Loading...
HomeMy WebLinkAbout1THIS INSTRUMENT PREPARED BY: DAVID J. STOEPPELWERTH STOEPPELWERTH AND ASSOCIATES INC. 9940 ALLISONVILLE ROAD FISHERS, INDIANA 46038 PHONE: (317)-849-5935 FAX: (317)-849-5942 DEVELOPED BY: CHESWICK CORPORATION P.O. BOX 553 CARMEL. INDIANA 46032 SUBMISSION DATE: 6/16/97 SOURCE OF TITLE: WARRENTY DEED INSTRUMENT # 86-27577 David J. stoeppelwerth Registered Land Surveyor No. SO474 No. 50474 - STATE OF Ikk 9.1 Commission's Certificate: Under Authority provided by Chapter 174. Acts of 1947, enacted by the General Assembly of the State of Indiana, and all acts amendatory thereto, and an ordinance adopted by the Common Council of the City of Cartmel, Indiana. This plat was given approval by the City of Carmel, as follows: Adopted by the Carmel City Plan Commission at a meeting held 25 fflo D.U.&S.S.E. D.U.&S.E. D.&U.E. L.M.A.E. S.L.E. B.L. N.R. • UWAK INILM I OF UUMMUNITY SERVICES LOT NUMBER LOT ADDRESS DRAINAGE. UTILITY do SANITARY SEWER EASEMENT DRAINAGE UTILITY alt SEWER EASEMENT DRAINAGE & UTILITY EASEMENT LANDSCAPE. MAINTENANCE ACCESS EASEMENT SIGN LANDSCAPE EASEMENT BUILDING UNE NON RADIAL MONUMENTS DENOTES A "COPPERWELIY 5/8' DIA.STEEL ROD 12" LONG WITH 1-1/2" DIA. TAPERED BRASS CAP HAVING A CUT 'X` IN TOP SET FLUSH WITH THE FINISH STREET SURFACE. DENOTES A 4'X46X36" LONG PRECAST CONCRETE MONUMENT WITH A CROSS CAST IN THE TOP TO BE SET WITH THE FINISH GRADE. �W M 3Z Ui 00 Uj Z N 'J N l— U LLJ N89'49'31 "W 5. W. (;UK. Z). W. 1/4 SEC. 22-T18N-R3E CHESWICK PLACE SECTION 4 SECONDARY PLAT CURVE TABLE 1 inch - 50 ft. CURVE RADIUS LENGTH TANGENT CHORD BEARING DELTA C-33 100.00 157.08 100.00 141.42 S4449 31 E 90.00 00 C-34 30.00 21.90 11.47 21.42 N32'02 20 W I 41'49 59 SOUTH LINE S.W. 1/4 SEC. 22-T18N-R3E XO 000, fV�-00 000 1 00 ! F 150 `� ! 44, 05. sq. ft. 0 ! w W ! li z 2'35'15"W Q6.02' NN -04'33"W 2,N4' S? StQ, N89.49'31 "W �♦ 18.95' LLJ ♦ CF) N O O O O O Z SHEET 1 OF 2 THIS INSTRUMENT PREPARED BY: DAVID J. STOEPPELWERTH STOEPPELWERTH AND ASSOCIATES INC. 9940 ALLISONVILLE ROAD FISHERS, INDIANA 46038 PHONE: (317)-849-5935 FAX: (317)-849-5942 DEVELOPED BY: CHESWICK CORPORATION P.O. BOX 553 CARMEL, INDIANA 46032 SUBMISSION DATE: 6/18/97 SOURCE OF TiTLE: WARRENTY DEED INSTRUMENT 86-27577 Cheswick Place Section Four I, the undersigned Registered Land Surveyor, hereby certify that the included plat correctly represents a subdivision of a part of the Southwest Quarter of Section 22. Township 18 North, Range 3 East In Hampton County, Indiana, being more particularly described as follows: Beginning at a stone marked with an "X" marking the Southwest comer of said Quarter Section; thence South 89 degrees 49 minutes 31 seconds East along the South line of said Southwest Quarter Section 848.57 feet to the Southwest corner of Cheswick Place, Section 1, recorded as Instrument /9439694, Plot Cabinet No. 1, Slide No. 465 in the Office of the Recorder of Hamilton County, Indiana, thence North 00 degrees 10 minutes 29 seconds East along the Westem boundary of said Cheswick Place. Section 1; 40.00 feet to the Southern boundary of Cheswick Place, Section 2, recorded as Instrument #9633942, Plat Cabinet No. 1, Slide No. 702 in the Office of the Recorder of Hamilton County, Indiana; the following (11) courses are along the Western boundary of said Cheswick Place, Section 2; (1) North 89 degrees 49 minutes 31 seconds West 18.95 feet; (2) North 48 degrees 40 minutes 51 seconds West 82.85 feet; (3) North 80 degrees 04 minutes 33 seconds West 24.54 feet; (4) North 42 degrees 35 minutes 15 seconds West 26.02 feet; (5) North 07 degrees 56 minutes 59 seconds East 186.41 feet; (6) North 48 degrees 51 minutes 45 seconds West 178.95 feet; (7) South 75 degrees 56 minutes 07 seconds West 136.29 feet; (8) South 65 degrees 41 minutes 06 seconds West 67.98 feet; (9) South Be degrees 34 minutes 18 seconds West 1012 feet; (10) North 63 degrees 24 minutes 44 seconds West 32.38 feet; (11) North 38 degr ts 06 minutes 44 seconds West 104.02 feet. thence South 01 degrees 00 minutes 48 sec ands West 239.84 feet; thence North 89 degrees 49 minutes 31 seconds West 220.00 fe it to a point on the West line of said Southwest Quarter Section; thence South 01 degrees 00 minutes 48 seconds West along the aforesaid West line 211.50 feet to the place of beginning containing 5.740 acres, more or less. Subject to all legal highways, rights—ofl—woy, easements and restrictions of record. This subdivision consists of 5 lots numbered 149-153 ( boh inclusive). The size of lots and widths of streets are shown in feet and decimal parts thensf. The subdivision boundaries were determined by a survey prepared by Nolan and Gibson Corporation dated October 14, 1986. Witness my signature this METES/1245OS4 R: SCS F: GBR day of , 1997. David J. Stoeppelwerth Registered Land Surveyor No. SO474 auauurrra,,����,',', - No. - SO474 STATE OF ,?*filar Ir l x %00% 9.1 Commission's Certificate: Under Authority provided by Chapter 174. Acts of 1947, enacted by the General Assembly of the State of Indiana, and all acts amendatory thereto, and on ordinance adopted by the Common Council of the City of Carmel, Indiana. This plat was given approval by the City of Carmel, as follows: Adopted by the Carmel City Plan Commission at a meeting held DEPARTMENT OF COMMUNITY SERVICES DEPARTMENT OF COMMUNITY DEVELOPMENT 9.2 Registered Land Surveyor's Certificate: I. David J. Stoeppelwerth, hereby certify that 1 am a Registered Land Surveyor, licensed in compliance with the Iowa of the State of Indiana. That all the monuments shown thereon actually exist and that the location, size, type and material are accurately shown: And that all requirements specified in the subdivision ordinance of the City of Carmel have been met. David J. Stoepplwerth 50474 ed Land Surveyor 9.4 Board of County Commissioners Certificate: Under authority provided by Chapter 47. Acts of 1951, enacted. b tin- 0,c,�leral Assembly of the State of Indiana, and all acts amendatory thereto, this plat eros r,& apprmol by the Board of County Commissioners of Hamilton County, Indiana at a meeting hello ':,is _,. day of Steven C. DNlinger Steven A. Holt , 19 BOARD OF COMMISSIONERS OF HAMILTON CG: CITY, INDIANA Auditor Sharon R. Clark This subdMalon shoes be known and designated as Cheswiok Platy. Section 4. a subdivision in Hamilton County, kMlana. AN Streets shorn and not WOW* dedfooted, are hereby dedicated to the public. This plat is subject to the declaration of covenants, owAltlora and restriction of Cheswick Place recorded as Msirunwt No. 9439693 and any arnendrnsnts thwrto. In Testimony whereof, witness the signature of Owner and Dsdarant this day of ,1997. Owner Cheswick Carporation Jaynes A. Cako, Prssidsnt Before me, the undwsWAK a Notary Public In and for sold County and Stats. Personally appeared James A. Calto and odmowbdgsd the execution of this instrument as his voluntary act and deed and affixed his signature thereto. Witness my signature and sed this day of County of Residence: _ My commission expires: METES/19584WC NOV 21. 1994 Notary Public .1997. :�``,`,, ,• ',,,'mss 50474 STATE OF IIgAM i 1 141W 3TREETCrA j 1 wmA or --- . \ GA of CrA 0 0 1 O c (� tG CrA or Or CrA SI=CTION 4 or n --�1 c ? I o` M � } ,� �"`� I I GA Or Developed by "' •" CrA CrA or 1 p,. I — ,,� 1 e • f1�1� mmC= CrA G Or CrA CHESWICK CORPORATION CIA or CrA MWMRC CrA 1 t / a P*O* 3TREET _ CARMEL, INDIANA 46032 I i LOCATION MAP SOILS MAP 317 873-0550 i CrA CROSBY Br BROOKSTON i 141 st STREET OPERATOR ON N.O.I. LETTER: JAMES A. CAITO 11685 BRADFORD PLACE .-- CARMEL, INDIANA 46033 PHONE: (317)-844-0099 .i G 1 � INDEX f SHT. DESCRIPTION -------------------------- 1 COVER SHEET 0 , i 2 TOPOGRAPHICAL SURVEY _ 1 3 SITE DEVELOPMENT PLAN O 4 EROSION CONTROL PLAN ►_V— ,�jO 5 EROSION CONTROL SPECIFICATIONS v I DESIGN DATA i 6 STREET PLAN & PROFILES _ 5 LOTS 0.87 LOTS/ACRE 7 INTERSECTION & ENTRANCE DETAILS � 5.740 AC. 8 TRAFFIC CONTROL PLAN t PLAT MAP HENLEY CIRCLE 345.77 L.F. 9 SANITARY SEWER PLAN --�------�SCALE: 1'=200" I 10 STORM SEWER PLAN ac PROFILE 11 WATER DISTRIBUTION PLAN / 12 TRAFFIC MAINTENANCE PLAN 13 CONSTRUCTION DETAILS 14 CONSTRUCTION DETAILS 15 CONSTRUCTION DETAILS i PLANS PREPARED 13Y.- REVISIONS Y:REVISIONS STOEPPELWERTH SHT. DESCRIPTION & ASSOCIATES, INC. I ALL REV. PER TAC COMMENTS 8/21/97 SCS� CONSULTING ENGINEERS & LAND SURVEYORS 9940 ALLI SON VI LLE ROAD G Q FISHERS, INDIANA 46038 ciPHONE: (317)-849-5935 _.- ..% FAX: (317)-849-5942 F 'iED 1 AUG 2 2 W7 En cnI cn .G PLANS CERTIFIED BY: N 7/18/97 DAVID J. STOEPPELWERTH DATE i 152 151 I `---- w `� PROFESSIONAL ENGINEER 150 �.�� w NO. 19358 > 153 HEN cn LEY CIR. 149 19358 En crAT! CF i Cu WEST 136th STREET •` 0 Its f �Q` e►c+�.�v "�� ' 887.88 886.93 \` \ \ �� `fes ! I IS ."`� S� IN P X T rd I I Q $$ ``�'f/` �.• � / � F`� T.C.=888. •-.•' 887.42 \ \ \ I ``w` j ,- l l� _---. \ 1 qp rj $. 7.73 \ \ 7 !`o`a /� Lr �� ._ '+.• \ � 43 rd ,j ) 12 vp /� ANH "" C alk tr\ X. N '��`\aq�' .N•= i2. 2 O -+—,\ \ / • �y G 09 • /..+G r ` INV.=8V1 INV --875- N. ! f INV. 875.62 S. 80 INV.=877.27 N.W. 4'1 � r cp.. r S 49 884.17 1100 YR. FLOODWAY PER 1HEC 2 DATED 3/25/96- 31, 4• 54 no • 0 .804.76 ____ .. _____.. � � � � � � / � � J % � `� � b � + WD W ' ' ' as ► f ! L' �, ( W 00 D 130 cj 00 05.47 894.50 � cr 00 x -MAN 1 / EXI I �X• ANHOLE .-89276 EXIS1iNC"--�' X. AN &S�1N� INV. -873.55 E WYE N LAT. INV.=8726 WYE do LAT. / _ , WYE 8 �►T. k 893.34 `, g91.OD IN!✓871t,8'4 E.� t I INV. -157&75 &W. EX 10" % IN W X. MANN \ EX. 10" �T INV =871. W. LAT ` EX 1 T.C.-593.54 S43 �-- AMERITECH 1NV.=874.78 N.E. _ INV. -874.78 N. s \ E Ta ____ T —L_"_ T T --—_ T 1�� �• ' ! -- \ �. �` . INV. W. c�` --/ T3 T T3 v T T T T 1T 'T T �, � T V \\ EX. 10" s�3 19 .C. 8 EX. HYDRANT r '� 8a , EX. Tb4PHONE CABLE \ �` 4 893.61 993.88 / X• HYDRAI)i 1 �c " F- a9 �- 0 0--..,,�N T 'T � EX. WATERMAIN 1 P �\�-- w W W w w W w w W �I .�_ W W--�T—�Vj w W_ _ w w--� w 1 �yy `' w 1 INV.= .ai w •M `� `' r r - / ABLE \ •_ ,� `.,key ti EX. T. G 9 3 CATYJ -.,�,� CT 89&71 7 T CATV3 �. 1y "' LAW J. '." -"' 1 wla— A3 1 STONE OR' Age \ 1Y \ \\ A3 INV.= P �� ( f� '.x.�-+•6�f1«--,�93,9a I I Y-- X X9~4- X-•—b5rt----�fl�i X 2 1 1 G h N3 \ � A + f3 F3 l F3 FJ Fa \ I v� B��lJ4 89279 I �� 9313 f % 0 1 \ \ •�c� 11 \ 4 89+.88 1f j3' 2 37 995.01 " ! I 185FT1 zta �•' j y 1f7,3>� /� % y 882.07 I '' _ AO.23 cj cn t` CD cn - a 0 0 r cn 0 n a i 3 1 I � No. STATE OF Ike �M SCALE: 1 "= 50' T.B.M. #5 R.R. SPIKE SET IN E. SIDE OF PWP. ON E. SIDE OF DITCH ROAD. 1ST POLE SOUTH OF HENRY DITCH ® CROSSING WITH DITCH ROAD. ELEV. = 889.20 m C) an I 00 n M u- n 00 0 0 00 y M an OD M v SHEET N0. 2 o� 15 mcm 4' No' 12450 n Z Q D Z LLI Z > O U r� V / W V / W U U nZ 1..L Q Y 0 U O O V) w U LSI Q SHEET N0. 2 o� 15 mcm 4' No' 12450 n M_ CV CV CM a .rn C- U- LU - U - w 0 a Q i v Cn / 0 -;n ru .-r 2 / / LL - SCALE: 1"= 50' LEGEND Type -a�a --- --- EXISTING CONTOUR EXISTING SANITARY SEWER .� y ---o-- -- EXISTING STORM SEWER ® PROPOSED GRADE �•-- PROPOSED CONTOUR PROPOSED SANITARY SEWER PROPOSED STORM SEWER PROPOSED SWALE PROPOSED 4' SIDEWALK (BY HOME BUILDER) 35 LOT NUMBER 853.0 PAD ELEVATION PAD SIZE 60'x75' DENOTES PADS OF 2'-0" OF FiLL OR MORE PROPOSED 6" UNDERDRAINS 4" S.S.D. TO EACH LOT T.B.M. #5 R.R. SPIKE SET IN E. SIDE OF PWP. ON E. SIDE OF DITCH ROAD. 1ST POLE SOUTH OF HENRY DITCH ® CROSSING WITH DITCH ROAD. ELEV.= 889.20 EARIHW0W- 1. EXCAVATION A. Excavated material that M suitable may be used far Ahs. AM unsuitable material and all surplus mwvatad material not required shah be i a from the site. B• Provide and place any additional AI material from offsite quality as be l�orrto produce the grades sh and the source app a- by thFile obtained It will be the nspadxffi be nsiisllty of tractor for aMe ann caste for fill needed 2. REMOVAL OF TREES A. AM tress and stumps from aro to be occupied by a rood surface area Tress and stumps dM not be buried an site. 3. PROTECTION OF TREES A. The Contractor shall. at the direction of the Developer, endeavor to saw and protect tees of value and worth which do not k*4* construction of Improvements as designed S. In the event out or fill exceeds 0.5 foot over the root area, the Developer shall be consulted with respect of protective nmxmwe to be tdmk N any, to pow ei such trees 4. REMOVAL OF TOPSOIL A. All topsoil shall be removed from all areas to be excavated or filled. Topeoil should be stored at a location where it will not interfere with construction operations. The topsoll shall be free of debris and stones. a. UTWM A. Rules and regulation governing the respective udity shall be observed in executing all work under this section. B• It shill be the responsibility of the Contractor to determine the location of exleting underground u9itles 2 working days prior to oornrmencing work For utMRy locations to be marked call Toll Fres 1-800-362-5644 wRhln Indiana a 1-800-428-6200 outside Indiana. 6. SITE ORAOING A. Do all cutting. Ming, compacting of Ale and rough grading required to bring entire project area to a6grade as shown an the drawing. L The tolerance for paced area shah not exceed 1110 feet above established sulWods. AM other areas shall not exceed 1110 fest plus or minus the elrtablished grads. Pravkds roundlege at top and bottom of banks and other breaks in grads. C. The Engineer shah be notified when the Contractor has reached the tolerance as stabil above. so that field meauervmte and spot slevotbne can be verif ed by the Engineer. The Contractor shall not remove his equipment f turn the este and the Engineer has verified that the job mesh the above talw+ana. FORM\EARTHMRi( Qin, \ ' `� ` L+` f\,44yrN•Y" .rte \ y \' MANHOLE' rI �F A?�,'f ___� ~�'INN, \ 11 INV.=88926 EX, OJ R9 N E85 90 N k ��� \ , �� �/ o I INV.= NV. a$&4r..._Y. \ `� . / INV. 8 2 49 �• / = r STI 6C P �'� +a 0 ! i 15.1 r r G \ w . `� NN P L G � P• G f ,'`,, ,�, , � f'/'}1�(��]1.�� � \, ,.�' ,�'Y. ',� 1 �/�,p�Eti �y�� f PT' il� � J i •~`` ,,� $,$5, 90 \ 1` I T.B, A, #5 `, `�4\�1L , T �� .. ° � _ ! �'4" 47' j _ C �� ` f �7 o t87.95�� `.,� :w... NOTE: r" - - �, r, G/G if I� �,� / ~� 866,93 4 ti ) f S \ �+' f ,��uuuw•►•� l35 N9 ti . '' I / I \ a \ X, CU . TNI-F.T r i G N , h ALL fiEBRiS AN( BSTRUCTiONS WILL'`" �'� a I �g, .�... ' 4ti T.81 C.=888. �• 887�028E REMOVED FOM TOP OF QANiZ✓ �` r' - ` TO TAP OF ANK'ALONG- HtNLEYCRW. I - �-- \ ��� o 'C �`�\`,� �' 9 9 G B.lGIi7.?3 ' �. �iy f •�. i-"� �a \ �k� 1 / / �� "'��_19358 k �� ��`� k•sK r OgDWA �'` 1 4k q3 . / / , SQA72 N'`� \ , c ___. _ �N I"'"� / a =h7lE , EX, MANHOLE �- , \ k 95 -" - `` '`� �� fl r t+` 894,64 �y �r' , 11.11 '' + \ U l �� r`, 41 T.C.=892.72 G +,• G .,--- � ` W INV. -875.72 N. ! 1 1' .��ti �' ``�``•, -rr ."" % ry E-,-,CONC. END SECTION `Soo INV. -875.62 S. ' •'� " ` „. �\ ,r `\, \._.._. .._.�.. _,....._,.�.-•-I/ � r INV. -877.27 N,W- GoLee - �` y INV. 81.39 NN-,r� 0000 r--- •-----.. � \ ` � �..`�.� ���=� x.78 At�/IMP- 8899&71CP ! f -• ✓�' _ .. �, ,ti,. \`\ \`" 0Ah r �� �` ` o \ \ i �.,h C tA 00 \`\ 1 y E 00 YR.AY PER 3 a95,G3 - '� �- 1tS OF NO OitAD�y�� "V'' rs ~ --'- tEStI /`, H C 2 DA 3/25/96 I:. "•.-.,. �` ^--..._#� -�-.,•..`` 8�-•--^- � �� �'1 1 / � � � � \ � � � � -..,`' -*.wry 54 " ,, l P G 898.76 �_ ~ ( i EARTHWORK I --- -�- _ ` 152 h ,20 MATCH EAST' ' !� 'Jy \ �,...... �� GRAM 4t- -y.`~ �• '�'� 695. W r 889.59 r , Gj 1 i I.F.F.-88.90 ! 1/2 W.O 1 ' f 1J� ^ 151 15 ��e �, a� r• m l IM F.- ar __ --- ;OO.DO' "' -� -� • � 18930 ,�►. � 1 � % � � w - �• ...-- 1'' I � r 41V893.50 / . l 6 VAk D.&M _- rw 14AT 78.411 I 328�153--- \ �u 9.20 f HELY ism =7 -Tau- ' �• - - elm 30' 8.L 00092.aW EX. MANHOLE ` -- -- X-�t?" a; 11, - - _ T.C.=893.54 51fd EXISTING INV.=874.78 N.E. \EX $, 114v.=074, /a N. WYE & LPT MAN INV.=876,34 W. EX. 10" 12" R,C.P INV. -891 b93,7i INV, I I 73 ss�lw�erres�► . 891$3 INV. -8910 301.D.U•81S.9.E �T• •=.t9: AIN W. p' ; • -G r - mar, \� iffil e, ti '\, `\ A3 �� G r r a9iCII4F F3 p3 !� ` LAW- XF3 F3 y( ........_.Fsy3 j( J t i F9279 // r .02 F3C /P 694.sa `/ 33,13 8yt8� 895 01 J 15 l _ G _• �^'.--- ,...�.._ -..,`_ ^----- .i3,� (' � iSFT3'� �2.i.i fir•' � ___ _ ___ --� ti -' �. 862.97 0.23 Ulk F3 STORM TABLE Str. No. Type TC/Rim Inverts Dir. � as 0000 900 YARD INLET 891.00 889.00 (N) 901 DOUBLE CURB INLET 890.81 887.76 (NE)(S) 902 DOUBLE CURB INLET 890.81 887.31 (NE)(SW) 903 CONC. END SECTION S81•00 (SW) "HOLEY MOLEY" SAYS: 1-800-382-5544 CALL = FRBB 1-800-428-5200 FOR CALLS OUTSIDE OF INDIANA CAUTION LOCATION OF ALL EXISTING UNDERGROUND UITUTIES SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND EVIDENCE (including, but not limited to. manholem inW* valves. & narks made upon the ground by others.) AND ARE SPECULATIVE IN NATURE THERE MAY ALSO BE OTHER DMMNG UNDERGROUND Un=Es FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND WAS OBSERVED. THE EXACT LOCATIONS OF SAID EXISTING UNDERGROUND UTILITIES SHOULD BE VERIFIED BY THE CONTRACTOR PRIOR TO ANY AND ALL CONSTRUCTION. m N� I.I. C14 < � as 0000 n p� C M v Z Q Q -J t` I V)Ix LLJ I ao ri w Z O 00 D L) Z LJ n �00 CD v7 z 0) J n t` � 00 n 00 v � w WF U N� I.I. C14 < � as 0000 n M v Z Q Q -J t` I V)Ix LLJ I ao ri w Z O 00 (' 00 Z LJ I CD v7 z 0) J � U) O U 00 v � Q qq' z Z Z Q O F- � U Z W Ld iG 5 LLJ CL U 0 <C W CL W Y 0 _V W (n Ld V ! T U J LLI Q Q SHEET NO. 3 of 15 sun " "01245 THIS SHEET TO BE USED FOR EROSION CONTROL ONLY. 1 Y ej 1 EX, M, NH QLE T.C.-892.72 INV.=$75,72 N. INV.=875,62 S. INV. -877.27 N.W. 895.7, CP �f T2 N r N INV,m874.78 N.E.. C INV.=874.78 N. INVI34 W. EX. 1 " 12" R, ..P. INV.= 1.9C 33.7, EX, T. C. INV. U r` M 2n wl 0 eri CU eri 4 N N rn Q U_ en 0 w v V) v rn 0 IV C1 .•ti d D wo U / �`\��\, `h tiq• s. ,�, y, • X5.90 4C , 05 607.86\ �, �_ .... � N f �E15w.93 ,` NOT%6 :� . �G �. `I 1 6' \ w — -: `\ 0(/ ` Ex, --PY `��,. •``� �f� `ALRIS AND,,�OBSTRUCTIONS Vlll.-1-L '� '� S b� ... —... ¢p M �� T.C.s 1 t 1 8e7.02 ,�\; ��"' �BE.,REMOVED F,�`OM TOP OF BANK-�... / '�' �'� \ �` � I TO TQP OF P` K ASG -HENLEY CJ 1 _ f 4b TO ,c v. Y.b07.73 � N. 1 / 000 14 ... C84.84 {, a15r•�,,,.,-„.., I ' ” ,�� \ ._ __ ---- - •-X. CC1N ovo E ) SEt: f1UN �./. •.•c.� `X INV --k881,39 AE78 Of EGR K 1A,\ - ` x X X X h 00 YR. AY PER\ 2 DAD3/25/96 r\ ;q X x X X XP. L \ f I 34 X X X X X X X X XjX LIMITS of 1 l J Iy s — x x x W_lt x x x x x x x x x x x o� EARTHWORK I ) x x x X MATCH EXIST.pir ' X x X X X, A 5c2 x x x x 2p GRIPE. X X X'X X x x x x X X X X I ^ + x x xaq Qc• p� x x Ix x x $c x x x x x x r( $07.82G xxxXxxgpxxxx X xxx� xXXxxx x X X x 'F.XF.-#8 t9 x x x x x x°D x x s •� •, • r • 1 ,• x �*_XV✓��%:� ,..r. / %/ r ' ' I ♦ .j/ //. /� .� / `//////�'� ♦ �� //Iii✓ %.'� '(r -,y F ! . / /// ♦i,, /ice/ .. �-- ♦!I/ ♦ ' a 00 • 8 / �/ ' ` :. - - ; - - — — - ` - • yi/moi''♦. /4� �. 0 .W Ll �� _ ♦i�/ /////iiiiiiiiiiiii//ii i/i. ♦i///ice.:. !. - i // ♦, .�./: - ii., ..,; � 1�.� v ` a•...,..,...,.-.,_.,,.�/•,ri•�a.�/•t . ♦sir\`i.•�. �i,•�. ��� �R�w1�11►�� �' I�'•��� r -f ♦r,, •7�+ '/ fi: ��f� ,`. .� I♦� "^ ::'.. .%♦ iiia ..... .r— . 0017, 1.11 •� ~ . �� 111 y . � f % � ♦ � • / I�./ �� �tuc.►:al'��lt 'r a ate-"WI—Aw,a.': W�' • �� ,///� t `%,i�/I ►.y: j'. ` ��_��...:�.•_�.• _ i �;�, �����/.�. `.�%. �� • t \� T2 V10' C.M.P. A3 aet 3 INV. =892-03 U21 1 - 372 � � F .e4 t3 -890.9873 - �� F3 Temporary straw bce dam to be removed during blanket installation. Denotes permanent seeding & mulch areas Seeding rate: 130#/acre or 3#/1000 S.F. Seeding mixture: 25% creeping red fescue 35% perennial rye 40% Kentucky bluegrass Denotes seeding w/fiber blanket #S150 by North American Green Seeding rate: 110#/acre or 2.5#/1000 S.F. Seeding mixture: 38X Kentucky 31 fescue 19% perennial rye 19% annual rye 14% orchard grass 109 Kentucky bluegrass * , Denotes temporary seeding & mulching. Seeding rate: 50#/acre Seeding mixture: 100% perennial rye. Fertilizer Specifications: FERTILIZE AS RECOMMENDED BY SOIL TEST. IF TESTING WAS NOT DONE, CONSIDER 400-600 LBS./ACRE OF 12-12-12 ANALYSIS, OR EQUIVALENT. FERTILIZER. TILL THE SOIL TO OBTAIN A UNIFORM SEEDBED, WORKING THE FERTILIZER AND THE LIME INTO THE SOIL 20 -4 - DEEP IMTH A DISK OR RAKE OPERATED ACROSS THE SLOPE w f♦ T,i \ � Ery t � � •"'�' 1i- PO J r 9L `s 1*6 'moo 9 \ h� , WALL bL Ac= EIYw T9 006 HOMY 00n1I N`IAV M.A��Atl 0/ EART! CO�TRACTC INSTALL TONE #CCESS PRIOR TO CONSTIRUC110 F3 12 ` I \ `l SCALE: 1'= 50' m C < No. 00 A7E OF n I Temporary straw bce dam to be removed during blanket installation. Denotes permanent seeding & mulch areas Seeding rate: 130#/acre or 3#/1000 S.F. Seeding mixture: 25% creeping red fescue 35% perennial rye 40% Kentucky bluegrass Denotes seeding w/fiber blanket #S150 by North American Green Seeding rate: 110#/acre or 2.5#/1000 S.F. Seeding mixture: 38X Kentucky 31 fescue 19% perennial rye 19% annual rye 14% orchard grass 109 Kentucky bluegrass * , Denotes temporary seeding & mulching. Seeding rate: 50#/acre Seeding mixture: 100% perennial rye. Fertilizer Specifications: FERTILIZE AS RECOMMENDED BY SOIL TEST. IF TESTING WAS NOT DONE, CONSIDER 400-600 LBS./ACRE OF 12-12-12 ANALYSIS, OR EQUIVALENT. FERTILIZER. TILL THE SOIL TO OBTAIN A UNIFORM SEEDBED, WORKING THE FERTILIZER AND THE LIME INTO THE SOIL 20 -4 - DEEP IMTH A DISK OR RAKE OPERATED ACROSS THE SLOPE w f♦ T,i \ � Ery t � � •"'�' 1i- PO J r 9L `s 1*6 'moo 9 \ h� , WALL bL Ac= EIYw T9 006 HOMY 00n1I N`IAV M.A��Atl 0/ EART! CO�TRACTC INSTALL TONE #CCESS PRIOR TO CONSTIRUC110 F3 12 ` I \ `l SCALE: 1'= 50' m V) C < No. 00 A7E OF n ov V) C < w 0000 ov �� Q J t` I V) of I 00 N Z o O 00 Z 91 u Z 0) o� w Z O U .- v ire Z Q J _J O w F_ Z O U Z O V) NO w W Z Q C) Z Z O U Uj V) LJ U Q J U V) TW i U J w Q SHEET NO. of 15 sun " No' 12450 En Lan r rn Cn Ln bi N Ln 0 CrW r Ln Q LO CU Lo i THIS SHEEP TO BE USED FOR EROSION CONTROL ONLY. NOTE: TO CONTRACTOR 1. Prior to any work commencing contractor shall install stone drive at entrance. and all silt fences shown an pion. 2. Upon completion of the storm structure from being bust the fabric drop Inlet protection Is to be Instated ON curb Inlets and straw bales an yard Inlets Immediately. 3. Upon completion of the swde construction, contractor shall notify engineer to as -bust, upon oWsw of as -bust engineer shall notify contractor to install the erosion control blankets os soon as posell" FORMS/22887 PERSON ONSITE RESPONSIBLE FOR EROSION CONTROL: JAMES CAITO CHESWICK CORPORATION PHONE: (317)-873-0550 Sol Erosion Control Summary The fallowing is a Not In sequence of oonsbuctbn activities to control sol erosion: L Contractor arca Install sediment traps and ab ow bale Aters. as shown. 2. grade the eke (sides of swdesr mounds and panda to be seeded and mulched Inrnediatelyy upon completion) • Temporary s�e�nq shah be noornrnwhdad Per all scales and dNtunbed arses }iwt cannot be final seeded within a time period that will prevent dope onosion For temporary sssdng, the oantractai shall utilize a fast growing seed of ekfier oaten annual r wheat or rye depending an time of year. DMarbed areas should be kept to a mMvvxn at all Ones. 3. Contractor shall control mud accumulation an as streets surrourAing project by Instal" /tone surface at at locations where osnsbuotion traffic leaves the site. Dust /hall be kept to a rninirwrn by utilizing sprinkling. COMM Chloride, Vegetative owl r. /pray an asi oolves or other approved melieds. 4v Maintain all filters and traps during construction to prevent any Wo it- from aoorrnulated s/dlnent. Additional ft"" and straw halos m0 be required during oonstnr_tton a speciz by Engineer ler Sas Conservation Sellae. Payment for additional straw bales shall be at the Contractors apenes. Payment for additional rip rap (not shown an plans) and sssding shd be paid for an a unit basis. 5. Contractor shall Install as sanitary sewers, storm aswers. subsurface drains, and water main& Straw bale Ater shall be Netdled at ON storm Inlets (including /bellt 11111164 Seeding Specifications I. Ditch Banks: shoo be seeded and covered with North Amufow green Aber Me" AM50 and #RC15o (ler Equal) or Hydrosseded with straw mulch. The Contractor shall follow the manufacture's recommended guidelines for Installation and staple patterns when instdllnq the fber blanket& Seeding rate: 110/lawn ler 2.5//1000 S.F. Seeding mixture 30 Kent 31 Fesous In Perennial Rye I4X �dRye es IOX Kent lilluegross 2. 4' of topsoil (mNmwn) shot be placed prior to permanent seeding. 3. If grades are established between May 15 and August 10, a temporary seeding oaslsting of 40i of mrd Rysgroes shall be planted per core. 4. If grades are established between October 15 and December 30, either Rys (groIn) ler MAsat may be used at the rate ofd /Aa AN grains Mould be mowed prior to rced 5. If temporary seeding M established prior to permanent sssang, the mulch may be ollmleted swept In 'bare• areas. 6. If grading occurs during December. Jarwary, or February. use dormant seeding and It should be done within 7 days of last land disturbing o_t1Mty. Recommended Erasion Control Measures ANGLE FIRST STAKE TOWARD PREVIOUSLY LAID BALE WOOD STAKES 15"-20" , / r IN GROUND W W CHINK GAPS W W/STRAW I V Y V Y W U STRAW BALE DAM DETAIL SECTION NOT -TO -SCALE SEASONAL SOIL PROTECTION CHART T STABIIJZATIO N PRACTICE JAN. FEB. MAR. APR. MAY JUN. JUL. AUG. SEPT. OCT. NOV. DEC. PERMANENTSEEDING - - -- - - - - - - - - - - - - - - - - - - - - - DORMANT B SEEDING- - B -i - - -e SEiDING - - - - - - E - --�///////h--e, '111W1111111 -1m -- - - - - - SODDING FOO -0 MULCHING - - - - - - - A = KENTUCKY BLUE GRASS 40 Ib&/AC.: SING RED FESCUE 40 lbs./AC.: PWS 2 TONS STRAIN MULCH/AC. OR ADD ANNUAL RYEG11tAS3 200n>/AC. B - KENTUCKY BLUE GRASS 60 Ib&/AC.: CLING RED FESCUE 60 Ib&/AC.: PWS 2 TONS STRAW MULCH/AC. OR ADD ANNUAL RYEGRASS 301be>/AC. C - SPRING OATS 3 BUSHEL/ACRE D - W14EAT OR RYE 2 BU%WACRE E - ANNUAL RYEGRASS 40 lbs./AC. (1 lb. /1000 sq. ft.) F - SOD G - STRAW MULCH 2 TONS/ACRE '///• IRRIGATION NEEDED DURING JUNE. JULY, AND/OR SEPT. ** MUNGA710N NEEDED FOR 2 TO 3 WEEKS AFTER APPLYING SOD Erosion Control Blanket: Recommend erosion control blanket@ such as; North American Green S150 be installed as a temporary erosion control "mere N the bottom of any reale with a canoentrated surface water flow. Rehr to erasion central practice *umber 317 . Strove Bale Drop Inlet Protection: Recommend wing straw bale drop Inlet protection es per erosion control practice number 3.64 as a temporary elusion omtral measws until blankets are Instated. Other drop Inlet Protection proctioes may boom* the reoarwmendatbn of the arrglhssr ler erosion control consultant if a IpaoMc = rInss dunce Construction. Topsoil Salvage and Utslzaticn: As per erasion _antral practice number 3.02. Removal of topsoil to a depth of sir Inches (ler more it required by the sngltesr) from as areas to be excavated ler fined. Taped should be to at a location M us It will not Intorisre with ooretruction aperotkn& Temporary snc*W Recornmend temporary seeding as per er+esion control practice member 3.11 N disturbed ground is to be left bare far two months ler mon. In oddkian, R N recd meinded red dam be added to the seeding mbrtun at a rob of 10 Ponds per oar& Dormant and Frost Seeding As per practice number 3.13 attoohed to be applied If necessary. Surface Roughening As per wasbn cantrai practice number 303„ suggest wing a bulldozer to track with cfests pap- dF, Aar to the dopeof slopes an disturbed ground of sir percent ler greater and orewA the t shoof the lakes as a temporary meow* until ready for blankets. T Grovel Entr+snce/Endt Pod:RecommorWed as per erosion control practice*rube► 3.01. This Consuvatim/Pttection: As per erasion control practice number 3.63, the contractor sinal, at the dleation of tin developer. whdeovor to save and Protect trees of value and worth which do not Impair oonslructim of Inproverments ce designed. In the event out or HI exceeds 0.5 foot over the root oto. the developer shah be consulted with respect of protective measure to be taken. Many. to preserve such tees Maintenance SaleduuW Maintenarnoe of all a odor control practices *m" be doe as needed an a wosidr basis and ` as kwile storms. A construotieon sups West should be assigned tin task of "on that dl practices an Installed and mahlainedaccording to the design crawls. tlainterhahce Ior each erasion control practice should be oondu-1 per n slntsnance sdledlle shown an each efeelanl control Practice job sheet (attached). Construction Sequence Schedule: antrarha, ka�talidtslnporery sit hnoe. ship and etedkple topsoil. Elrcovate buil h we" and other .arthwork (alas, reads, .wales, .«sun. oto.) "g/blsmmer. Install Wowbaie Inlet protection. kstas rock chute outlet protection. Install temporary en+esion control blankets a needed. Trowk In ridges with doser deate an ON slopes greater than sink pe am t and around ski slopes of lake& Summer/Fd:- Apply sod in at area that an finish gRaded. Apply tempor" Seeding In areas when earthwark awotructlon M halted and area will be ban and�ossd for mere than two months. Maintain soda control preatlese ler per erosion so " mahtsnanos schedule above. Remove bmporory erosion control meoll res in std*W areas that have been sodded. wter/Spring Apply dormant essd4p an any areae that show a need for it. Continue maintenance of .lddN w oolon control prastios& n ntt tIne nal per• open ground and remove temporaryerosio control Implement FORMS\18543ECM Considerations in Construction Sequence Scheduling Construction phase (specific activities C or erosion control pro:tiose)* Cortstruction saheduls considerations Pre -construction actions (Evaluation/protea- Before construction, evaluate. marts, and protect tion of Important site characteristics) important tram and associated rooting zones, B unique areas (&g.. wetlands) to be preserved. on- 176 site septic system absorption fields. and vegetation � suitable for filter strips, especially In perimeter areas. Construction aces" (Construction entrances, Stabilize bare areas immediately with gravel and construction routes, equipment parking areas) and temporary vegetation as work takes place. Sediment barriers and traps (Basin traps, silt Install principal basins after construction site is fences. outlet protection) assessed. u Install additional traps and barriers as needed rr during grading. Runoff conveyance system (Stabilized stream- banks, storm drains, inlet and outlet pro- Where necessary. stabilize streambanke as early as possible. tecticns, channels) Install principal conveyance system with runoff control measures. I Install remainder of system after grading. Land clearing and grading (Cutting/fliing/ Begin major clearing and grading after Instal - grading. drains, sediment traps, barriers, the key sediment and runoff measures. diversions, surface roughening) Clear borrow and disposal areas as needed. Install additional control measures as grading progress". Surface stabilization (Temporary and perma- Apply temporary or permanent stabilization nent seeding. mulching. sodding. r1prap) measures Immediately on all disturbed areas 00 where work is delayed or completed. Building construction (Buildings, utilities. paving) Install necessary erosion and sediment control practices as walk taken place. Landscaping and find stabilization (Topsoil- Stabilize all open areas. Including borrow and ing, trees and shrubs. permanent seeding, spas areas. mulching. sodding. rlprop) Remove temporary control measures and stabilize. *Maintenance -- (1) Inspect practices at least once a week, and (2) make repairs Immediately after periods of rainfall. EEF96/17480ERO Maintenance: Seeding *Inspect periodically. especially after storm events, until the stand Is successfully established. (Characteristics of a successful stand include: vigorous dark green or bluish -green seedlings; uniform density with nurse plants. legumes, and grosses well inter -mixed; green leaves; and the perennials remaining green throughout the summer. at least at the plant base.) *Plan to add fertilizer the following growing season according to soil test recommendations. *Repair damaged, bare, or sparse areas by filling any gullies. re - fertilizing, over- or re -seeding, and mulching. *if plant cover is sparse or patchy, review the plant materials chosen, soil fertility, moisture condition. and mulching; then repair the affected area either by over -seeding or by re --.reeding and mulching after re -preparing the seedbed. *if vegetation fails to grow, consider soil testing to determine acidity or nutrient deficiency problems. (contact your SWCD or Cooperative Extension office for assistance.) *If additional fertilization is needed to get a satisfactory stand, do so according to soil test recommendations. Maintenance Storm *Inspect after storm events to check for r: ovement of mulch or for erosion. *If washout, breakage, or erosion is present, repair the surface, then re -seed, re -mulch and, if applicable. Install new netting. *Continue inspections until vegetation is firmly .j*tablished. Maintenance Blankets *During vegetative establishment, inspect after storm events for any erosion below the blanket. *If any area shows erosion, pull back that portion of the blanket covering It. add soil. re -seed the area, and re-lay and staple the blanket. After vegetative establishment, check the treated area periodically. METES/23899 CONTRACTOR SHALL MAINTAIN EXISTING STREETS FROM DEBRIS OF DIRT,SAND,OR STONE AND SHALL BE RESPONSIBLE FOR THE CLEANING OF SUCH ITEMS. AFTER COMPLETION OF THE WORK, THE BUILDERS WILL BE REQUIRED TO KEEP STREETS FREE OF THE SAME, AT THE CITIES DISCRETION. EXISTING VEGETATION: TREES/CULTIVATED FIELD EROSION CONTROL FOR INDIVIDUAL LOTS 1. CONSTRUCT A GRAVEL DRIVE 2. CONFINE ALL TRAVEL TO THE GRAVEL DRIVE 3. PRESERVE AS MUCH OF THE EXISTING VEGETATION AS POSSIBLE 4. IF THERE ARE LARGE EXPOSED AREAS ON OR NEAR SLOPES A SILT FENCE MAY BE REQUIRED 5. AFTER FINAL GRADING, SEED OR SOD THE YARD AS SOON AS POSSIBLE 6. AFTER A YARD IS RE -VEGETATED, REMOVE ALL TEMPORARY EROSION CONTROL MEASURES ALL AREAS NOT DENOTING PERMANENT SEEDING OR FIBER BLANKETS SHALL BE TEMPORARILY SEEDED. RECOMMENDED EROSION CONTROL MEASURES WERE TAKEN FROM CHAPTER 3 AS STATED IN THE INDIANA HANDBOOK FOR EROSION CONTROL IN DEVELOPING AREAS. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY INSPECTOR AS CONDITIONS WARRANT. 6' 1 STAPLE PER So. YD. 1-_i/2 STAPLES PPEERR SQ Y0. 2 STAPLES PER SO. YD. • x x . rpx IS x r 3.5 STAPLES PER SO. YD. 8 • rn C no STAPLE PATTERNS APPLY TO ALL NOR1H AMERICAN X111 GREEN EROSION CONTROL BLAWETS. STAPLE no PATTEMIS WILL VARY DEPENDING UPON SLOPE B LNM7K SLOPE GRADE, SOY. TYPE AND AVERAGE 176 ANNUAL RAINFALL. � filo M iij too 0 >d eo u J rr 2 STAPLES PER SO. YD. • x x . rpx IS x r 3.5 STAPLES PER SO. YD. 8 • C C C C D g A A B 8 41 W M 1:1 Low MMAM C4a a SLOPE GRADIENT EROSION CON71ROL BLANKET STAPLE PATiM GUM Soil Descriptions: Miami silt loam. 2 - 6X slopes, eroded (MmB2) This gently sloping, deep, light-colored soil is found along drainageways that cross areas of somewhat poorly drained Crosby sols, on small isolated knolls on till plains, onentl rolling moraines (accumulations of drift materials deposited by glacial Ice), and on g Y ridgetops. It is well drained and had a seasonal high water table greater than 6 feet deep It has compact till starting at a depth between 20 to 40 inches. The permeability of this sol is moderate. Available water capacity is high and the organic -matter content of the surface layer is medium. Runoff is medium. Moderate erosion Is the main limitation. Limitations formoet nonfarm uses are moderate. Items of special concern: -Sol erosion. -Poor construction material. -Ponds built In this sol are subject to seepage. Miami sUt loom, 6 - 12 X slopes, eroded (MmC2) This moderately sloping. deep. light-colored sol is found on irregularly shaped knolls. in long narrow bands around ridgetops. along drainageways leading to terraces or bottom land, and on undulating moraines (accumulations of drift materials deposited by glacial ice). It is well drained and has a seasonal high water table greater than 6 feet deep. It has compact till starting at a depth between 20 to 40 inches. The permeability of this sol is moderate. Available water capacity Is high and the organic -matter content of the surface layer Is medium. Runoff is medium. Moderate erosion is the main limitation. Limitations for most nonfarm uses are moderate. Items of special concern: -Soil erosion. -Poor construction material. -Septic field capability is moderate due to slope. -Ponds constructed in this soil are subject to seepage. -Outdoor recreation facility capobpity is moderate due to steepness of slope. Shoals alt loom (Sh) This nearly level, deep, light colored sol is found on narrow flood plains along meandering streams and in low-lying, woolly defined drainageways of large river bottom land. It Is somewhat poorly drained and has a seasonal high water table that Is 1 foot to 3 feet below the surface from January through April. It has gravelly sand starting at a depth between 40 to 60 inches. The permeability of this sol is moderate. Available water capacity Is high and the organic -matter content of the surface layer is medium. Runoff is very slow. Flooding and wetness aro the main limitations. This sol is subject to flooding in winter and in early spring and to flooding during some parts of the growing season. Because of flooding and wetnem limitations for most nonfarm uses are severe. Items of special concern: -Severe limitations for basements, shallow excavations, buildings, road development, and septic fields due to flooding. -Ponds bust In this sol aro subject to seepage. -Poor roodf ll material. -Severe wetness problems for outdoor recreations facilities. Gravel Meg swrlop onto ew art 1. FYI geotextile bags approximately half full with 2 to 3 Inch stone or growl. 2. At a position downslope of the lot and upelope of the Inlet. lay bags tightly In a row curving upsiope from curb and away from Inlet. 3. Overlap bags onto the orb and extend a min- imum of 3 feet Into the street 4. For additional layers, overlap bags with the row beneath. and leave a ane -bag gap In the middle of the top row to serve an a spillway. Q Place bags In an are around orb Nets that are In a sump position. 6. Set up safety/traffic barriers to keep vehkchles from hitting bags. causing possible Injury. 7. Inspect and repair as needed, and remove any accumulated sediments after every storm. 3 R (mfr.) Row //� lMrhoQ i-+ CURB INLET PROTECTION DETAIL ULTIMATE RECEIVING WATERS: HENLEY CREEK/ WHITE RIVER THERE IS NO EVIDENCE OF WHERE STORMWATER MAY ENTER GROUNDWATER. FENCE Y� e,!' FENCE POST SHOULD J J BE BURIED til' BELOW GROUND SURFACE. SILT FENCE MATERIAL SILT FENCE DETAIL NOT -TO -SCALE 2 ft. min.' 107* settlement \ Desi Mn width Composted soA , `.... 4 rr ' - - - - - - - Protected area Designdepth GROUND SURFACE SILT FENCE MATERIAL SHOULD SURFACE. 61 JEELOV GRA r� Installation n,0 0�0 0, No. BTAM OF ����nunula�l` Flow All slopes 2:1 or flatter SITE PREPARATION: 1. Remove all tram. brush. stumps, or other debris from the site. and dispose of properly. 2. Fill and compact all ditches or gullies to be crossed. 3. Prepare the foundation so its elevation is at or above surrounding ground level. 4. Disk the base of the dike before placing fill. CONSTRUCTION: 1. Fill the dike higher than the design elevation and compact with wheels of the construction equipment to design height plus IOX (sea Exhibit 3.23-C). 2. Construct the channel to the dimensions and elevations shown on the plan. 3. Leave sufficient area along the dike to permit access by mochinm for cleanout and maintenance. 4. Install outlet rotectlon and sediment traps as part of the diversion dike. All outlets must be stable). STABILIZATION: 1. Stabilize the channel using erosion -resistant lining to protect vegetation. if necessary. 2. Establish vegetation on the dike Immediately following construction. Maintenance ? Inspect the dike periodically and after every storm event. ? Remove debris and sediment from the channel Immediately. ? Repair the dike to its original height. ? Check outlets, and make necessarepairs to . provent gully formation. ? Once the work area has been stabilized. remove the diversion ridge. fill and compact the channel to blend with the surrounding area, and remove the sediment traps, disposing of unstable sediment in a designated disposal area ? Stabilize the disturbed areas. FORMS/17131 TDD TEMPORARY DIVERSION DIKE NOT -TO -SCALE m VI S < C n 431 U �00 U) 3 z t` 00 X 0 W > rn 00 n � M 0 X Q J � I 40 V) of I 00 N W Z O 00 W I C.^ LO enZ (n 00 Z U n v V) Z Z Q 25O Z I- Q Z U 0 U. �-- U U Li UJ CL 0 Lv J U O Q Z Y O U U Z (n 0 LLI V) 0 UW W Q LTJ 10 SHEET NO. 5 of 15 *an '10s No' 12450 N U N m Q O 1� N f+7 .rr m N rn L <L Q 1— N I Q Lr) Q U] Co Q N .ti CL 3 w U) N I M clu 1 N N c, Q ! L F— Z i Q N ch U9 v cu CL CDi 3r r.�•yA''� 894. 8 F r I c � l - 895.01 F-3 -- _ �. 152 �I J i it I 311 r, rL Ute 0 X I 151 40' B.L. I 30' D.dcU.E. I HENLEY CIRCLE 10 00 00 Rim00? ol 00011.1 �4, 0F4A6 e 1.50% co 2+80 m IK s+oo \ I \ I VAR. D. U.E.&S.L.E.&L.M.A.E. 30' D.U. Gf PASSING BLISTE�AND ALL DRAINAGE PIPES do SW S SHALL BE NSTALLED IF RIGHT—pr—WAY CAN BE BTAINED ON/THE OUTH SIDE OF 13 TH STREET. DITCH ROAD PAVEMENT COMPOSITION H.C.R.S. TYPE 2 1" #11 H.A.C. SURFACE (BY OTHERS) 2" #8 H.A.C. BINDER (BY OTHERS) 2" #8 H.A.C. BINDER 12" COMPACTED #53 STONE BASE OR 5" #2 STONE AND 7" #53 STONE ON COMPACTED SUBGRADE 0 tx �,\ \ 5' N.A.E. ACCESS ESMT. TO CO. HIGHWAY DEPT. 3 -Z 885.X82 j SECTION " A"- "A" SCALE:1 "=10' SCALE: 10- 20' - 4' SIDEWALK OPOSED GRADE EXISTING GRADE 6fA1tE Gf �M n 00 r V) fY 0 N ul < z W ao 0 n in W Z M W z a V QLL. Q Z J a' O F= Y U U LJ 3: I to W LLJ= ~U V) Ld I 00 n Q Z c Uao Z I /W V Z J I vs U) O0 Z O U v � SHEET NO. 7 of 15 mm -m " No' 12450 n 0 ? _J Q Z W 0 _0 f -- V W Z W W � V Q Z J a' O F= Y U U LJ 3: N� W LLJ= ~U Z J W Q SHEET NO. 7 of 15 mm -m " No' 12450 n N U N n N f` M .ri LCI r+ N N rn 4 L L L- Li Q Cr 1 .. Q N N O LCI .Q CV C1 1-1 LL. av cn cn ., 0 0 m ulN N cm u - Z a Q cn / Q U) 0 N CL 319 / 0 SCALE: 1'= 50' 1 m 5 vs S p� TTS S O n U N �00 N o . 0 NO. - ao =ATE 5 r �M o quiuuu0W: C� rn � LLJ W � FULL DEPTH GRANULAR BACKFILL SHALL BE INSTALLED ON ALL SEWER LATERAL STREET CROSSINGS &COMPACTED PER I.D.O.H. STANDARDS. Z a MIN. SLOPES PER THE RECOMMENDED TEN STATE Q `` J STANDARDS SHALL PREVAIL IN ALL CASES. CONTRACTOR SHALL EXTEND SEWER LATERALS 00 AS SHOWN. IN NO CASE SHALL END OF w LATERAL BE CLOSER THAN 5 FEET TO BUILDING Z o SETBACK LINE. f ri co SHEET N0. 9 of 15 sem '100 "o` 12450 Z w I 1 Z M Z Z Z rn 0 J � W V) 00 Z W W U v � SHEET N0. 9 of 15 sem '100 "o` 12450 Z Q 1 Z Z Z Q 0 W V) W 3: W W (� � Q � J Q Y Z Q V) W i U J W SHEET N0. 9 of 15 sem '100 "o` 12450 U fn On m W" Io fh `i If) .-r N rn m Q .ti U - En Q U 1-1R to CoL Q N .ti d O LL U) L) r- Cn (31 cri N N CM U- CC UJ a s N i Q N U9 N a Si g N\ r 153 `�EXIST. WATER - Pro iect Location 50' 1 25' 1 25' I 1, 4 5, 15' 15' STREET DETAIL No Scale 5' 4' PRELIMINARY WATER DESIGN SUBJECT TO FINAL DESIGN BY INDIANAPOLIS WATER CO. INDIANAPOLIS WATER COMPANY PROJECT LEGEND Project Number. J-XX—XXX LEGEND Street Name Pte Size Dow a= � 1 Nov= on X" XXX' NaRoISED N?=wr X" XXX' VALYF ■ &a Blow Off ASSMr AM IIFAVUCR XXX' w T.A 1LF uri SUM I -V8911® to am o CAM APE e —6 as DMFS T _ _ — — T 1L'LE>'w L411!~S E E ELECIEIC LAS Pro iect Location 50' 1 25' 1 25' I 1, 4 5, 15' 15' STREET DETAIL No Scale 5' 4' PRELIMINARY WATER DESIGN SUBJECT TO FINAL DESIGN BY INDIANAPOLIS WATER CO. INDIANAPOLIS WATER COMPANY PROJECT LEGEND Project Number. J-XX—XXX Job # Street Name Pte Size Total Pipe 1 HENLEY CIRCLE X" XXX' HENLEY CIRCLE X" XXX' 0 Z a TOTAL XXX' 1' Utility Contacts al+m Coon t Cob IWO ph tW&U# AArafm Ti*1w" r T r Conroo Cai6%*kn o/ bralbrgo ft bu Amar m Cai6rti #1#fi o/ Nrdu *ok "HOLEY MOM" SAYS: 1-800-382-5544 Qu wu = 1-800-428-5200 =nusW=aBWAA SCALE: 1"= 50' Notes: Sand bodffl as mquhd. Lomb t,14nrrb In Mu fl&. a4 & fwkw pawrrAw & "V& AM am dw* bar pryro to bo &wood In /in PWC to be roOd d AwM darrrW b km /10C am l oanhMitvv anal/ «mr w to MIN as root ram wbmtw a fob pndrr tlMan 1" aw be Jim cul' CAUTION LOOAl10N OF ALL EXISINIC INrDERORa M UMMM MW ON TW KM ARE BASED UPON ABM 4RWW EVDENCE. (inoNdirrp. but not I Nbe to, mmhobs. Mdw.. mora modsun qr� am by .s AND ARE SPECULA NE w MIURE. 7HIX MON AM BE qn*R EXWWG UMN31GROU1D UnnM FOR WHW THERE IS NO ABOVE GROUND EVIDEIiCE OR FOR WNW NO ABOVE GROUND EVDENCE US OBSERVED. 7NE EXACT HOC MW OF SAD EXMWG UNDERGROUND UMM SNOUU BE VERIFIED BY 7K CONTWCM PRDR 70 ANY AND ALL CONsnicwk son" n V) oQo N� US ;,u �00 �n 00 W U o z W > Oo Vn v 0 Z a I � VCIDI W� Z o 0 Z Li I LO rn Z rn 1- In U) OD Z 0 r- M s Z Q J Q. w Lv I— Q Z O I— U W V) Lv U Q J Q. SHEET NO. 11 OF 10 s Jw No' 12450 I■ ■ a SCALE: 1"= 100' LEGEND Q FLAGMAN O FLAGMAN AHEAD SIGN O ROAD CONSTRUCTION AHEAD SIGN/END CONSTRUCTION SIGN • DRUMS ;it 1%. ` W F5 � �r v F ac Ono a (0 (45 5 OO a 0� Ix b Ln U N h Q1 r m �r Q fV (1J CM 4 L U_ N LL_ 4 Q v 0 Ln v f11 rl CL z 0 END ROAD OONSMUCTION OOIi5TiS cim NEXT MRn XG20-2 . x24' XG20-1 60'x36' ROAD CONSTRuC110N low". xQ0-1 48x48 d5 JH b 6 1 �5 I: �5 k ?S k GENERAL NOTES 1) See Standard Detour Signs sheet 2—A for vertical and horizontal clearances to Construction Signs. spacing of channelizing devices and details of barricades, cones, drums. morkers and Typical Sign Standard. 2) Construction Warning Lights shall be required in accordance with the Standard Specifications. 3) Additional signs and barricades shall be required as directed. 4) Spacing of drums and Barricades Type 1 and 11 at this location shall be 10 feet for a 50 foot taper or 20 feet for a 100 foot taper. 5) For temporary lane closures during daylight hours, cones or tubular markers may be used In lieu of drums or Barricades Type I and Il. 6) For un—numbered routes. street signs or county road signs shall be used in lieu of the route marker in the Detour Route Marker Assembly. 7) Advance Turn Detour Route Marker Assemblies shall be located as shown, or after the last cross—street prior to the beginning of the detour. as directed. 8) Directional Detour Route Marker Assemblies shall be located 10 to 20 feet In advance of all required turns within the detour limits. 9) Confirming Detour Route Marker Assemblies shall be spaced at a maximum of r mile, and shall also be located 50 to 100 feet post all major intersections, as directed. Confirming Detour Route Marker Assemblies shall be placed after a required tum when directed. 10) End Detour Route Marker Assemblies shall be located at the point at which traffic Is returned to the original route. The Advance Tum Marker (MS -1) shall be included In the assembly when traffic is required to tum to access the original route. FORMS/TRAFFIC W cc �x a ccnZn 205' 500' 500' W Z, U N �NZZG lAJ VOA gas In Cr W OZME � W a a N d ❑❑ a ❑❑ ftFFr. ONE LANE FLAG= ONE LANE RDAD ROAD Clxl11tXrx-48r" ROAD ROAD AHEAD ROAD AHEAD AHEAD , N NExI IS= AHEADXG20-1 60'x36' XW20-4 XW20-7 XW20-4 XW20-1 48x48' 48'x48" 48'x4lr 48x48' 4e5 4e5 4e5 l5 ?Sic e5 * — — — jai t s:tt2s — — — i si l = •• a si 6 a- 500' ROAD Cm MUCTION AHEAD XW20-1 WOW ,000' 1 500' 1 507 1 500' hool 300' 1 w= AIWA 1100' 160 600' 1 600' 1 600' 0_**_�46 X05 4?3 46 4'6 500' 1 500' 1 500' 11M 300' 1 w0R1c AREA 1100' h601 500' I 600' 1 800' 1 ,000' TYPICAL APPLICATIONS OF TRAFFIC CONTROL DEVICES FOR SINGLE LANE TWO-WAY TRAFFIC WITH FLAGGER CONTROL DETAIL IS NOT TO SCALE 500' OID OONSiIpl I" XG20-2 60'x24 Z Q J CL w U Z Q Z W _Z U LL Q 1 Q dZ- Z Z O U W W U Q J Y V V) TW i U Ll Q SHEET NO. 12 oF 15 s fw " No' 12450 � s w 00 rZV M Z Q W J t` W 00 r W I Z g C) 00 W C.D U') r7 Z J LO 0) U) Z 0 Go U v z Z Q J CL w U Z Q Z W _Z U LL Q 1 Q dZ- Z Z O U W W U Q J Y V V) TW i U Ll Q SHEET NO. 12 oF 15 s fw " No' 12450 U_ SANITARY SEWER SPECIFICATIONS FOR CLAY TOWNSHIP REGIONAL WASTE DISTRICT 1. Standard specifications of the Clay Waste District and Indiana Department of Highways shall apply for all work and materials. Pipe shall be installed in accordance with Section 715. 2. Sanitary sewer pipe shall be PVC in accordance with ASTM D-3034 (S.D.R. 35) and ASTM 2321. PVC pipe shall have grooved bell and gasket. The pipe shall be made of PVC plastic having a cell classification of 124548. 3. PVC sewer fittings shall conform to the requirements of ASTM D-3034-89 specifications. Fittings In sizes through 8" shall be molded in one piece with elastomeric joints and minimum socket depths as specified in sections 6.2 and 7.3.2. Fittings 10" and larger shall be molded or fabricated in accordance with section 7.11 with manufacturers standard pipe bells and gaskets. Wall thickness of fittings shall be SDR 26 as defined in section 7.4.1 of the specifications. Gaskets for elastomeric joints shall be molded with a minimum cross-sectional area of 0.20 square inches and conform to ASTM F-477 specification. Fittings shall be manufactured by Harco or equal. 4. All sanitary manholes shall be "precast concrete" manholes in accordance with ASTM C- 478 and Section 720. 0 -Rings shall conform to C-443. Kent Seal or equivalent shall also be applied to oil joints and between riser rings and castings. Manhole step spacing shall be no more than 16 -inches. 5. Butyl rubber coating shall be applied around each manhole joint from 6 -inches above to 6 -inches below each joint. The appropriate primer shall be applied prior to applying the rubber coating. Inside joints to be filled with precoat plug material. 6. The casting elevations are set by plan. However, the castings are to be adjusted in the field by the Engineers representative, should a discrepancy occur between plan grade and existing grade. New manhole ring and cover shall be installed to establish grade. Maximum height of adjusting rings shall be 12 -inches. 7. Backfill around all structures and all cuts under paved areas with granular material. Trenches opening within 5 -feet of pave roadways shall be backfilled with granular material in accordance with Section 211. Backfill under sidewalks shall be granular, unless the walks are constructed a minimum of 6 months after backfill has been in-place. 8. The Contractor shall be responsible for verifying that all state highways, city and county permits have been obtained by the developer prior to start of construction. 9. The Contractor shall be required to furnish the developer's Engineer with a set of prints, marked in red pencil, showing actual sewer location and invert, to include lateral location, depth and length. Such as-built"prints must be received by the Engineer before the final contract payment can be authorized. The sanitary sewer laterals and stubs termination shall be indicated on the surface with a metal fence post set Immediately above said termination point. 10. All sanitary sewer. lines upon completion will be required to pass an infiltration weir test and a low pressure air test, unless otherwise directed by the Engineer. Said test shall be conducted according to NCPI Standard Method, and shall be witnessed by an Engineer and representative of the clay Waste District. 11. Deflection tests shall be performed on all flexible* pipe after the final backfill has been In place at least 30 days. No pipe shall exceed a vertical deflection of 5 percent deflection test results. ("The following are considered non -flexible pipes: concrete pipe, ductile iron pipe and cost iron pipe.) The deflection test shall be performed with a nine - point mandrel. Proving rings shall be available. 12. All mandrel testing shall be observed by a Professional Engineer for certification and a representative of the Clay Waste District. 13. The ends of lateral are to be plugged tight with a braced plastic disc or cap capable of withstanding a low pressure air test without leakage. 14. Bedding for flexible pipe shall be No. 8 crushed stone from 6 -inches below the pipe to 12 -inches above the pipe. Bedding for rigid pipe shall be No. 8 crushed stone from 6 - inches below the pipe to the spring line of the pipe and from this point to 12 -inches above shall be fill sand or equivalent. Manholes shall be placed on no less than 6 -inches of No. 8 crushed stone bedding. 15. Water and sewer line crossings and separations shall be in accordance with Ten States' Standards. 16. Trench shall be opened sufficiently ahead of pipe laying to reveal obstructions, and shall be property protected and/or barricaded when left unattended. 17. No Water shall be permitted to flow into the sanitary sewer system during construction. Contractor shall utilize a pump to keep the water level below the pipe. Pump discharge shall be directed to a storm outlet. Any pipe entering existing sewers shall be plugged, using a Mechanical Screw type plug, until such time as all tests on the sewers have been completed and the lines have passed all punch lists. 18. All sewer laterals installed by the mainline Contractor shall be bedded the same as the main line sewer. 19. Forty-eight (48) hours notice shall be given to the Clay Regional Waste District prior to the start of sewer construction. Also, 48 -hours notice shall be given prior to any testing done on the sewer. 20. Manhole castings shall be stamped "SANITARY SEWER" (Neenah Casting R 1642 or equal) and be self-sealing type. Waterproof castings shall be Neenah R -1916-F1 and stamped "Sanitary Sewer". 21. The minimum slope for sewer acceptance by the Clay Township Regional Waste District are: Size of Pipe Minimum Constructed Slope 8 -inch 0.40X 10 -inch 0.28X 12 -inch 0.22X 15 -inch 0.15X 18 -inch 0.12X 22. The Contractor shall provide measurements of the slope of the sewer for each manhole section as construction progresses. Such measurements shall be certified by a Registered Land Surveyor or Engineer and be available on-site for observation by the District's Inspector. No more than three manhole sections can be constructed in advance of such measurements. 23. In the event the Contractor does not most the minimum slopes, the sewer section and any other affected sewer sections shall be reconstructed to most such minimum slopes. FORMS/CLAYSANI TAMPED N PLACE SMD OACKAl A D/ f/=f J IL 0 6 O NOTE. ALL BEDOW A NTAIL BACKFILL SHALL BE INSTALLED N r TO 12' BALANCED LIFTS Dx2 (MAX) SANITARY SEWER SERVICE CONNECTION NOT -TO -SCALE GRADE 7,75 -: V: i. ♦ UAt%WVV' TADC 1 MATAD CYA11 O SANITARY SEWER SERVICE CONNECTION NOT -To -SCALE NOT -TO -SCALE MANHOLE FRAME do COVER SET ON KENT SEAL OR EQUAL r MIN. SLOPE 1 SHALL BE MAIN SEWER USE KENT SEAL OR EQUAL BETWEEN RISER RINGS (TYP.) BUM RUBBER BASE EXTERIOR BACK PLASTER MATERIAL 1/4-.* 1/16- MIN. THICK FORM 2" BELOW TOP OF CONE TO CASTING PER SPECS. ADJUST TO GRADE w/ ADJUSTING RINGS AS REQUIRED (2" MIN./12" MAX.) w/ KEYWAY w/ KENT SEAL OR EQUAL (PER SPECS.) BUM RUBBER BASE PRECAST REINFORCED CONCRETE ti EXTERIOR BACK PLASTIC MANHOLE CONE MEETING mp MATERIAL SHALL BE USED A.S.T.M. STANDARD C-478. 6" ABOVE do BELOW EACH MANHOLE SECTION JOINTS SHALL CONFIRM MANHOLE JOINT. TO A.S.T.M. C-443 w/ 0 -RING GASKET 4'-0" DIA. PRECAST BETWEEN SECTIONS PLUS 1/20 EXTRUDABLE REINFORCED MANHOLE GASKET (KENT SEAL OR EQUAL). SECTIONS MEETING A.S.T.M. STEPS SHALL BE POLYPROPYLENE, POLYPROPYLENE STANDARD C-478. COATED STEEL REINFORCING OR AN APPROVED NON- CORROSIVE FIBERGLASS MATERIAL THE COLPOLYMER IPE TO MANHOLE GASKET POLYPROPYLENE SHALL BE THE REQUIREMENT OF EETiNG A.S.T.M. STND. C-923 A.S.T.M.-4101 REINFORCED WITH 3/8" MINIMUM DIA. ALL BE CAST INTO MANHOLE REINFORCING STEEL CONFORMING TO THE REQUIREMENTS CTiON AT THE TIME OF OF A.,S.LM.-615 GRADE 60. ANUFACTORING, GASKET SHALL E DESIGNED TO WITHSTAND UP TOP OF BENCHWALL SHALL BE AT MIN., 0 10 P.S.I. OF WATER PRESSURE ELEVATION 0.8" TO THE CROWN .OF THE PIPE. CRETE BENCH WALL (CLASS B) BASE SHALL BE POURED IN PLACE * ' '�. • •'..' OR PRECAST BOTH SHALL HAVE #4 BARS AT 12" O.C. EACH WAY +• �` ..��w 4. L3" 1100 GRANULAR LEVELING MATERIAL (#2 STONE) REQUIRED W/PRECAST BASE 6" MIN. PRECAST REINFORCED CONCRETE MANHOLE FOR SANITARY SEWER NOT -TO -SCALE ACE MAN(ER Bor N"W N4 TOTAL WI HT -300 POUNDS /Y NOTE: MUST HAVE SANITARY SEWER STAMPED ON CASTING. 2" LETTERS RECESSED FLUSH WITH THE SURFACE. SANITARY MANHOLE CASTING NEENAH R-1642 (OR EQUAL) SELF SEALING WITH CONCEALED PICK HOLES. NOT -TO -SCALE HANG TAMPEID OR WALICED N 70 12" ABOVE WE BELOW THE BARREL MN. MWTH L25 (O.D.)--1i' BACK U 07H CLEAN GRANULAR MATERUIL PER REQUIREMENT Of INDIANA DEPARTMENT OF HItIfIWAYS (MECHANICAL COMPACTED TO 95X PROCTOR DENSITY} /B CRUSHED STONE HAND TAMPED OR WALX D IN To 1/2 O.D. PER SPEC. 08 HED STONE 1 HOE EXCAVA7M BEDDING DETAIL NOT -TO -SCALE 2500 psi CONCRETE CUT AWAY •TO BE USED WHEN CLEAR DISTANCE BETMIEEN PIPES IS 18" OR LESS, OR WERE NOTED ON THE DRAWINGS. CONCRETE CRADLE NOT -TO -SCALE 0 1 0-10111111U171y,,,, 19358 = 00 8TA7E OF \ ��uuanu�a` W F W v m a� a 0 W�b 316 do Z (n Ce C14 Q 00 D Z U) 00 � r V) W M v Z < Z n O U Q J (/'j W I 00 1 Z 0 o �'- LIO Z W I T- C' 'n Z J w = vs U V) 0 U 00 � � SHEET NO. 13 oF 15 mu. " ND` 12450 Q D Z U) .J Q 0 � � W U W Z W O U Q J U NN� �'- U V) Z� O U w = U W X. iY a SHEET NO. 13 oF 15 mu. " ND` 12450 U_ III. STORM SEWER CONSTRUCTION 1. Material Specifications: a. Reinforced Concrete Pipe (RCP) shall conform to ASTM C76-70. Class III latest revision, with joints conforming to ASTM C-433 latest revision. b. Corrugated Metal Pipe (CMP) shall be standard helical pipe with a minimum thickness of 0.05 inches. CMP shall only be used to extend existing CMP to the nearest proposed structure. C. All manholes and inlets shall be precast concrete conforming to ASTM C- 478 latest revision. d. Castings shall conform to ASTM -48 latest revision. 2. Subsurface drains shall be 6—inches in diameter located directly below the pavement/curb joint and shall run continuously at a minimum 0.20X slope along both sides of the street and shall be connected only into storm sewer structures. 3. There shall be a subsurface drain connection provided for each lot. V. GENERAL NOTES 1. It shall be the responsibility of the contractors to determine the location of existing underground utilities 24 hours prior to any construction or excavating and maintain operating conditions of active utilities. The engineer shall not be responsible for any damage caused by an erroneous location shown or by the omission of a utility location on these plans. The developer shall be responsible for all approvals, permits do easements. 2. Construction of private driveways is not included in this project. 3. The contractor shall, at the direction of the developer, endeavor to save and protect all trees of value and worth which do not impair construction of improvements as designed. In the event cut or fill exceeds 0.5 foot over the root area, the developer shall be consulted with respect to protective measures to be taken, if any, to preserve such trees. 4. Remove topsoil to a depth determined by the soils report from all street rights—of— way and building pad areas. Topsoil shall be stored at a location designated by the engineer. 5. All grading shall be completed to within a tolerance of 0.10 foot of the grades Indicated on the plans. The engineer shall be notified when the contractor has reached this point, so that field measurements and spot elevations can be verified by the engineer. The contractor shall not remove his equipment from the site until the engineer has verified that the job meets the above tolerance. 6• All areas disturbed by any construction shall be restored to its original or planned condition. Excess construction material shall be removed from the project area as directed by the Developer at the Contractors expense. Any construction materials brought onto the project to complete the project shall also be at the Contractor's expense. 7. The engineer shall be defined as Stoeppelwerth and Associates. Inc., Consulting Engineers. FORM\CLAYSPEC NOW: STEEL FENCE POST TE1i►OXARY EXIE1901 AIM CAP t TAPE H -Bar Size WAM TO E KMM UPON Ball Dia OO NCENN 10 NOUSE Inches ALL IEAgAMA JITS TO E 1/26 MEANS FM Mac OF CUII9. 1e• 1/2 4 5/114 TS PROPOSED Q AOE •� . • ­CASTING FRAME AND COVER AS SPECIFIED o e ! • 0 0 0 •o 3/4$ .0 .0 0 00 00 1 1/1 00 •0 0 0 • REp� T •e o p 6 (MN.) 0 0 SSO MAN 0 0 Ea�D 5/04 .e + slap£ wool 4 IOL 4' SSD 7-1/2 3' 3' .4' ' 3/44 1 4 TYPICAL SSD LATERAL TO INDIVIDUAL LOTS ALONG STREETS 10-1/2 NO SCALE HAWLTON COUNTY SURVEYORS OFFICE 1/2' MORTAR • =� RENSED: MASTIC PRECAST CONCRETE ADJUSTER RINGS IF STANDARD PIAN LL�II (� • 1 % WINM OR BUTYLRUBBER NEEDED. (4 MA)AIUM). COMPLETELY SEAL CASTING BEARING SURFACE WITH 311 MIXTURE OF SAND AND PORTLAND CEMENT, PRFORMED HOLE TO MAXIMUM OF PIPE O.D. 6' WITH NON -SHRINK CEMENT GROUT. MIN. 4' DIAMETER DACE 11LE0'0BENCH WALLS AT MINIMUM 'T' STUB *1ERE �-\ 1/2- PER FOOT SLOPE. arPRECAST BASE ------ -MANHOLE BASE SET MIN. S' OR Ir PER SECTION ON 6' OR 02 STONE J2r*M AR #4 STEEL MESH AREA - 0.12 IN 2/I:T. OR APPROVED EQUAL STANDARD MANHOLE FOR PIPE SIZES 12" THRU 24to (DRAWING NOT TO SCALE) 9* 10 aPf011 s' &M odes of OvArdo 3 bolt PW L4 aA NOTES: 1. OARS ! PI.A70 ARE NOT -ROLLED STE>E1. L GARB, PLATES & PIE ARE FlISSM 111117M 2 COATS OF AUAONAR PANT. IRAxTO AN GALVIiNKOUL 4. IM M PIA= A-10 ! A-11 rOR APR011 IR, TRASH GUAIOS TMTH OffFEKMT OWE= OARS ARE AVALAO<F. WqU& OIEOL TRASH GUARDS FOR CONC. APRONS NOT—TO—SCALE Apron Size V -Bar Size H -Bar Size No. of H -Bars Rsq'd Ball Dia 'A' I Dim Inches Inches 1/26 • 1/2 4 5/114 3 1/2 ­CASTING FRAME AND COVER AS SPECIFIED 1/2$ ! • 5/8$ 3/4$ 4 1 1/1 I p 30 5/04 '• ' Ir PRECAST CONCRETE 4 1 1/2 7-1/2 �a .4' ' 3/44 1 4 4 1/2 10-1/2 v • 1/2' MORTAR • =� 4 MASTIC PRECAST CONCRETE ADJUSTER RINGS IF CL �, 3/44 • 1 % H - OR BUTYLRUBBER NEEDED. (4 MA)AIUM). pC " .•. 3/46 1-1/2 P. 4 SEAL BEIM 12 a s0 3/44 1-1/2 P. 5 24' DIAMETER ECCENTRIC CONE OR REDUCER — CAP AS RQUIRED BY SITE 3/44 �..• 3/46 1-1/2 p ~ 1 3/4 CONDTIONS. CONE TOP TO : • SLOPE 2• TO 1-1/2 P. 6 1 3/4 MATCH ADJUSTING RING PROFILE. 3/4 4 i ; ' , CENTER I l e6 3/46 1-1/2 p. 6 3/4 6 72 3/44 ~ ! +. 6 3/4 FULL HEIGHT MANHOLE 64 3/4 4 . , J �" ' '~. "• f aD STEPS AS SPECIFIED. 90 3/44 1-1/2 P. 1 7 1 3/4 1 14 6' MINIMUM pwa Wei PUA - NN00�� AiANHOLE CONFORMS e• e• IIIIt&0"F1UA1l*T-NRW1 TO ASTM 478 UMWAW4FV7 >n I�RFy►a�m� �>• MATCH CASTING OPENING G>t1a O-RING GASKET NON- PRECAST CONC. fyl• �� �1♦ �� f�7 ASPHALTIC MASTIC OR SECTION . F3�7� Fa• 131 �fLl �.P.. BUTYL RUBBER SEAL 1• 1• . 11117150 MFX 1 FYWY71 AT JOINTS. PUL] Vim SIDE VIEW W51wrin PRFORMED HOLE TO MAXIMUM OF PIPE O.D. 6' WITH NON -SHRINK CEMENT GROUT. MIN. 4' DIAMETER DACE 11LE0'0BENCH WALLS AT MINIMUM 'T' STUB *1ERE �-\ 1/2- PER FOOT SLOPE. arPRECAST BASE ------ -MANHOLE BASE SET MIN. S' OR Ir PER SECTION ON 6' OR 02 STONE J2r*M AR #4 STEEL MESH AREA - 0.12 IN 2/I:T. OR APPROVED EQUAL STANDARD MANHOLE FOR PIPE SIZES 12" THRU 24to (DRAWING NOT TO SCALE) 9* 10 aPf011 s' &M odes of OvArdo 3 bolt PW L4 aA NOTES: 1. OARS ! PI.A70 ARE NOT -ROLLED STE>E1. L GARB, PLATES & PIE ARE FlISSM 111117M 2 COATS OF AUAONAR PANT. IRAxTO AN GALVIiNKOUL 4. IM M PIA= A-10 ! A-11 rOR APR011 IR, TRASH GUAIOS TMTH OffFEKMT OWE= OARS ARE AVALAO<F. WqU& OIEOL TRASH GUARDS FOR CONC. APRONS NOT—TO—SCALE 3 3 • � r ♦ ♦ TURNED AM BURIED MN. r 10P90L AN D291WUW UAt" NO BOMB TYPICAL SWALE DETAIL MATCH CASTING OPENING s• I I e• I It y� Apron Size V -Bar Size H -Bar Size No. of H -Bars Rsq'd Ball Dia 'A' I Dim Inches Inches 1/26 1s 1/2 4 5/114 3 1/2 6 1/2$ 24 5/8$ 3/4$ 4 1 1/1 7 p 30 5/04 3/44 4 1 1/2 7-1/2 �a 36 3/44 1 4 4 1/2 10-1/2 v 42 3/44 1 4 4 3/4 11 CL 40 3/44 1-1/2 P. 4 3/4 12 f 64 3/46 1-1/2 P. 4 3/4 12 1 3/4 4 s0 3/44 1-1/2 P. 5 1 3/4 14 3/44 72 3/46 1-1/2 p 6 1 3/4 14 84 3/4$ 1-1/2 P. 6 1 3/4 1 18 3 3 • � r ♦ ♦ TURNED AM BURIED MN. r 10P90L AN D291WUW UAt" NO BOMB TYPICAL SWALE DETAIL MATCH CASTING OPENING s• I I e• I It y� 12 1/2 4 5/8111 3 1 1/2 4 16 1/26 5/84 3 1/2 4-1/2 jir 1s 1/2$ 5/86 4 1/2 4-1/2 21 1/24 3/8111 4 1/2 6 0 24 5/86 3/46 4 1/2 3 e 27 5/86 3/46 1 4 1/2 6-1/2 OD 30 5/84 3/44 4 1/2 6-1/2 O a 36 3/46 1 4 4 3/4 s _ a 42 1 3/4 4 1 4 4 3/4 6 v 9 Fz= 3/44 1 4 6 3/4 s ix3/44 to 1-1/2 p. 6 3/4 s F�C37aFIi1� 3/4 4 1-1/2 p 6 3/4 s e6 3/46 1-1/2 p. 6 3/4 6 72 3/44 1-1/2 P. 6 3/4 9 64 3/4 4 1-1/2 p. 1 7 1 3/4 1 10 90 3/44 1-1/2 P. 1 7 1 3/4 1 14 3 3 • � r ♦ ♦ TURNED AM BURIED MN. r 10P90L AN D291WUW UAt" NO BOMB TYPICAL SWALE DETAIL MATCH CASTING OPENING s• I I e• I It y� • r 1 , •, .• jir \\\ �� It. •�. EmWniiiiiiz1•ap-A 0 0 •Ilk.,•, ... - .; Elm m 1r-A0WA TOP VIEW Ihlilihhhl�hlNl �� ` 10,- R -3501—N NEENAH CURB INLET FRAME, GRATE do CURB BOX DETAIL NOT -To -SCALE RIP—RAP DETAIL NOT -TO -SCALE — C - so 1 -0 0 'M 1 DIA .+ 1 -� Mi'ALL o.oT a�emvc-auruT A�w CTOMM-Da•I:T AILD SECTION -A •g."l�q�,� SPATE OF ,A,- 'Noom D Y l HORIZONTAL FLARE NOTES: 1. MANUFACTURE OF END SECTION IS IN ACCORDANCE WITH APPLICABLE PORTIONS OF A.S.T.M. SPECIFICATION C76. PRECAST CONCRETE END 5'-0» SECTION DETAIL 5'-0' VERTICAL FLARE SECTION B -B 1 1/4" 2 1 /2" [--a- 230 20' 1 1/2" 5 1/4" T I � 23 33' DITCH GRATE CASTING SETTING DETAIL NEENAH R-4342 STOOL TYPE DITCH GRATE NOT -TOS -SCALE } m EmWniiiiiiz1•ap-A 0 N�3 wrmwim Elm m 1r-A0WA f` OD LAJ w V F7F1�1L'F�1aiF ?7TIC �7VIIIA=K'91•OFM MEN 011�1•it>• Fz= 111111111K11111111FWAR;K-1YVI AZI #=TUOWToOF w-10 0tODla F�C37aFIi1� • .P � r'� C_>•L�IC��>•�:7[F' �F:lii•11C.'t�7�i:P>•��IL�1t����� [moi fir?ITZLlmz 11119M pwa Wei PUA IIIIt&0"F1UA1l*T-NRW1 UMWAW4FV7 I�RFy►a�m� �>• E1♦ G>t1a [�'7 `� fyl• �� �1♦ �� f�7 F?I1L7 X11 F3�7� Fa• 131 �fLl �.P.. IF1.7 1• 1• . 11117150 MFX 1 FYWY71 WN PUL] Vim W51wrin Kim EIMEI'E?1111111111til•ma0FatCWTV Kim L ZJpui1.• .• ` off =OFMK71MKriMiI<ullillommNFMZ/a fr7�Otl•iiFz�Pl�'�fZ>•��R�>•QPTI•��LT•»L7iiF�FI7L.' [a• W=if>•UTLMOFMiFI>tl_�11111111 [FT41111111 111111FMmuz ORE E>• HORIZONTAL FLARE NOTES: 1. MANUFACTURE OF END SECTION IS IN ACCORDANCE WITH APPLICABLE PORTIONS OF A.S.T.M. SPECIFICATION C76. PRECAST CONCRETE END 5'-0» SECTION DETAIL 5'-0' VERTICAL FLARE SECTION B -B 1 1/4" 2 1 /2" [--a- 230 20' 1 1/2" 5 1/4" T I � 23 33' DITCH GRATE CASTING SETTING DETAIL NEENAH R-4342 STOOL TYPE DITCH GRATE NOT -TOS -SCALE } m 0 000 In 00 � r V M Z a Q LL. J � I F MD 00 I w r4- Ld I z g 00 WrlM Z CA J � � •er U) 00 Z 0 U � � z O z V Z J 0 LLJ U p W V) Z Ld 0 U — Q U FV— ) U V Z V)O w U = UJ LLIQ U SHEET NO. 14 OF 15 emu " Na 12450 0 N�3 z f` OD LAJ w V 0 000 In 00 � r V M Z a Q LL. J � I F MD 00 I w r4- Ld I z g 00 WrlM Z CA J � � •er U) 00 Z 0 U � � z O z V Z J 0 LLJ U p W V) Z Ld 0 U — Q U FV— ) U V Z V)O w U = UJ LLIQ U SHEET NO. 14 OF 15 emu " Na 12450 I. STREET CONSTRUCTION i 1. All new pavement construction shall comply with current Hamilton County Road Standards and those of the Indiana Department of Highways (IDOH), with respect to design. materials and methods of construction. 2. The upper 6 -inches of subgrade shall be compacted to 95X standard proctor density with proper moisture control. 3. Trenches within the subgrade area shall be backfilled with granular material compacted in lifts to conform with Section 715.08 of the Standard Specifications. 4. Subgrades & backfilled excavations shall be inspected and tested by the County Engineer and approved prior to paving. j 5. No traffic will be permitted on the subgrade prior to paving. . j 6. Proof rolling (if required) shall be done with a rubber tired roller in accordance with Section 203.26 of the Standard Specifications. I 7. Any unacceptable portions of the subgrade must be corrected by the contractor by methods acceptable to the County Engineer, reinspected and approved by the County Engineer prior to paving. II. CURB, GUTTER AND SIDEWALK CONSTRUCTION I 1. All concrete used to construct curbs, gutters and sidewalks within the street rights- of-way shall be Class A and shall be properly cured and protected against loss of moisture and extreme temperatures by methods approved by the County Engineer prior to construction. 2. All concrete shall be protected from rain damage. Any concrete damaged by rain shall be replaced at the Contractor's expense. 3. 1 -inch Transverse Expansion Joints will be required at all cold pints and on each side of all inlet structures. Joints shall be filled with preformed joint filler. 4. Transverse Construction Joints shall be installed at 10 -foot intervals, and shall be filled with 1/4 -inch preformed joint material. 5. Curbs shall be promptly backfilled after curing protection has been applied. Backfill shall be compacted as soon as practical below the curb. Regrading will be necessary as the backfill settles to insure grade below the curb. 6. All sidewalks shall conform to Section 604.03 of the Standard Specifications. Sidewalks will be 4'-00 in width and 4 -inches thick, except where crossing driveways they shall be 6 -inches. rn U (n Cn CTI r4 iii CzAi C11 t7l .. a .rI c.. U. J I- rn Q In 0 to .F ru .ti LD a 0 i 0 >n 40 FT. HALF R/W 12'-0" PAVEMENT D' -O" 7'-0" MIN. ll* -O" MIN. 2'- " 4'.O"W, r24- CONC. orate e . 4 U J. e • ;0 6 E, MIK TBP. I SLOPE; ' * 1/2' "AR FT. SLOPC: I.MI Q .•.:,. o tW WASHED GRAVEL • e : o •: -.00 OR CLASS A :i'.o' o :. 1 N" ►!: -- ..� SLOPE- 1/4- PER FT. M. ` .o ., 1 r OPG h /2- PER FT. slope is r eU-pFC + I l 0 NOTES: N Standard Spec keMsns. L ," K USED TIME11ER OR 11DU NCD1ty AMYN EK a Ubderdrein shot root be nstaled until utilities booted beneoN the units 1 a s we in plow. 1 , 6- a?& STONE SIDEWALK WHERE REOUIREO, �! Q e • o . e • • e s . • o • • • REVISED: RECOMEiDED: ,fir �3 PAVEMENT SECTION f►S REOLARED E OF SM Of1tH I a EY ORDINANCE rN. Icr Romm I P-1 APPROVED: 'Y- 6-�3 hhArLMw SAW -- .Y 1 $ Z 0 0 Z CD 00 3' Z NUTTER MAW (MIK 48' DEEP) �� w e M TAP TO HOUSE 6' V • e e e ,• O a) i= if) O '•e'•o'eo'•o'ee'•o'•e res N STANDARDRC OSS_ -SECTION � N 00 HAMILTON COUNTY HIGHWAY COLLECTS STREET w/o CURB Depth shall be 24' below top of book of Orb. t` v z .e •diad •diad •dies SCALE: re s' -o" ..) e e e• e o e 1.) AN tops, laterals. pushes, bores and *or underground rood crossings for d utilities shd be at = a VARIATION FROM THIS SHALL BE APPROVED IN WRITING BY COUNTY ENGINEER. = Q operation N to be used Subsegswll to the underdreins being insldb4 NO trenching or plowing Mil be a", 5'-0" WHERE REOUIRED BY ORDINANCE. won the rood or Orb subbase for ullky bsldotiom within the r/w. IS mo owl shd cui* of Ue oodt W p bindw, surface or concrete be dowel No undercultng of In place curbs at be plowed rYl t ACTUAL WIDTH To BE BASED ON HYDRAULIC REQUIREMENT OF SPECIFIC SITE. 3.) Any repairs to the underdron system shall be inspected by the Surveyor's Ofka " o reguloled drain is j1 involved, otherwise by the Hamilton County Highway Deporlasnt. I 41 W 4.) Water top k gas tap pits shd be granular backfilled to within 10' to the top of curb. r EAR 1H OR SIDEWALK SURFACE r24- CONC. orate e . 4 � • o J. e • ;0 6 E, 4 inch (100 mm) � .•.:,. o tW WASHED GRAVEL • e : o •: -.00 OR CLASS A :i'.o' o :. WASHED STONE • • • • • • • • • .o ., o MN d • PIPE OIAIE1EJt 12• MN. CAW M EIECOC At > > MIRIOE LIMES MAY NOTES: hstdalm of u.dortraw shall conform to section 718 of the Indiana Department Of Trenperiefien Standard Spec keMsns. Underdrans shat not be misled unit lihd gralnq and comp Wen is - 0 led an sub8rede. K USED TIME11ER OR 11DU NCD1ty AMYN EK a Ubderdrein shot root be nstaled until utilities booted beneoN the units 1 a s we in plow. (i.e. eNermoim, storm seers, sanitary sows, Oct.) PIPE UNDERDRAIN NO SCALE 011e! 1W EASEIM. e • o . e • • e s . • o • • • REVISED: RECOMEiDED: ,fir �3 STAND" PLAN Icr Romm I P-1 APPROVED: 'Y- 6-�3 hhArLMw SAW 01161111110 cram tAsEIII+E) 1 $ Z 0 0 � 0/(MW. 42' DEEP) CD 00 3' Z NUTTER MAW (MIK 48' DEEP) �� w e M TAP TO HOUSE 6' V • e e e ,• �) a) i= if) nns Conduits for future utility crossings may be :stalled after uderdra '•e'•o'eo'•o'ee'•o'•e res N Z, t prior to curb k pov-- I N desired to avoid future bores d W. N 00 Depth shall be 24' below top of book of Orb. t` v z .e •diad •diad •dies = NOTES: e e e• e o e 1.) AN tops, laterals. pushes, bores and *or underground rood crossings for d utilities shd be at = o minimum of 46' below the pavwI II surfoa to avoid deflections whtah well damage The audsidrdn system. 2.) AN uIlties to be installed under the road or curb shah be Installed prior to led undsrdrdns N o trenching operation N to be used Subsegswll to the underdreins being insldb4 NO trenching or plowing Mil be a", > won the rood or Orb subbase for ullky bsldotiom within the r/w. IS mo owl shd cui* of Ue oodt bindw, surface or concrete be dowel No undercultng of In place curbs at be plowed rYl t 3.) Any repairs to the underdron system shall be inspected by the Surveyor's Ofka " o reguloled drain is j1 involved, otherwise by the Hamilton County Highway Deporlasnt. I 41 V VA 4.) Water top k gas tap pits shd be granular backfilled to within 10' to the top of curb. [T1 -'i 5.) This tpkd dell applies only to roads having the R/W and easement characteristics as Siam on this plon. 6.) AN depths measured tam lap of back of Orb. _4 m S 7.) Deviations wit repairs o variance ham the County Engineer. C ' TYPICAL UTILITY LOCATIONS AND LOCAL ROAD CROSSING DETAIL NO SCALE r EAR 1H OR SIDEWALK SURFACE r24- CONC. orate e . 4 � • o J. e • 00 0 00 c 00 SUMADE AGGREGATE • • a e 0 - 0 0 .c e O O O DEPTH VIRES 4 inch (100 mm) � .•.:,. o tW WASHED GRAVEL • e : o •: -.00 OR CLASS A :i'.o' o :. WASHED STONE • • • • • • • • • .o ., ' HAMILTON COUNTY HIGHWAY DEPARTMENT , MN d • PIPE OIAIE1EJt 12• MN. 18' MAX. LII. 6' 5181 SINIFACE WAIN NOTES: hstdalm of u.dortraw shall conform to section 718 of the Indiana Department Of Trenperiefien Standard Spec keMsns. Underdrans shat not be misled unit lihd gralnq and comp Wen is - 0 led an sub8rede. Any awlwanelien of underdrom backfill shell be rsrnoved prior to rvet"ism of oprepNe bees. Ubderdrein shot root be nstaled until utilities booted beneoN the units 1 a s we in plow. (i.e. eNermoim, storm seers, sanitary sows, Oct.) PIPE UNDERDRAIN NO SCALE HAMILTON COUNTY HIGHWAY DEPARTMENT e • o . e • • e s . • o • • • REVISED: RECOMEiDED: ,fir �3 STAND" PLAN 1110111.1111111 own M P-1 APPROVED: 'Y- 6-�3 hhArLMw SAW UTILITY 25' R (D 25' R/W (11 UTILITY EASEMENT EASEMENT A WNIWM FROM 3' I 3 ACK MINIMUMI BSI M IJ NOTES: 1.) R/W shot be increased when rood width (b -b pubs) exceeds 30'-0'. 2.) Only gas k water utilities ore allowed to be located in R/W. AN others shall be located in the utility easements, except to cross rood. 3.) Deviations will require a variance during the permit process. TYPICAL UTILITY LOCATIONS ON A LOCAL ROAD NO SCALE HAMILTON COUNTY HIGHWAY DEPARTMENT REVISED: RECOMENDED:�� •j-t_�� STANDARD PLAN 1011 mUN1Y [ WTE ■ , - w APPROVED: 101-'s -Y r U 1 101*1011 OMIT ansate DAIS t>ulj 1W 4' ONR OWALK 1' #11 H.A.C. MWACE 3' p e IIX H.AQ-� O DER SMINE BASE (MAX H.CJLS. TYPE I 4.5 24' 3' 70P -SX' S is for Storm Sewer SS is for Sanitary Sewer D is for Subsurface or Base Drain C is for Conduit G is for Gas W is for Water 4 inch (100 mm) � NO SCALE NOTES: 1. Curb to be stamped at all locations where any of Uwe above cross under a pub. 2 Letter to be stamped pear to concrete setting up, whenever possible, 3. Stomp to be o minimum of 1/2 inch (10m) deep. CURB STAMP ' HAMILTON COUNTY HIGHWAY DEPARTMENT , BACKFILL REVISED: _113-114-41" u - STANDARD PLAN ftECOIlEN0E0: MAIa tarn-n� C-6 e.••e ••off •e•••e�e•e�e'e�e•e • • e . e o . • e • o . e • • e s . • o • • • SUBGRADE AGGREGATE cacao ••o •'o•••o•••e.••e•••o• DEI%VARIES V) LLJ I 00 CNI `i w Z 0 0 CD 00 3' W I 6' V • e e e ,• Z a) i= if) '•e'•o'eo'•o'ee'•o'•e res N N 00 o'•o'•o'•s'•o'•o'•o . t` v z .e •diad •diad •dies e e e• e o e NOTES: Expansion pints ore required at Storm Weis. Contraction joints should be installed of 10' spacings. Spacing shall oe 5' on curve radii. Contraction pals shall be ladled or even in continuously pared curbs to a depth of 1/2' min. CONCRETE ROLL CURB & GUTTER NO SCALE HAMILTON COUNTY HIGHWAY DEPARTMENT REVISED: } RECOMENDED: 4t- 13 STANDARD PLAN «feta mum team rw APPROVED: S/• 4 , C - 1 -*WIN mum eltemw OAR 3" to 47 (75mm TO 100mm) HIGH LETTER TO BE STAMPED AS FOLLOWS: S is for Storm Sewer SS is for Sanitary Sewer D is for Subsurface or Base Drain C is for Conduit G is for Gas W is for Water 4 inch (100 mm) � NO SCALE NOTES: 1. Curb to be stamped at all locations where any of Uwe above cross under a pub. 2 Letter to be stamped pear to concrete setting up, whenever possible, 3. Stomp to be o minimum of 1/2 inch (10m) deep. CURB STAMP ' HAMILTON COUNTY HIGHWAY DEPARTMENT , REVISED: _113-114-41" u - STANDARD PLAN ftECOIlEN0E0: MAIa tarn-n� C-6 APPROVED �_/3 / _ MIOL �b M[ n M I 3W PAVEMIEWT BI1lNIANOLIS SURFACE E10PEo 1/1! / FT. TYPICAL STREET CROSS SECTION No SCALE .113' .µ..1W331 ONDUU ER tECiION alta SEC110?I MASALDOW en�SHALL TS -W WAY. �K OIIOOIANCf �! 3� To io TCNM!1 lDOS1M00R SOD AS IEQURW PA%IMMT SIWACE eeZ4011127M dtADE Vf f � f � obon � f STANDARD FULL DEPTH GRANULAR BACKFILL DETAILS STANDARD PLAN 92-01 do 92-02 NOT -TO -SCALE NM. 1) E MAXMAXSLOPE () OF RAMPS IS 1:12 2 ALL RAID SURFACES 10 HAVE DIE ECiIBLE WAPOM SLIWACE 1NAT OOIPLIES WIN A.D.A REauftamiS. 3) NOW BUILDER'S OaNTRACTOR IS RESPIONSIOLE FOR 1HE INSTALLAiM (► THE A D RAMP Ml1H TACiU SURFACE - 010 RAISED DOMES NOR PAINT) TYPICAL HANDI-CAPPED RAMP AT CORNER NOT-10-8C4LF ouero 100• TOP OF CURB L� � a • •, •- - PAVEIENT BOTTOM OF CURB TRANSVFR>E E1PAnffigd Mn VAlIBVtRgE OONOACiION JOBITS WHEN BUILT IN CONJUCTION tlATH CONCRETE PAVEMENT. EXPANSION AND CONTRACTION JOINjS SHOULD BE PLACED AT THE SAME LOCATIONS AS IN THE PAVEMENT SLABS. THE CURB AND GUTTER SHOULD BE TIED TO THE PAVEMENT BY 1/2' ROUND DEFORMED BARS AT ABOUT 3 FOOT INTERVALS. IF NO CONCRETE PAVEMENT IS BEING BUILT AT THE TIME THE CURB IS CONSTRUCTED. EXPANSION JOINTS SHOULD BE PLACED AT THE ENDS OF ALL RETURNS AND AT INTERVALS NOT TO EXCEED 100 FEET. CONTRACTION JOINTS SHOULD BE INSTALLED AT 20 FOOT SPACING. CURB JOINT DETAIL SLOPE: 1/4• / FT. PREPARE 9U41110110tADE COMPACTED TO DBNU IITANDMD PROCUR MOiL 0610 - 0.15 GAL/IU YD. OF TYPE AE -T ASPHALT DA LOW 110 t1E APPLIED fE11EEls EACH LAYER OF ■11U1M11M s M11i=& SMOL AND FACE OLMS, TACK COAT MA SPECT. 17 1-1.n.�s.IL1 IN11I1.0 a 11. A I71 s s WWz F c n r. A N 3 1001 z ,,,,`vaeeeeeeeeu,,,, ° 00 8TAim of n ���usaespeee.�` W • a F W U OO °�1' z 11.1 0) 00 F, � M z a Q u - J n I V) LLJ I 00 CNI `i w Z 0 0 CD 00 W I V :ilii M Z a) i= if) J res N N 00 Z 0 U t` v z Q W Cel SHEET NO. 1fo15 Sitz. 'IDB N0` 12450 a