Loading...
HomeMy WebLinkAboutA002UNEXCAVATED UNEXCAVATED BASEMENT POWER VENT GAS WH 76'-7" 48" B.C. 62 ' - 2 " 66 ' - 9 1 2 " 10'-612" 15'-2" 13'-612" 10'-9" 12'-0" 76'-7" 66 ' - 9 1 2 " 2' - 3 1 2 " 16 ' - 0 " 1' - 8 1 2 " 20 ' - 0 " 45 ' - 1 3 16 " 2x4 NOTCH SLOPE 3" FROM REAR TO FRONT FOR SLAB SUPPORT - SEE DETAIL 10/A2.1a HOLD T/ GARAGE SLAB DOWN 2" FROM T/ FDN. & SLOPE TO O.H. DOOR 6"thk. CONC. GARAGE SLAB - PROVIDE #4 RE-BARS @ 12"o.c. EA. WAY w/ MIN. 3" COVERAGE - REFER TO DTLS. 09 & 10/A2.1a 1'-312"9'-0" 1'-812" 33" x 33" x 15"d C.I.P. CONC. FOOTING - HOLD DOWN 3 12" FOR SLAB POUR THROUGH 12" x 20" GRADE BEAM - SEE DETAIL 06/A2.1a 24" x 24" PIER - DEPTH TO BEARING SOIL - SEE DTL. 09/A2.1a 36" x 36" x 8"d. C.I.P. CONCRETE FOOTING - SHOWN BELOW PIER - SEE DTL. 09/A2.1a 11 ' - 7 " TO ℄ OF ST L BE A M 13 ' - 5 1 4 " TO ℄ OF ST L BE A M 15 ' - 1 0 " TO ℄ OF ST L BE A M 19 ' - 7 3 4 " TO ℄ OF ST L BE A M BEARING WALL NOTE!!! - STUDS @ 19.2" o.c. IN LINE w/ JOIST ABOVE - DOUBLE T/ PLATE 5'-212" TO STAIR NOSING 10 ' - 1 1 2 " 2' - 8 " 5 1 2 " 31 ' - 0 1 2 " 24'-0" 38'-11" 26'-0" 12'-11" 12 ' - 0 " 48 ' - 6 " 10 " 18 ' - 5 1 2 " 10 " 20 ' - 3 1 2 " 8" 10" 12'-0" 10" 15 ' - 1 1 " HIGH EFF. GAS FURNACE w/ HUMIDIFIER 15'-11" TO FLOOR DRAIN 24 ' - 1 0 3 4 " TO F L O O R DR A I N 14'-7" 12 ' - 1 3 4 " 12 ' - 2 3 4 " 24 ' - 4 1 2 " 6' - 3 1 2 " 10 " 10 " 10 " 10" 10" 12'-11"8" 11'-812"11'-712" 26 ' - 1 " FOUNDATION / FOOTING PLAN01 SCALE: 1/4" = 1'-0" W8x18 STEEL BEAM W8x18 STEEL BEAM BEAM POCKET - 10"x4"x 8 18" DEEP 25'-638" ℄ OF DRAIN 5' - 1 0 " ℄ OF DR A I N 21'-712"29'-412" W8x28 STEEL BEAM HOLD T/ GARAGE SLAB DOWN 2" FROM T/ FDN. & SLOPE TO O.H. DOOR 8"thk. X 16"w SLAB BEARING WALL SUPPORT - DETAIL 04/A2.1a #4 RE-BAR @ 11" o.c. - SIDE TO SIDE #4 RE-BAR @ 18" o.c. - FRONT TO BACK - PLACED ABOVE SIDE TO SIDE BARS IN SLAB - PLACED BELOW FRONT TO BACK BARS IN SLAB 9'-812" 11'-3" TO ℄ STL. COLUMN 11'-414" TO ℄ STL. COLUMN 16'-134" TO ℄ STL. COLUMN 24" x 24" x 12"d C.I.P. CONC. FOOTING - HOLD DOWN 3 12" FOR SLAB POUR THROUGH (2) SILL P.T. SILL PLATES SIDE BY SIDE - SEE DETAIL 09/A6.024'-2" ℄ OF STL COLUMN 15 ' - 7 3 4 " 18 ' - 8 3 4 " 27" x 27" x 12"d C.I.P. CONC. FOOTING - HOLD DOWN 3 12" FOR SLAB POUR THROUGH  ‘ JD 67((/ &2/  ‘ JD 67((/ &2/  ‘ JD 67((/ &2/ 10'-612" WALL 08 A2.1 08 A2.1 3'-8" 1'- 4 " UP CARPET 1' - 8 1 2 " 5' - 8 1 2 " WA L L 4' - 7 1 2 " 3" LEDGE ON EACH SIDE OF DOOR FOR BEAM SUPPORT. - SEE DETAIL 06/A2.1a 8" 36" x 36" x 15"d C.I.P. CONC. FOOTING - HOLD DOWN 3 12" FOR SLAB POUR THROUGH 22'-714" TO ℄ OF STL COL. 21'-734" TO ℄ OF STL COL. 18'-314" TO ℄ OF STL COL. 12'-434" TO ℄ OF STL COL. 42" x 42" x 18"d C.I.P. CONC. FOOTING - HOLD DOWN 3 12" FOR SLAB POUR THROUGH  ‘ JD 67((/ &2/   ‘ JD 67((/ &2/ 33" x 33" x 15"d C.I.P. CONC. FOOTING - HOLD DOWN 3 12" FOR SLAB POUR THROUGH   ‘ JD 67((/ &2/ W8x28 STEEL BEAMW8x21 STEEL BEAM #4 RE-BAR STUBBED & LOOPED HOLD WALLS DOWN 3 1/2" CONTROL JOINT C O N T R O L JO I N T C O N T R O L JO I N T C O N T R O L JO I N T 10" C.I.P. CONCRETE FOUNDATION WALLS CONCRETE FOOTINGS 8" x 20" C.I.P. C O N T R O L JO I N T RADON PIPE - DETAIL 03/A2.1a W8x21 STEEL BEAM W8x18 STEEL BEAM 10" 10'-2" 15'-2" 12" x 20" GRADE BEAM - SEE DETAIL 06/A2.1 3" LEDGE ON EITHER SIDE OF DOOR FOR BEAM SUPPORT. - SEE DETAIL 06/A2.1 2" 15 ' - 1 1 1 2 " 18 ' - 5 1 2 " ELECTRICAL PANEL 8" 11'-4" 10 " 10 " 1'-4" W8x18 STEEL BEAM 24" x 24" PIER - DEPTH TO BEARING SOIL - SEE DTL. 09/A2.1 36" x 36" x 8"d. C.I.P. CONCRETE FOOTING - SHOWN BELOW PIER - SEE DTL. 09/A2.1 10 ' - 1 1 4 " 10 ' - 2 1 4 " 5'-8"5'-8" 24" x 24" x 12"d C.I.P. CONC. FOOTING - HOLD DOWN 3 12" FOR SLAB POUR THROUGH  ‘ JD 67((/ &2/ 42" x 42" x 18"d C.I.P. CONC. FOOTING - HOLD DOWN 3 12" FOR SLAB POUR THROUGH  ‘ JD 67((/ &2/  ‘ JD 67((/ &2/   ‘ JD 67((/ &2/ 36" x 36" x 15"d C.I.P. CONC. FOOTING - HOLD DOWN 3 12" FOR SLAB POUR THROUGH WELD BEAMS TOGETHER 6"thk. CONC. GARAGE SLAB w/ #4 RE-BAR @ 18" o.c. - LONG DIRECTION - MIN. 2" COVER w/ #4 RE-BAR @ 9" o.c. - SHORT DIRECTION - PLACED @ BTM. OF STEEL MAT - MIN. 3" COVER - SEE DTL's. 09 & 11/A2.1a 412" FOUNDATION WATER-PROOFING NOTES: 1. AN APPROVED WATERPROOFING MEMBRANE IS REQUIRED FOR ALL EXTERIOR FOUNDATION WALLS THAT ENCLOSE THE BASEMENT AREA & SHALL EXTEND FROM TOP OF THE FOOTING TO THE FINISHED GRADE. 2. JOINTS IN THE MEMBRANE SHALL BE LAPPED & SEALED WITH AN ADHESIVE COMPATIBLE WITH THE WATERPROOFING MEMBRANE. TION OF THE RADON EXHAUST PIPE IN THE HVAC CHASE AREA. 5. PLUMBER AND HVAC SUBCONTRACTOR TO COORDINATE THE INSTALLA- ABOVE THE SURFACE OF THE ROOF IN A LOCATION 10 FEET AWAY FROM VERTICALLY INTO THE SUB SLAB AGGREGATE AND THROUGH THE UP THROUGH THE BUILDING FLOORS & TERMINATE AT LEAST 12 INCHES ANY WINDOW OR OTHER OPENINGS INTO THE CONDITIONED SPACES OF OF VERTICAL DISTANCE WHERE THE VENT PASSES THROUGH THE ATTIC IN ADDITION, FISCHER HOMES WILL PROVIDE APPROXIMATELY 6 FEET SHEETING BEFORE THE SLAB IS POURED. THE PIPE SHALL BE EXTENDED THE BUILDING THAT IS LESS THAN 2 FEET BELOW THE EXHAUST POINT. 3. A 3 INCH DIAMETER SCH 40 PVC PLUMBING TEE SHALL BE EMBEDDED FOR THE POSSIBLE INSTALLATION OF A FUTURE EXHAUST FAN. NOTE: ALL FITTINGS ARE TO GLUED AND SECURED AS NEEDED. FISCHER HOMES RADON REDUCTION SYSTEM NOTES: THE FOLLOWING ITEMS ARE TO BE INSTALLED AS PART OF FISCHER HOMES RADON REDUCTION SYSTEM: 1. A UNIFORM LAYER OF CLEAN AGGREGATE AT A MINIMUM OF 4 INCHES UNDER THE CONCRETE SLAB. 2. A 6 MIL POLYETHYLENE OR EQUIVALENT FLEXIBLE SHEETING MATERIAL SHALL BE PLACED ON TOP OF THE GRAVEL. THE SHEETING SHALL FIT CLOSELY AROUND ANY PIPE, WIRE, OR OTHER PENETRATIONS OF THE MATERIAL. ALL PUNCTURES OR TEARS IN MATERIALS SHALL BE SEALED OR COVERED WITH ADDITIONAL SHEETING. 4. TO PROVIDE FOR FUTURE INSTALLATION OF AN ACTIVE SYSTEM, AN ELECTRICAL CIRCUIT TERMINATED IN AN APPROVED BOX SHALL BE INSTALLED DURING CONSTRUCTION IN THE ATTIC WITHIN 6'-0" OF THE RADON PIPE FOR THE POSSIBLE INSTALLATION OF A FUTURE EXHAUST FAN. FOUNDATION WALL NOTES: BASEMENT FOUNDATION WALLS BASEMENT FOUNDATION WALLS ARE TO BE 10"thk., 9'-0"h. OFF T/ FOOTING. FOOTINGS TO BE 20"w. GARAGE FOUNDATION WALLS GARAGE FOUNDATION WALLS TO BE 8"thk., 4'-0"h. OFF T/ FOOTING. FOOTINGS TO BE 18"w. FOUNDATION GENERAL NOTES: 1. PROVIDE CONTROL JOINTS IN SLAB @ ALL BEAM AND COLUMN ℄'s - AND AS NOTED 2. USE 6 MIL POLY VAPOR BARRIER UNDER BASEMENT AND GARAGE SLABS 3. USE PRESSURE-TREATED LUMBER @ ALL PLACES OF CONTACT w/ CONCRETE * UPGRADE INSULATION TO R-30 IN CEILING * UPGRADE INSULATION TO R-15 AT GARAGE WALLS * DRYWALL & TEXTURE ENTIRE GARAGE vs. INCLUDED FINISH ENERGY EFFICIENT PACKAGE NOTES: OPTION FOR 3-CAR GARAGE * UPGRADE TO INSULATED GARAGE DOOR(S) 2" 2" 2" 2" 3' - 1 1 " 7'-5"4'-6" 7' - 3 1 4 " 8'-1134" TO ℄ OF WET WALL WATER SOFT R/I EJECTOR PUMP FD 24" x 12" x 12" THICK C.I.P. CONCRETE COLUMN FOOTING - HOLD T/ FT'G. DOWN 3 12" FROM T/ SLAB 4' - 1 0 1 2 " INTAKE & EXHAUST 10" 10 " 8" 8" 1' - 9 1 4 " 39 ' - 3 3 4 " VERTICAL CONTROL JOINT - DETAIL 01/A2.1a DROP T/ FDN. 12" FOR SLAB POUR THROUGH 3'-014" 16'-214" 15'-314" ℄ OF DRAIN 7'-034" ℄ OF DRAIN 13 ' - 2 1 8 " 13 ' - 7 3 4 " 45'-612"31'-012" 4' - 0 " 48 B. C . 6'-1112"38'-7" 5040SL EGRESS -HOLD T/ WINDOW 10" BELOW T/ FDN. WALL VERTICAL CONTROL JOINT - SEE DTL. 01/A2.1a 1'-0" 5040SL -HOLD T/ WINDOW 10" BELOW T/ FDN. WALL 1'-0" 10 " 4'-314" 8" 7'-0" 8" FOR SUMP PUMP & PROVIDE OUTLETS NOTE!! BATTERY BACK-UP 48"" PERIMETER SLAB INSULATION 5'-1114" 18'-514" 10'-534" 9' - 2 " 48 " B. C . 15 ' - 0 " 40 " B. C . 10 ' - 0 " 32 " B. C . 12 ' - 0 " 24 " B. C . 10 ' - 0 " 16 " B. C . 6' - 0 " 9- 1 / 2 " B. C . 100AMP SUBPANEL 3' - 1 1 2 " GARAGE SERVICE DOOR ABV - MO: 37 1/2"w. x 12"d. - HOLD DOWN WALL 12" FOR SLAB POUR-THRU w/ 1" WEATHERLIP - SEE DTL 01/A2.1b 6' - 1 0 " 9- 1 / 2 " B. C . 6' - 7 3 4 " 16 " B. C . 8' - 6 7 16 " 32 " B. C . 8'- 0 " 40 " B. C . 6' - 2 1 8 " 48 " B. C . 18"Ø C.I.P. CONCRETE FT'G 6x6 P.T. POST - FLUSH w/ TOP OF DECK BEAM - ATTACH TO FOOTING w/ STANDOFF POST BASE - REFER TO DTL. 13/D6.0 11'-312" FROM ℄ FOOTING TO ℄ FOOTING 32'-734" 3' - 7 3 4 " TO ℄ FO O T I N G 6'-214" VERTICAL CONTROL JOINT - DETAIL 01/A2.1a 10 " 6'-214" 2' - 0 " NOTE: CONNECT F.D. IN AREA WELL TO SUMP PUMP -S.P. 10'-0" MAX. FROM DRAIN NOTE: FIELD VERIFY AREA WELL DIMENSIONS - STEPS TO HAVE 8" RISE AND 12" TREAD FD 6068 SGD REFER TO GENERAL NOTES FOR MASONRY OPENING SUMP PUMP W/ BATTERY BACK UP 4' - 0 " 36'' h. METAL HANDRAIL 6068SGD 04 A2.1b 2'-3" 32"w. x 23"h. HOPPER WINDOW HOLD T/ WDW TO T/ FDN. WALL 32"w. x 23"h. HOPPER WINDOW HOLD T/ WDW TO T/ FDN. WALL 10 ' - 0 " ± 4' - 8 " FO U N D A T I O N WA L L 1'-7316" ACTIVE W A S H E R D R Y E R NOTE: PROVIDE LOWER LEVEL LAUNDRY R/I 22 0 v 03A A6.1 0 3 C A 6 . 1 RE A S O N FO R PL O T : PL O T D A T E : 6 /1 4 /2 0 1 8 10 : 3 4 AM -- - - W I L L I A M L . K A U F H O L Z A R C H I T E C T Job No. Sheet No. IN NE W R E S I D E N C E FO R : HO M E S I T E NO . OF F I C E R E V I E W : M A S T E R BY : DA T E : C DA T E : FI S C H E R HO M E S I N D I A N A P O L I S II , LP 39 4 0 OL Y M P I C BL V D E R L A N G E R , KY 41 0 1 8 PH : (8 5 9 ) 34 1 - 4 7 0 9 F I E L D SP E C HO T L I N E : (8 5 9 ) 34 4 - 7 1 0 0 CO P Y R I G H T A L L RI G H T S R E S E R V E D FI S C H E R HO M E S , In c . JO B IN F O : DA T E : PR O J E C T CO O R D I N A T O R : PH O N E No : P E R M I T : S I G N -O F F : CO N S T R U C T I O N : RE V I S I O N : RE V I S I O N : RE V I S I O N : RE V I S I O N : HO M E TY P E : PL A N NO . E X T E R I O R : OBF-003 Ti m o t h y J. & Li n d s e y Wr i g h t 37 5 3 D U N E L L E N CI R C L E R O O K W O O D G 1 1 1 AM E R I C A N H E R I T A G E O v e r b r o o k Fa r m s Ca r m e l , IN 46 0 7 4 00 3 -- - - -- - - # 20 1 4 8 5 9 .3 4 4 .3 1 1 5 3 -2 5 -1 8 CH R I S T I N A BI S H O P 6 -1 1 -1 8 -- - - -- - - -- - - -- - - -- - - GR A N D E E S T A T E C O L L E C T I O N fi e l d s p e c c h a n g e @ f i s c h e r h o m e s . c o m R E V I S E D BY : # TE A M MA N A G E R : PH O N E No : 85 9 . 4 2 6 . 4 2 2 3 S H E Z Y R A SI S K O W I C A2.0 06/29/18 Adam Schriner