Loading...
HomeMy WebLinkAbout67ROOF JOISTS, SEE PLAN BOUNDARY NAILING, - SEE SCHEDULE 2x BEVELED BLOCK - BETWEEN EACH JOIST SEE DETAIL M/S521 CUT ROOF JOIST DOWN TO A 26 AT EAVE SEE ARCH FOR FASCIA AND SOFFIT SIMPSON 'A34' WITH - (12) 8d x 1 1/2" NAILS EACH BLOCK EDGE NAILING, SEE SCHEDULE (3) 2x TOP PLATES - BOUNDARY NAILING, - SEE SCHEDULE ROOF SHEATHING, — SEE SCHEDULE 2x6xCONTIN000S LEDGER WITH (3) 16d TO EACH STUD PREFABRICATED WOOD TRUSS, SEE PLAN WALL SHEATHING, SEE SCHEDULE NO SCALE BOUNDARY NAILING, SEE SCHEDULE 202 CONTINUOUS - LEDGER WITH (2) 16d AT 12' O.C. AND (3) 1/4"x3 1/2" SIMPSON 'SDS' TO EACH TRUSS PSON 'LSU212'J NO SCALE EACH JOIST WITH EACH JOIST WITH (6) 1 O x 3" FACE SEE SCHEDULE SIMPSON 'H1' EACH NAILS, (5) 1 O x EACH TRUSS. ATTACH TO JOIST ATTACH TO TOP 1.1/2- NAILS TO SEE PLAN PLATES WITH (4) 8d x JOIST EDGE NAILING, 202 CONTINUOUS 2 1/2" NAILS, ATTACH SEE SCHEDULE 8d XR1 1/ " NAIWITH LS TO JOIST WITH (6) BOUNDARY NAILING, L - - - 8d x 1 1/2" NAILS 16d AT 12" O.C. AND 2x BEVELED TOP PLATE WALL SHEATHING, X WITH 16d AT 6' O.C. SEE SCHEDULE 2x BEVELED BLOCK WOOD BEAM - (WHERE OCCURS) 1 SEE PLAN AND SCHEDULE SEE DETAIL M/S521 ING DETAIL AT 2x BLOCKING BETWEEN STUDS WITH 16d AT 6" O.C. LEDGER TO BLOCKS WOOD STUD WALL, SEE PLAN AND SCHEDULE SIMPSON LSTA12 AT 24" O.C. WITH (10) 10d x 3" NAILS SCL x CONT FASCIA , 2x6 BLO AT 24" EDGE NAI SCHEDUL SIMPSON ATTACH WITH (4) NAILS, A WITH (4) (2) ROWS BOUNDARY NO SCALE BOUNDARY NAILING, EACH JOIST WITH .--'ice SEE SCHEDULE ROOF JOISTS, EACH TRUSS. ATTACH TO SEE SCHEDULE SEE PLAN ROOF JOIST, 202 CONTINUOUS SEE PLAN 8d XR1 1/ " NAIWITH LS LEDGER WITH (2) BOUNDARY NAILING, I 16d AT 12" O.C. AND SEE SCHEDULE (12) 8d x 1 1/2' (3) 1/4'x3 1/2" 2x BEVELED BLOCK CEILING, SEE ARCH SIMPSON 'SDS' TO BETWEEN EACH JOIST 1 EACH TRUSS SEE DETAIL M/S521 TRUSS ATTACH TO TOP EDGE NAILING, - SIMPSON 'A34' WITH SEE SCHEDULE 2 1/2* NAILS, ATTACH (12) 8d x 1 1/2" • I OVER BOTTOM CHORDS NAILS EACH BLOCK WOOD SHEATHING, - 2x6xCONT1N000S EDGE NAILING, •11 SEE SCHEDULE SEE SCHEDULE WOOD STUD WALL - IMPSON 'LSU212' CUT ROOF JOIST DOWN WOOD STUD WALL SEE EACH JOIST WITH (6) 10d x 3" FACE TOA 2x6 AT SAVE 'H1' NAILS, (5) 10d x SEE ARCH FOR SIMPSON EACH NAILS TO FASCIA AND SOFFIT JOIST ATTACH TO TOP OI T JOIST 3/8" x 4' STEEL PLATES WITH 4 8d x EDGE NAILING, BASKETBALL STANDARD 2 1/2" NAILS, ATTACH SEE SCHEDULE SEE SCHEDULE TO JOIST WITH (6) PIPE SUPPORT WOOD STUD WALL, SEE L - - - 8d x 1 1/2" NAILS HANGER PLATE AT PLAN AND SCHEDULE 2x BEVELED TOP PLATE -/ WALL SHEATHING, (3) 2x TOP PLATES WITH 16d AT 6" O.C. SEE SCHEDULE SEE PLAN WOOD BEAM, (WHERE PIPE SUPPORT.WOOD WALL SHEATHING, OCCURS) SEE PLAN WOOD BEAM (WHERE OCCURS) SEE SCHEDULE JOISTS ROOF TRUSS JOISTS BEARING AT TRUSS/ OD 6HWXL SEE PLAN AND SCHEDULE D (2) 3/4"0 BOLTS SEE ARCH FOR SCALE AT ROOF OVERBUILD •nR00F FRAMING SIMPSON LSTA12 AT 24" O.C. WITH (10) 10d x 3" NAILS SCL x CONT FASCIA , 2x6 BLO AT 24" EDGE NAI SCHEDUL SIMPSON ATTACH WITH (4) NAILS, A WITH (4) (2) ROWS BOUNDARY NO SCALE NAILING, SEE SCHEDULE EACH JOIST WITH .--'ice SIMPSON 'H1' EACH SIDE AT ROOF SHEATHING, EACH TRUSS. ATTACH TO SEE SCHEDULE SUPPORT BEAM WITH (4) ROOF JOIST, 8d x 2 1d2" NAILS, ATTACH SEE PLAN 8d XR1 1/ " NAIWITH LS (2) 2x T WOOD STUD WALLS, SEE PLAN AND SCHEDULE 1WALL SECTION AT DOUBLE NO SCALE SIM 2 1/4 1/2* x A2T� 3 LVL DRAG WALL SHEATHING, SEE SCHEDULE ROOF SHEATHING, SEE SCHEDULE (3) SIMPSON 'A34' ROOF JOISTS, EACH END OF SEE PLAN PREFABRICATED TRUSS BLOCKS WITH (8) BOUNDARY NAILING, 8d x 1.1/2" NAILS SEE SCHEDULE PREFABRICATED TRUSS 2x BEVELED BLOCK BLOCKS BETWEEN EACH BETWEEN EACH JOIST TRUSS SEE DETAIL M/S521 PREFABRICATED WOOD CUT ROOF JOIST DOWN TRUSS, SEE PLAN TO A 26 AT EAVE SEE ARCH FOR LINE OF DROPPED FASCIA AND SOFFIT CEILING, SEE ARCH SIMPSON 'H1' EACH SIMPSON 'A34' WITH TRUSS ATTACH TO TOP (12) 8d x 1 1/2" PLATES WITH (4) 8d x NAILS EACH BLOCK 2 1/2" NAILS, ATTACH TO TRUSSES WITH (6) EDGE NAILING, 8d x 1 1/2' NAILS SEE SCHEDULE WOOD STUD WALL, SEE (3) 2x TOP PLATES PLAN AND SCHEDULE BOUNDARY NAILING, SEE SCHEDULE SIMPSON 'A35' WITH ROOF SHEATHING, (12) 8d x 1 1/2' SEE SCHEDULE NAILS EACH BLOCK FULL DEPTH BLOCKING BETWEEN EACH JOIST SEE ARCH FOR FASCIA AND SOFFIT OUTLOOKER RAFTERS, SEE PLAN EDGE NAILING, SEE SCHEDULE SIMPSON 'A34' WITH (12) 8d x 1 1/2" NAILS EACH �—J WALL SHEATHING, SEE SCHEDULE EDGE NAILING, SEE SCHEDULE WOOD BEAM, SEE PLAN AND SCHEDULE SIMPSON 'LU24' EACH END - ATTACH TO BEAM WITH (4) 10d x 3" NAILS AND TO JOISTS WITH (2) 1 Od x 1 1/2" NAILS 1WOOD FRAMING NO SCALE ROOF SHEATHING, SEE SCHEDULE (3) SIMPSON 'A34' NO SCALE MM EACH JOIST WITH .--'ice s BLOCKS WITH (8) ►`�! ' ►z�l NAILS, (5) 10d x NAILS TO PREFABRICATED TRUSS JOIST ATTACH TO TOP BLOCK BETWEEN EACH BOUNDARY NAILING TRUSS SEE SCHEDULE I SIMPSON 'A34' WITH I.1 II (12) 8d x 1 1/2' LINE OF DROPPED I CEILING, SEE ARCH 8d x 1 1/2- NAILS SCHEDULE 1 SIMPSON 'H1' EACH 1 1 TRUSS ATTACH TO TOP EDGE NAILING, - PLATES WITH (4) 8d x SEE SCHEDULE 2 1/2* NAILS, ATTACH WOOD BEAM • I OVER BOTTOM CHORDS l WOOD SHEATHING, - 2x6xCONT1N000S (WHERE OCCURS) •11 SEE SCHEDULE 8 WOOD STUD WALL - NAILS EACH BLOCK I WOOD STUD WALL SEE SCHEDULE PLAN AND SCHEDULE /'� n►u nn� SIDE OF PIPE SUPPORT WOOD BEAM, SEE SIMPSON 'A35' WITH 52 (12) 8d x 1 1/2" PREFABRICATED FASCIA AND SOFFIT 3/8" x 4' STEEL STUDS WITH 16d AT BASKETBALL STANDARD SIMPSON 'LU24' EACH END 6" O.C. LEDGER TO SEE SCHEDULE (2) 2x T WOOD STUD WALLS, SEE PLAN AND SCHEDULE 1WALL SECTION AT DOUBLE NO SCALE SIM 2 1/4 1/2* x A2T� 3 LVL DRAG WALL SHEATHING, SEE SCHEDULE ROOF SHEATHING, SEE SCHEDULE (3) SIMPSON 'A34' ROOF JOISTS, EACH END OF SEE PLAN PREFABRICATED TRUSS BLOCKS WITH (8) BOUNDARY NAILING, 8d x 1.1/2" NAILS SEE SCHEDULE PREFABRICATED TRUSS 2x BEVELED BLOCK BLOCKS BETWEEN EACH BETWEEN EACH JOIST TRUSS SEE DETAIL M/S521 PREFABRICATED WOOD CUT ROOF JOIST DOWN TRUSS, SEE PLAN TO A 26 AT EAVE SEE ARCH FOR LINE OF DROPPED FASCIA AND SOFFIT CEILING, SEE ARCH SIMPSON 'H1' EACH SIMPSON 'A34' WITH TRUSS ATTACH TO TOP (12) 8d x 1 1/2" PLATES WITH (4) 8d x NAILS EACH BLOCK 2 1/2" NAILS, ATTACH TO TRUSSES WITH (6) EDGE NAILING, 8d x 1 1/2' NAILS SEE SCHEDULE WOOD STUD WALL, SEE (3) 2x TOP PLATES PLAN AND SCHEDULE BOUNDARY NAILING, SEE SCHEDULE SIMPSON 'A35' WITH ROOF SHEATHING, (12) 8d x 1 1/2' SEE SCHEDULE NAILS EACH BLOCK FULL DEPTH BLOCKING BETWEEN EACH JOIST SEE ARCH FOR FASCIA AND SOFFIT OUTLOOKER RAFTERS, SEE PLAN EDGE NAILING, SEE SCHEDULE SIMPSON 'A34' WITH (12) 8d x 1 1/2" NAILS EACH �—J WALL SHEATHING, SEE SCHEDULE EDGE NAILING, SEE SCHEDULE WOOD BEAM, SEE PLAN AND SCHEDULE SIMPSON 'LU24' EACH END - ATTACH TO BEAM WITH (4) 10d x 3" NAILS AND TO JOISTS WITH (2) 1 Od x 1 1/2" NAILS 1WOOD FRAMING NO SCALE ROOF SHEATHING, SEE SCHEDULE (3) SIMPSON 'A34' NO SCALE EACH END OF EACH JOIST WITH PREFABRICATED TRUSS EACH SIDE BLOCKS WITH (8) BETWEEN EA STUD WITH 8d x 1.1/2" NAILS NAILS, (5) 10d x NAILS TO PREFABRICATED TRUSS JOIST ATTACH TO TOP BLOCK BETWEEN EACH BOUNDARY NAILING TRUSS SEE SCHEDULE PREFABRICATED WOOD SIMPSON 'A34' WITH TRUSS, SEE PLAN (12) 8d x 1 1/2' LINE OF DROPPED NAILS EACH BLOCK CEILING, SEE ARCH 8d x 1 1/2- NAILS SCHEDULE SEE ARCH FOR - SIMPSON 'H1' EACH FASCIA AND SOFFIT TRUSS ATTACH TO TOP EDGE NAILING, - PLATES WITH (4) 8d x SEE SCHEDULE 2 1/2* NAILS, ATTACH WOOD BEAM TO TRUSSES WITH (6) OVER BOTTOM CHORDS 8d x 1 1/2' NAILS WOOD SHEATHING, - 2x6xCONT1N000S (WHERE OCCURS) SIMPSON 'A35' WITH SEE SCHEDULE (12) 8d x 1 1/2" WOOD STUD WALL - NAILS EACH BLOCK SEE PLAN AND WOOD STUD WALL SEE SCHEDULE PLAN AND SCHEDULE /'� n►u nn� BETWEEN PIPE SUPPORT BASKETBALL STANDARD SUPPORT DETAIL L AT ROOF STEP BOUNDARY NAILING, SEE SCHEDULE 202x CONTINUOUS LEDGER WITH (2) 16d AT 12" O.C. AND (3) 16d TO EACH TRUSS-/� � PSON 'LSU212L, NO SCALE (3) SIMPSON 'A34' EACH JOIST WITH EACH END OF EACH SIDE (6) 1Od x 3" FACE BETWEEN EA STUD WITH SIMPSON 'H1' EACH NAILS, (5) 10d x NAILS TO PREFABRICATED WOOD JOIST ATTACH TO TOP JOIST JOI ATTACH TO TRUSS WITH PLATES WITH 4 8d x ATTACH EDGE NAILING, SEE DETAIL M/S521 2 1/2 NAILS, SEE SCHEDULE EE ROOF SHEATHING, S\ TO JOIST WITH (6) BOUNDARY NAILING, NAILS EACH BLOCK 8d x 1 1/2- NAILS SCHEDULE / 1 2x BEVELED TOP PLATE WALL SHEATHI%-/ LINE OF DROPPED WITH 16d AT 6" O.C. SEE SCHEDULE OUTLOOKER RAFTERS, EDGE NAILING, WOOD BEAM WOOD SHEATHING, OVER BOTTOM CHORDS (WHERE OCCURS) SEE SCHEDU 2x6xCONT1N000S SEE PLAN AND SCHEDULE LEDGER WITH (3) 16d WALL SHEATHING, TO EACH STUD TO RAFTERS WITH (6) 2x BLOCKING BETWEEN STUDS WITH 1/4"x3 1/2" SIMPSON 'SDS' AT 6" O.C. LEDGER TO BLOCKS SIMPSON 'LUS 26' ATTACH TO LEDGER WITH (4) 1 O x 1 1/2" NAILS AND TO RAFTER WITH (4) 10d x 1 1/2" NAILS SIMPSON 'H1' EACH RAFTER ATTACH TO TOP PLATES WITH (4) 8d x 2 1/2" NAILS, ATTACH TO RAFTER WITH (6) 8d x 1 1/2" NAILS (3) 2x TOP PLATES WOOD STUD WALL, SEE PLAN AND SCHEDULE 2x4 SOFFIT JOISTS AT 2'-0" O.C. FULL DEPTH BLOCKING BETWEEN EACH TRUSS SEE DETAIL M/S521 ROOF SHEATHING SEE SCHEDULE PREFABRICATED WOOD TRUSS BOUNDARY NAILING, - SEE SCHEDULE SIMPSON 'LSU212' - EACH JOIST WITH (6) 1 O x 3" FACE NAILS, (5) 1 O x 1.1/2' NAILS TO JOIST ROOF SHEATHING SEE SCHEDULE , 11 7/8" x CONT SCL LEDGER WITH (3) ROWS FACE MOUNTED SIMPSON OF 1/4"x3 1/2" SIMPSON JOIST HANGER 'SDS' AT 6' O.C. WOOD BEAM (WHERE OCCURS) SEE PLAN AND SCHEDULE WOOD BEAM, SEE - PLAN AND SCHEDULE 2" STEEL WASHERS NO SCALE (3) SIMPSON 'A34' ``````���►�� EACH END OF EACH SIDE FULL DEPTH BLOCKING BETWEEN EA STUD WITH SIMPSON 'LUS 26' BOUNDARY NAILING, PREFABRICATED WOOD BETWEEN EACH JOIST SIMPSON A34 WITH ATTACH TO TRUSS WITH SEE SCHEDULE TRUSS BOTTOM CHORD SEE DETAIL M/S521 (12) 8d x 1 1/2" (4) 10d x 1 1/2" NAILS EE ROOF SHEATHING, S\ SEE SCHEDULE BOUNDARY NAILING, NAILS EACH BLOCK AND TO RAFTER WITH (4) 1Od x 1 1/2 NAILS SCHEDULE / 1 SEE SCHEDULE STUDS WITH 16d AT LINE OF DROPPED I I VdPPORTBEAM EXTEND OUTLOOKER RAFTERS, EDGE NAILING, ROOF SHEATHING, WOOD SHEATHING, OVER BOTTOM CHORDS SEE PLAN SEE SCHEDU SEE SCHEDULE - OF (6) TRUSS BOTTOM WALL SHEATHING, TO TRUSSES WITH (6) TO RAFTERS WITH (6) SEE SCHEDULE SEE ARCH FOR CHORDS d x 1 1/2" NAILS Q J SIDE OF PIPE SUPPORT WOOD BEAM, SEE SIMPSON 'A35' WITH 52 (12) 8d x 1 1/2" PREFABRICATED FASCIA AND SOFFIT 3/8" x 4' STEEL STUDS WITH 16d AT BASKETBALL STANDARD SIMPSON 'LU24' EACH END 6" O.C. LEDGER TO SEE SCHEDULE PIPE SUPPORT OVERBUILD TRUSSES, J HANGER PLATE AT PREFABRICATED WOOD N (4) 10d x 3" NAILS AND AT 2'-0" O.C. TRUSS, SEE PLAN SEE PLAN OUTLOOKER RAFTERS PIPE SUPPORT.WOOD - TRUSS, SEE PLAN 10d x 1 1/2" NAILS SEE PLAN AND SCHEDULE SEE SEE PLAN (2) 3/4"0 BOLTS SEE ARCH FOR TO BEAM AT ROOF OVERBUILD •nR00F FRAMING PLAN AND SC ED 3 2x TOP PLATES J ( ) TTHHROUGH HANGER PLATE FASCIA AND SOFFIT � BOUNDARY NAILING, ---. AT PIPE SUPPORT WITH EDGE NAILING,7 I SEE SCHEDULE 2" STEEL WASHERS SEE SCHEDULE (3) SIMPSON 'A34' ``````���►�� EACH END OF EACH SIDE SIMPSON 'H1' AT EACH BETWEEN EA STUD WITH BLOCKS WITH (8) RAFTER ATTACH TO TOP PREFABRICATED WOOD RAFTER ATTACH TO TOP PREFABRICATED TRUSS 5 BLOCKS BETWEEN TRUSS BOTTOM CHORD PLATES WITH (4) 8d x 2 1/2" NAILS, ATTACH Q EE ROOF SHEATHING, S\ SEE SCHEDULE 1/2- NAILS, ATTACH TRUSS, SEE PLAN 2x BLOCKING BETWEEN SCHEDULE 8d x 1 1/2" NAILS TO RAFTERS WITH (6) STUDS WITH 16d AT LINE OF DROPPED I I CEILING, SEE ARCH 8d x 1 1/2" NAILS SEE PLAN NAILING, SEE SCHEDULE WOOD SHEATHING, BLOCK TRUSS ATTACH TO TOP TRUSS WITH (4) x 1 1/2"NAILS AND PLATES WITH (4) 8d x (WHERE OCCURS) 2 1/2- NAILS, ATTACH WALL SHEATHING, TO TRUSSES WITH (6) TO RAFTERS WITH (6) SEE SCHEDULE 2x4 BLOCKING EACH SEE SCHEDULE d x 1 1/2" NAILS Q J SIDE OF PIPE SUPPORT WOOD BEAM, SEE SIMPSON 'A35' WITH 52 (12) 8d x 1 1/2" PLAN AND SCHEDULE LL SHEATHING, It��- STUDS WITH 16d AT BASKETBALL STANDARD SIMPSON 'LU24' EACH END 6" O.C. LEDGER TO SEE SCHEDULE PIPE SUPPORT ATTACH TO BEAM WITH 2x4 SOFFIT JOISTS PREFABRICATED WOOD N (4) 10d x 3" NAILS AND AT 2'-0" O.C. TRUSS, SEE PLAN TO JOISTS WITH (2) PREFABRICATED WOOD WOOD BEAM TRUSS, SEE PLAN (WHERE OCCURS) 10d x 1 1/2" NAILS SEE PLAN AND SCHEDULE STEP ��200F EDGE DETAIL WITH t PROOF TRUSS TO BEAM AT ROOF OVERBUILD •nR00F FRAMING NO SCALE v NO SCALE NO SCALE ROOF SHEATHING, SEE SCHEDULE BOUNDARY NAILING, SEE SCHEDULE EXTEND TRUSS TOP CHORD SEE ARCH FOR FASCIA AND SOFFIT WALL SHEATHING, SEE SCHEDULE EDGE NAILING, SEE SCHEDULE (3) 2x TOP PLATES WOOD STUD WALL, SEE PLAN AND SCHEDULE WOOD BEAM (WHERE OCCURS) SEE PLAN AND SCHEDULE BOUNDARY NAILING, SEE SCHEDULE SIMPSON 'LSU212' EACH JOIST WITH (6) 10d x 3" FACE NAILS, (5) 10d x 1.1 /2" NAILS TO JOIST ROOF SHEATHING, SEE SCHEDULE , ROOF JOIST, SEE PLAN 11 7/8" x CONT SCL LEDGER WITH (3) ROWS OF 1/4'x3 1/2" SIMPSON 'SDS' AT 6" O.C. WOOD BEAM (WHERE OCCURS) SEE PLAN AND SCHEDULE'S TROOP TO WALL CONNECTION AT ROW STEP PREFABRICATED WOOD TRUSS BLOCKING ROOF SHEATHING, SEE SCHEDULE PREFABRICATED TRUSS BLOCKS BETWEEN EACH TRUSS (3) SIMPSON 'A34' EACH END OF PREFABRICATED TRUSS BLOCKS WITH (8) 8d x 1.1/2" NAILS SIMPSON 'A35' WITH (12) 8d x 1 1/2" NAILS EACH BLOCK PREFABRICATED WOOD TRUSS, SEE PLAN SIMPSON 'H1' AT EACH TRUSS ATTACH TO TOP PLATES WITH (4) 8d x 2 1/2" NAILS, ATTACH TO TRUSSES WITH (6) 8d x 1 1/2" NAILS 11 7/8' SCL BLOCK BETWEEN EA STUD WITH SIMPSON 'A35' ON EACH END V Q W W IttZ W 0000,00 V� ':Z� � J 0 Q D W Q = V) ca IX Q 9501 E. 86th St. Indianapolis IN (317) 849-6992 fax (317) 849-6993 103 Wind Haven Nlcholsville KY (859)523-1500 fax(859)523-1514 Stamp: V NO SCALE (3) SIMPSON 'A34' ``````���►�� EACH END OF SIMPSON 'H1' AT EACH PREFABRICATED TRUSS BETWEEN EA STUD WITH BLOCKS WITH (8) RAFTER ATTACH TO TOP 8d x 1.1/2" NAILS M/S5 PREFABRICATED TRUSS 5 BLOCKS BETWEEN SEE PLAN TRUSSES 2 1/2" NAILS, ATTACH Q PREFABRICATED WOOD SEE SCHEDULE TO RAFTERS WITH (6) TRUSS, SEE PLAN 2x BLOCKING BETWEEN OUTLOOKER 8d x 1 1/2" NAILS 10 STUDS WITH 16d AT LINE OF DROPPED (2) ROWS BOUNDARY CEILING, SEE ARCH 6" O.C. LEDGER TO SEE PLAN NAILING, SEE SCHEDULE SIMPSON 'H1' EACH BLOCK TRUSS ATTACH TO TOP TRUSS WITH (4) x 1 1/2"NAILS AND PLATES WITH (4) 8d x 2 1/2" NAILS, ATTACH 2 1/2- NAILS, ATTACH TO TRUSSES WITH (6) TO RAFTERS WITH (6) 8d x 1 1/2" NAILS ROOF SHEATHING, E SCHEDULE �, t° d x 1 1/2" NAILS WOOD STUD WALL, SEE J PLAN AND SCHEDULE ROOF SHEATHING, SEE SIMPSON 'A35' WITH TRUSS, SEE PLAN (12) 8d x 1 1/2" NAILS EACH BLOCK LL SHEATHING, It��- STUDS WITH 16d AT (WHERE OCCURS) LLJ 6" O.C. LEDGER TO SEE SCHEDULE BLOCK 2x6xCONTTNOUS LEDGER N WITH (3) 16d TO EACH PREFABRICATED WOOD TRUSS BLOCKING ROOF SHEATHING, SEE SCHEDULE PREFABRICATED TRUSS BLOCKS BETWEEN EACH TRUSS (3) SIMPSON 'A34' EACH END OF PREFABRICATED TRUSS BLOCKS WITH (8) 8d x 1.1/2" NAILS SIMPSON 'A35' WITH (12) 8d x 1 1/2" NAILS EACH BLOCK PREFABRICATED WOOD TRUSS, SEE PLAN SIMPSON 'H1' AT EACH TRUSS ATTACH TO TOP PLATES WITH (4) 8d x 2 1/2" NAILS, ATTACH TO TRUSSES WITH (6) 8d x 1 1/2" NAILS 11 7/8' SCL BLOCK BETWEEN EA STUD WITH SIMPSON 'A35' ON EACH END V Q W W IttZ W 0000,00 V� ':Z� � J 0 Q D W Q = V) ca IX Q 9501 E. 86th St. Indianapolis IN (317) 849-6992 fax (317) 849-6993 103 Wind Haven Nlcholsville KY (859)523-1500 fax(859)523-1514 Stamp: V NO SCALE FULL ``````���►�� urrrr��10 SIMPSON 'H1' AT EACH � o BETWEEN EA STUD WITH EACH RAFTER, WITH RAFTER ATTACH TO TOP SIMPSON 'A35' ON M/S5 (8) 8dx1 1/2" NAILS o '• Z SEE PLAN BOUNDARY NAILING, 2 1/2" NAILS, ATTACH Q I It/ KING SIM d V NO SCALE FULL w 0 SIMPSON 'A34' BETWEEN SIMPSON 'H1' AT EACH 0 xx� BETWEEN EA STUD WITH EACH RAFTER, WITH RAFTER ATTACH TO TOP SIMPSON 'A35' ON M/S5 (8) 8dx1 1/2" NAILS PLATES WITH (4) 8d x ED SEE PLAN BOUNDARY NAILING, 2 1/2" NAILS, ATTACH Q I SEE SCHEDULE TO RAFTERS WITH (6) GE NAILING, 2x BLOCKING BETWEEN OUTLOOKER 8d x 1 1/2" NAILS 10 STUDS WITH 16d AT RAFTERS, (2) ROWS BOUNDARY Z 6" O.C. LEDGER TO SEE PLAN NAILING, SEE SCHEDULE SEE ARCH BLOCK SEE ARCH TRUSS WITH (4) x 1 1/2"NAILS AND WA 2 1/2" NAILS, ATTACH FOR FASCIA OUTLOOKER WITH (4) TO RAFTERS WITH (6) AND SOFFIT ROOF SHEATHING, E SCHEDULE It/ KING SIM d f FULL w 0 11 7/8' SCL BLOCK BLOC 0 xx� BETWEEN EA STUD WITH EACH L! - SIMPSON 'A35' ON M/S5 JOIST SEE EACH END ED SEE PLAN SE Q I SI (4) 10d x 1 1/2' NAILS GE NAILING, TO 10 E SCHEDULE H TO Z LINE OF SOFFIT, 10 LIJJ LSI SEE ARCH PLATES WITH (4) 8d x � TRUSS WITH (4) x 1 1/2"NAILS AND WA It/ KING SIM d f EACH RAFTER WITH (8) w 0 Z DEPTH 0 xx� B r -- /-, SIMPSON 'LUS 26' L! - UA ATTACH TO TRUSS WITH JOIST SEE 0 (4) 10d x 1 1/2" NAILS SEE PLAN 21 Q w Z (4) 10d x 1 1/2' NAILS GE NAILING, o SIMPSON 'H1' AT EACH E SCHEDULE H I--• Z RAFTER ATTACH TO TOP 'LUS26' ATTACH LIJJ LSI M PLATES WITH (4) 8d x � TRUSS WITH (4) x 1 1/2"NAILS AND oiS 2 1/2" NAILS, ATTACH Q OUTLOOKER WITH (4) TO RAFTERS WITH (6) Z L;1..I �, t° d x 1 1/2" NAILS Q J PREFABRICATED WOOD ROOF SHEATHING, SEE TRUSS, SEE PLAN SCHEDULE II 2x BLOCKING BETWEEN LL SHEATHING, It��- STUDS WITH 16d AT (WHERE OCCURS) LLJ SEE SCHEDULE WOOD BEAM (WHERE WOOD STUD WALLS, SEE OCCURS) SEE PLAN PLAN AND SCHEDULE AND SCHEDULE @'ALL SECTION AT DOUBLE —NCALE OS FULL DEPTH BLOCKING FULL DEPTH BLOCKING BTWN EACH JOIST ROOF SHEATHING, SEE 2x4 BLOCK BETWEEN BTWN EACH JOIST EACH OVERBUILD TRUSS EACH JOIST, SEE M S521 EACH JOIST, SEE M/S521 SCHEDULE WITH 16d T 4' 0 / DETAIL AT SIMPSON 'A34' BETWEEN w EACH RAFTER WITH (8) w 0 Z 8d x 1 1/2' NAILS 0 xx� SIMPSON 'LUS 26' L! - UA ATTACH TO TRUSS WITH S OVERBUILD TRUSSES 0 (4) 10d x 1 1/2" NAILS SEE PLAN AND TO RAFTER WITH Q w Z (4) 10d x 1 1/2' NAILS 0 o SIMPSON 'H1' AT EACH a Z H I--• Z RAFTER ATTACH TO TOP 0 LIJJ LSI M PLATES WITH (4) 8d x � G oiS 2 1/2" NAILS, ATTACH Q TO RAFTERS WITH (6) Z L;1..I �, t° 8d x 1 1/2" NAILS Q J PREFABRICATED WOOD ROOF SHEATHING, SEE TRUSS, SEE PLAN SCHEDULE II 2x BLOCKING BETWEEN WOOD SHEATHING, STUDS WITH 16d AT (WHERE OCCURS) LLJ 6" O.C. LEDGER TO SEE SCHEDULE BLOCK 2x6xCONTTNOUS LEDGER N WITH (3) 16d TO EACH STUD PREFABRICATED WOOD WOOD BEAM TRUSS, SEE PLAN (WHERE OCCURS) SEE PLAN AND SCHEDULE STEP ��200F EDGE DETAIL WITH t �L NO SCALE EDGE NAILING, SEE SCHEDULE, TYP 1 3/4" x 5 1/2" x CONTINUOUS LVL DRAG WALL SHEATHING, SEE SCHEDULE ROOF SHEATHING, SEE SCHEDULE SIMPSON 'A34' BETWEEN EACH RAFTER WITH (8) 8d x 1 1/2" NAILS SIMPSON 'LUS 26' ATTACH TO TRUSS WITH (4) 10d x 1 1/2" NAILS AND TO RAFTER WITH (4) 1 O x 1 1/2' NAILS SIMPSON 'H1' AT EACH RAFTER ATTACH TO TOP PLATES WITH (4) 8d x 2 1/2" NAILS, ATTACH TO RAFTERS WITH (6) 8d x 1 1/2" NAILS PREFABRICATED WOOD TRUSS, SEE PLAN 2x BLOCK BETWEEN EACH STUD 2x6 BLOCK BETWEEN EACH OVERBUILD TRUSS WITH 16d AT 4" O.C. 2x6xCONTINOUS LEDGER WITH (3) 16d TO EACH STUD WOOD BEAM (WHERE OCCURS) SEE PLAN AND SCHEDULE Q w w 0 Z 0 xx� Q 4-1 a� 'o UA H 0 LU = Q w Z L7 0 o a Z H I--• Z Z 0 LIJJ LSI 8 1--4 ad � G oiS Q Q U Z L;1..I �, t° Q J �CC G Z LLJ Project Number: 50049487510 Plan Series: IPF -SC -10-04 Property Number: 500-4948 Sheet Title: ROOF FRAMING DETAILS S523 � w 0 0 xx� 4-1 a� 'o UA CL V LU w 0 o �1 o Project Number: 50049487510 Plan Series: IPF -SC -10-04 Property Number: 500-4948 Sheet Title: ROOF FRAMING DETAILS S523 LU LU o � o U � a_ O L o N N J J � I ^ (0 N O to Project Number: 50049487510 Plan Series: IPF -SC -10-04 Property Number: 500-4948 Sheet Title: ROOF FRAMING DETAILS S523