Loading...
HomeMy WebLinkAboutA0036'-114" POWER VENT GAS WH HIGH EFF. GAS FURNACE w/ HUMIDIFIER 2'- 10 " 2'- 1 0" 47'-634" 5'-0" 3'- 9 " 29'-012" TO NOSING 4" 2'- 9 1 2 " 15 ' - 3 " 4" 1' - 9 " 6'-3" 4'-10" 4'-534" FINISHED LOWER LEVEL PLAN - FRAMING PLAN01 SCALE: 1/4" = 1'-0" 17'-9" 16'-11" 24" PITCHED WOOD RAILING WOOD HANDRAIL V.PLKCPT. 1012" CONC.CPT. 18 ' - 0 1 2 " UP CARPET 11 ' - 2 " 3' - 1 1 " 3'-412" 6'-0" 2'-11" 7" 16 ' - 1 " 23'-612" 4" 7" 2 '-6 " 1' - 1 0 " 7" 312" BOX OUT AROUND COLUMN 17'-112" 5 1 2 " 15 ' - 1 " 4' - 3 " 15 ' - 3 1 2 " PAD CEILING DOWN AS NECESSARY - KEEP TO A MINIMUM (DETAIL 03/A2.2) 13'-11" 4" 4" 4" 4" 2' - 5 " 12 ' - 9 1 2 " DROP CEILING FOR HVAC & PLUMBING - 12" MAX FINISHED DROP - SEE DTL. 03/A2.2 WET BAR VINYL PLANK LL. BATH VINYL PLANK REC ROM CARPET UNFINISHED BASEMENT CONCRETE WATER SOFT R/I EJECTOR PUMP FD "EXTERIOR" FRAMED WALLS 2x4 PRESSURE TREATED SILL PLATES & PT 2x6 TOP PLATE, RIPPED TO 4", HELD TIGHT TO FOUNDATION WALL w/ 2x4 STUDS @ 24"o.c. w/ R-13 BATT INSULATION, VAPOR BARRIER & 12" FINISHED DRYWALL. PROVIDE PT 2x4 (SCRIBED VERTICALLY TO FOUNDATION WALL) STUDS EVERY 10'-0", FASTENED TO 2x4 WALL STUDS FOR HORIZONTAL FIRE BLOCKING. "INTERIOR" FRAMED WALLS 2x4 PRESSURE TREATED SILL PLATES & 2x4 TOP PLATES w/ 2x4 STUDS @ 24"o.c. w/ 12"DRYWALL ON FINISHED SIDE ONLY. CPT.V.PLANK SCALE:3/4" = 1'-0" 3 ' - 5 1 2 " H A L F W A L L H E I G H T COVE MOULD - BOTH SIDES 312" 1 78" NOTE INSTALL OUTLETS & SWITCHES HORIZONTAL - w/ CERAMIC TILE BACKSPLASH 2x4 FRAME WALL - w/ DRYWALL FINISH BASE CABINET COUNTERTOP COUNTERTOP PROVIDE 34" BLOCKS IF HARDWOOD FLOORING IS SELECTED VARIES REFER TO PLAN SECT - DINING COUNTER02 SCALE: FLOOR JOISTS @ 19.2" o.c. 1" =1'-0" DETAIL - BASEMENT DUCT DROP 2x2 LADDER @ 24" o.c. 2x4 LADDER @ 24" o.c. 1/2" DRYWALL 1 1 1 8 " ± T O T / S L A B ( M I N . 6 ' - 4 " ) WIDTH VARIES - REFER TO PLAN SUPPLY AIR DUCT RETURN AIR DUCT DUCT LOCATION VARIES - REFER TO PLAN 03 P L U M B E R ' S N O T E ! P R O V I D E R O U G H - I N F O R I C E M A K E R 8'-6" 312" 10 ' - 2 1 2 "2'-512" 5'-612" 3' - 0 " 4" 4" 4" 2'-1 0" CPT.V.PLANK 1'-11" 2'-10" 2 '-8 " 5'-0" 3' - 9 " 1'- 9 " 3' - 8 1 2 " 512" 6'-0" 6'-214" 1'- 4 " 4" L.L. BEDROOM CARPET 5 1 2 " 3' - 1 1 " 9' - 8 " 10 1 2 " 2' - 6 1 2 " 4'- 0 1 2 " 3' - 8 " 1'-1034" 10'-312" W.I.C. CARPET NOTE: STERLING 'ENSEMBLE' BATH/SHOWER SYSTEM CERAMIC TILE SURROUND - SEE DTL. FOR FRAMING CENTERLINES 04/A2.2 NOTE: 24" h. HALF WALL w/ CERAMIC TILE WRAP NOTE: 60" x 34" SHOWER PAN w/ CERAMIC SURROUND & 2-SIDED SHOWER TILE TO CEILING ENCLOSURE w/ BI-PASS DOOR - w/ 1714"h. PLATFORM FOOT LEDGE - SLOPE TILE 14" MIN. TO SHOWER FLOOR - 3-1/2" x 4-1/2" CERAMIC TILE LEDGE - SEE DTL. 05/A2.2 - SEE DTL. 06/A2.2 3 ' - 7 1 2 " ACCORDING TO EXTERIOR WALL FRAMINGADDITIONAL WALL STUDS WILL VARY FRAMER's NOTE! 2 0 1 4 " 4 " 834" 4 " 1 ' - 0 1 4 " 2 ' - 4 1 4 " DTL - STERLING 'ENSEMBLE' 42"OVAL BATH FRAMING SCALE: 4'-10 12" 5'-0" 1/2" = 1'-0" ℄ ℄ ℄ ℄ ℄ ℄ ℄ ℄ 04 CERAMIC TILE 2x4 SEAT FRAMING @ 12" o.c. CERAMIC TILE 2x4 FRAME WALL WATERPROOF MEMBRANE 12" TILE BACKERBOARD - NO OSB ON SEAT OR WALL FRAMING VARIES SEE PLAN SECT - SHOWER SEAT SCALE:3/4" = 1'-0" 1 ' - 5 1 2 " H T . @ B A C K O F S E A T 1 ' - 5 1 4 " H T . @ F R N T O F S E A T 2x4 FRAMING @ 12" o.c. - SLOPE FRAMING 14" MIN. NOTE: 12" TILE BACKER BOARD TO BE INSTALLED BY DRYWALL SUBCONTRACTOR ON SHOWER SEAT & WALL 05 GLASS ENCLOSURE 2x4 FRAME WALL @ 12" o.c. SHOWER PAN HALF WALL / TUB SECTION - SHOWER SCALE: 3/4" = 1'-0" 2 ' - 0 " CERAMIC TILE WATERPROOF MEMBRANE 12" TILE BACKERBOARD - NO OSB ON SEAT OR WALL FRAMING NOTE: 12" TILE BACKER BOARD TO BE INSTALLED BY DRYWALL SUBCONTRACTOR ON TOP & SIDES OF HALF WALL LINE OF TUB 06 2" 2 ' - 0 "1'- 5 " 3'-0" 2' - 8 1 2 " 1' - 1 0 " 3 1 2 " 6'-214" 1'-9" 11'-812" 10 ' - 6 " 2x4 FRAME WALL 41.5"h. HALF WALL - SEE DTL. 02/A2.2 FD SUMP PUMP W/ BATTERY BACK UP 22 0 v - CERAMIC TILE TO CLG. NOTE: PROVIDE 2x10 BLOCKING ABOVE SHOWER MUD PAN FOR BACKER BOARD W I L L I A M L . K A U F H O L Z A R C H I T E C T RE A S O N FO R P L O T : P L O T DA T E : Job No. Sheet No. IN NE W R E S I D E N C E FO R : HO M E S I T E NO . OF F I C E R E V I E W : M A S T E R BY : DA T E : C DA T E : F I S C H E R HO M E S I N D I A N A P O L I S II , LP 66 0 2 E 75 T H S T R E E T SU I T E 40 0 I N D I A N A P O L I S , IN 46 2 5 0 31 7 . 3 4 8 . 2 5 0 0 F I E L D SP E C HO T L I N E : (8 5 9 ) 34 4 - 7 1 0 0 CO P Y R I G H T A L L RI G H T S R E S E R V E D F I S C H E R HO M E S , In c . JO B IN F O : DA T E : PR O J E C T CO O R D I N A T O R : PH O N E No : P E R M I T : S I G N -O F F : C O N S T R U C T I O N : RE V I S I O N : RE V I S I O N : RE V I S I O N : RE V I S I O N : HO M E TY P E : PL A N NO . E X T E R I O R : 6/ 1 4 / 2 0 1 8 10 : 3 4 AM -- - - OBF-003 Ti m o t h y J. & Li n d s e y Wr i g h t 37 5 3 D U N E L L E N CI R C L E R O O K W O O D G 1 1 1 AM E R I C A N HE R I T A G E O v e r b r o o k Fa r m s Ca r m e l , IN 46 0 7 4 00 3 -- - - -- - - # 20 1 4 8 5 9 .3 4 4 .3 1 1 5 3 -2 5 -1 8 CH R I S T I N A BI S H O P 02 / 0 6 / 1 8 -- - - -- - - -- - - -- - - GR A N D E E S T A T E C O L L E C T I O N fi e l d s p e c c h a n g e @ f i s c h e r h o m e s . c o m R E V I S E D BY : # TE A M MA N A G E R : PH O N E No : 85 9 . 4 2 6 . 4 2 2 3 S H E Z Y R A SI S K O W I C A2.2 06/29/18 Adam Schriner