Fax: (765)832-2075
Clinton, IN 47842
CONSULTANT: DATE:
AMERICAN STRUCTUREPOINT, INC. Phone: (317) 547-5580
7260 Shadeland Station Fax: (317) 543-0270
Indianapolis, Indiana 46256.3957
I
APPROVED BY: DATE:
CITY OF CARM
American Structurep®int, Inc.
Payment Invoice
16-ENG-108 - City Center Drive and 3rd Avenue SW RAB
Description The existing signalized intersection will be reconstructed to a multi-lane roundabout. The project
construction will include reconstructing the median and outside curb lines for a inulti-lane roundabout.
The asphalt pavement will be milled and reconstructed as needed for the roundabout intersection.
Additionally the pedestrian facilities adjacent to the vehicular travel lanes will be altered to improve
pedestrian safety and mobility. The existing storm water system will be reconstructed as needed for the
intersection improvements. Additional lighting will be installed for the roundabout intersection. The
private drives located within the limits of the intersection reconstruction will be replaced. Streetscape
improvements along 3rd Avenue SW and around the roundabout will be constructed. Access to
properties within the project limits will be maintained during construction.
Payment Number 2
Pay Period 04/19/2018 to 05/31/2018
Prime Contractor White Construction
3900 East Whilte Avenue,PO Box 249
Clinton,IN 47842
Payment Status Pending
Awarded Project Amount $3,288,270.00
Authorized Amount $3,288,270.00
Line Po'untber Item Unit Current Paid Quantity 1 jnit Price Amount
1
Section: 1 Description
0001 0001 LS 0.250 $150,000.000 $37,500.00
CONSTRUCTION ENGINEERING
0003 0003 LS 1.000 $100,000.000 $100,000.00
CLEARING RIGHT OF WAY
0005 0005 LFT 10.000 $10.000 $100.00
CURB,CONCRETE,REMOVE
0006 0006 LFT 1,521.500 $10.000 $15,215.00
CURB AND GUTTER,REMOVE
0007 0007 SYS 22.120 $7.500 $165.90
Project Total: $586,968.89
Payment Invoice: 06/13/2018
16-ENG-108-City Center Drive and 3rd Avenue SW RAB Page 1 of 4
Line Unit rent Paid QnantinitPrice
SIDEWALK CONCRETE,REMOVE
0012 0012 CYS 68.560 $25.000 $1,714.00
EXCAVATION,COMMON
-----------
0020 0020 SYS 111.500 $15.000 $1,672.50
SUBGRADE TREATMENT,TYPE II
0021 0021 SYS 400.560 $25.000 $10,014.00
SUBGRADE TREATMENT,TYPE IC
0022 0022 CYS 122.460 $50.000 $6,123.00
STRUCTURE BACKFILL,TYPE 2
0045 0045 LFT 207.000 $38.000 $7,866.00
STRAIGHT CONCRETE CURB
0050 0050 SYS 111.500 $107.000 $11,930.50
PCCP FOR APPROACHES,9 IN.
---,---------------- -------- -------- ---------- -------
0056 .0056 LFT 487.000 $8.000 $3,896.00
PIPE,TYPE 4,CIRCULAR, 6 IN.
--------------- ........ -------
0057 0057 LFT 263.500 $60.000 $15,810.00
PIPE, CLASS III RCP,CIRCULAR, 12 IN.
----------
0058 0058 LFT 72.500 $75.000 $5,437.50
PIPE,CLASS III RCP,CIRCULAR, 15 IN.
---------- ------ ----------- --------- --------
0061 0061 CYS 32.630 $65.000 $2,120.95
AGGREGATE FOR UNDERDRAINS
0062 0062 SYS 379.860 $1.500 $569.79
GEOTEXTILES FOR UNDERDRAIN
------------------ ------- -------
0067 0067 EACH 4.000 $3,000.000 $12,000.00
INLET,J 10
--
0068 0068 EACH 3.000 $3,000.000 $9,000.00
INLET,M 10
-------------- ---------------
0069 0069 EACH 6.000 $3,000.000 $19,000.00
INLET,R 13
Project Total: $586,968.89
Payment Invoice: 06/13/2018
16-ENG-108-City Center Drive and 3rd Avenue SW RAB Page 2 of 4
Line f—e—ml 0 10 W,nit 1-1-1
NUINE
0070 0070 EACH 1.000 $3,500.000 $3,500.00
MANHOLE,C4
0071 0071 EACH 3.000 $4,000.000 $12,000.00
MANHOLE,C10
0073 0073 EACH 1.000 $140.000 $140.00
CONSTRUCTION SIGN,C
0078 0078 LS 0.500 $150,000.000 $75,000.00
MAINTAINING TRAFFIC
-----------
0130 0130 LS 1.000 $250.000 $250.00
BOLLARD,REMOVE
0163 0163 LFT 1,264.000 $90.000 $113,760.00
12"DUCTILE IRON WATER MAIN
0164 0164 LFT 237.250 $65.000 $15,421.25
8"DUCTILE IRON WATER MAIN
0165 0165 LFT 1,495.250 $50.000 $74,762.50
STRUCTURE BACKFILL
0167 0167 EACH 7.000 $2,500.000 $17,500.00
12" GATE VALVE
----------
0168 0168 EACH 3.000 $1,500.000 $4,500.00
8"GATE VALVE
0174 0174 EACH 4.000 $250.000 $1,000.00
VALVE RETIREMENT
---------------------- ------1-1------
0183 0183 EACH 2.000 $5,000.000 $10,000.00
COMPLETE HYDRANT ASSEMBLY
$586,968.89
Section Total.
Project Total: $586,968.89
Payment Invoice: 06/13/2018
16-ENG-108-City Center Drive and 3rd Avenue SW RAB Page 3 of 4
Summary
Current Approved Work: $586,968.89 Approved Work To Date: $729,093.89
Current Stockpile Advancement: $0.00 Stockpile Advancement To Date: $0.00
Current Stockpile Recovery: $0.00 Stockpile Recovery To Date: $0.00
Current Retainage: $58,696.89 Retainage To Date: $72,909.39
Current Retainage Released: $0.00 Retainage Released To Date: $0.00
Current Liquidated Damages: $0.00 Liquidated Damages To Date: $0.00
Current Adjustment: $0.00 Adjustments To Date: $0.00
Current Payment $528;272.00 : Payments Tq Date:-" $656,184.50
Previous Payment: $127,912.50 Previous Payments To Date: $127,912.50
Payment Invoice: 06/13/2018
16-ENG-108-City Center Drive and 3rd Avenue SW IAB Page 4 of 4