HomeMy WebLinkAbout327236 07/10/18 `� '��''• CITY OF CARMEL, INDIANA VENDOR: 367635
s
ONE CIVIC SQUARE PRECISION CONCRETE CUTTING CHECK AMOUNT: $****50,786.09*
CARMEL, INDIANA 46032 HOLLAND MI DRIVE CHECK NUMBER: 327236
CHECK DATE: 07/10/18
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
2201 R4350900 101190 180435-1 11,169.95 SIDEWALK TRIP HAZARD
2201 R4350900 101190 180435-2 4,780.31 SIDEWALK TRIP HAZARD
2201 R4350900 101190 180435-7 6,440.63 SIDEWALK TRIP HAZARD
2201 R4350900 101190 180535-3 174.38 SIDEWALK TRIP HAZARD
2201 R4350900 101190 180535-4 12,675.19 SIDEWALK TRIP HAZARD
2201 R4350900 101190 180535-5 4,400.63 SIDEWALK TRIP HAZARD
2201 4350900 180535-6 5,727.44 OTHER CONT SERVICES
2201 R4350900 101190 180535-6 1,252.66 SIDEWALK TRIP HAZARD
2201 4350900 101209 180535-6 4,164.90 SIDEWALK TRIP HAZARD
VOUCHER NO. WARRANT NO. Prescribed by State Board of Accounts City Form No.201 (Rev.1995)
ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
Vendor# 367635
PRECISION CONCRETE CUTTING IN SUM OF$ CITY OF CARMEL
1896 GOLDENEYE DRIVE An invoice or bill to be properly itemized must show:kind of service,where performed,dates service
rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
HOLLAND, MI 49424
Payee
$5,727.44
Purchase Order#
ON ACCOUNT OF APPROPRIATION FOR
Street Department Terms
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
180535-6 43-509.00 $5,727.44 1 hereby certify that the attached invoice(s),or 5/3/18 180535-6 $5,727.44
2201 2201 2201 2201
bill(s)is(are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Monday,July 02, 2018
Huffman, Dave
Director
I hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
' 20—
Cost
20Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer
INVOICE Summary
Invoice: 1805.35-6
Date: 05/03/18
` � R
��®: ��'� "���;��,•�¢ ��,����������"� �`-� _..-_ �---� Purchase Order:
Trip Hazard Removal Specialists
• Supplier Number:
Bill to: Remit to:
Job Site: Precision Concrete,Inc.
village of West Clay City of Carmel
attn:Jim Hobbs 1896 Goldeneye Drive
contact:Jim Hobs Holland,MI 49424
Area 6,see locations below 3400 W.131st St
Carmel,IN 46032 Carmel,IN 46074
(616)403-1140-phone
Work Completed: Phone: (317)733-2001 (616)582-5951-fax
1-May-18
Fax: Federal ID#:.80-0183496
Email:jhobbs@carmel.in.gov
Cost Per Inch Foot
$30 00
y z. ., y -.•'•r x H `f4 4tfia�),a�ywt"d ,,.5..1l��( 3{h '�-,,�.,
I'•, ' r`.'�ir`s�T k*,r"'dti: 3�.,4+r4��+f � i Yk, •'.t��iq+sn"t -.'u'r`ns.:f ti.v=i; w51�i.yew Pf '`d':eyr �Y '-,`.k ij S?t�^SR�y\. •w iN's'.4F
kj a+ a ? E Ytarei,�{ .' '� 1 Sf�l'.b yf' t-�' a`s a•^,�r�,fi7M1L` +t�, Lt, �{w't''�wi.+,-o1i', r e 5,, t i j 'i';i"+i'D aZ.1S`:rFs5�u.A tl .§
- ��MTS ;h '.rG- "YF ia7 v .i•, XYZ'}�� l U ��`^c�``I5. 1. flt'F.� �•.,. ,{a 4- Sr.�! �,
r', 5 ���.,���''�i���:�}al t"i"r'� u`k�'af�c.,��R�+ xrv�'��7S.a'12•.A...t.� �.�.,,.'-�, `�tt,',�1�',y' "i '.�t_.� of Tl'1 ,�7 :i•l:lneap .�,3'r.,fi�ts", tt-:.E���. ,'�'i a+f l. 'F
.F�e"���&, n� ��i. 1��1,�•1?��,
�p
kr mr.. �v ? F ,, l,.# tlS,r.,rt3 a �TtuEktkv� v. lt � w, , .�r,-F �14ywt� CE ;:n.•.,ss •� rrt M, ION s,a311....1�._.7.
0 13 52.5 30.72 $921.56
1 Mowbray St
. p 26 94.5 42.91 $1282.19
2 Bellin rath St
98.0 32.50 . '$975.00
3 Telfair St
4 Meeting House Rd 1=6 233.5 96.22 $2,886.56
100.0 45.44 $1,363.13
5 Burke Dr
68.0 34.56 $1;036.88
6 Horesham St
1515 71.72 $2,151.56
7 Branford St 44.0 17.44 $523.13
8 Hermitage Ln,
1 232' 842.0 371.50 1 $11,145.00
Approved'Project Budget: $11,145.00
Travel and Expenses: $0.00
Invoice Totat(Amount Due): $11;145.00_
Terms: Net 15
Project Name: Sidewalk Trip Hazard Removal 2018
Notes: This invoice is forwork completed by Precision Concrete Cutting(PCC)based on the November20,2017 proposal as accepted by Jim Hobbs.
Work was performed April 30,2018 thru May 1,2018.
Audit completed,onsite walk thru with Jerry Timer(Precision Concrete)on May 1,2018.
PCC removed the trip hazards within specification making a slope according to customer specifications for the specified Areas or Jobs.
All concrete has been cut to a.neat and uniform finish.
Each trip hazard has been cut to a,o"point of differential(0 inch vertical height delta)
Each trip hazard has been completely cut all the way to the edges of the walkway(sod and temporary patches removed)
All areas around cuts including walkways,grass,and landscaping left clean.
Itemized invoicing(Invoice Detail)per cut is attached for your audit.
APPROVALS(acceptance of work completed):
Precision Concrete,Inc.
Customer
Name:Sarah Tem le Name:
Position: Pro'ect Coordinator
Position:
Signature:ignature:
Date:
Date:
Form:INVOICE 180535-6 for City of Carmel-village of West Clay
Summary
form vB
VOUCHER NO. WARRANT NO. Prescribed by State Board of Accounts City Form No.201(Rev.1995)
ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
Vendor# 367635
PRECISION CONCRETE CUTTING IN SUM OF$ CITY OF CARMEL
1896 GOLDEN EYE DRIVE An invoice or bill to be properly itemized must show:kind of service,where performed,dates service
rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
HOLLAND, MI 49424
Payee
$4,164.90
Purchase Order#
ON ACCOUNT OF APPROPRIATION FOR
Street Department Terms
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
101209 180535-6 43-509.00 $4,164.90 1 hereby certify that the attached invoice(s),or 5/3/18 180535-6 $4,164.90
2201 2201 2201 2201
bill(s)is(are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Monday, July 02,2018
Huffman, Dave
Director
I hereby certify that the attached invoice(s),or bill(s), is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
' 20-
Cost
20Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer
INVOICE Summary
50M Ut k-1 01 FM
tollInvoice: 1805.35-6
**# , 1 I 54� t . Date: 05/03/18
��t 4,
• frj]l, a `` Purchase Order:
Trip Hazard Removal Specialists
Supplier Number:
Job Site: Bill to: Remit to:
Village of West Clay City of Carmel Precision Concrete,Inc.
contact:Jim Hobs attn:Jim Hobbs 1896 Goldeneye Drive
Area 6,see locations below 3400 W.131 st St Holland,MI 49424
Carmel,IN 46032 Carmel,IN 46074
(616)403-1140-phone
Work Completed: Phone: (317)733-2001 (616)582-5951 -fax
1-May-18 Fax: Federal ID#:,80-0183496
Email:jhobbs@carmel.in.gov
Cost Per Inch Foot
$30.00
Y`�s^ -. �.
y^ s ,a R yrrsx. r x3�'-� s., M1f-..xir '��. :+n"' ,�':, � �,f.- fi e `^3 i'�RI.aria•.
#,�Kr' S"`",c;,.,te t "Avr �'"; p,�6Fs. `fq r _Pe, *�}``S yr„. s L., 3'-`, } hi4`. .s,
v:> R, r, "+ ..'r.nibjuSrr l(Remoir0
ipa _ M- -4M �r .F�.>I'ceior$f#ofTn
P � �QF�y
s� 7 u '� 4th > uar oof_ .1� Feet klnch�Feetti�� ,uM Cost�s ?.x
�.Fxn r.�(� nSOo ,8,s F'HazattlS Cut,rim ..
Area .�.9. . .
1 Mowbra St 0 13 52.5 30.72 $921.56
2 Bellincirath St 0 26 94.5 42.91 $1,287.19
3 Telfair St 0 27 98.0 32.50 . $975.00
4 Meetin House Rd 1 68 233.5 96.22 $2,886.56
5 Burke Dr 0 26 100.0 45.44 $1,363.13
6 Horesham St 0 20 68.0 34.56 $1,036.88
7 Branford St 0 40 151.5 71.72 $2,151.56
8 Hermitage Ln 0 12 44.0 17.44 $523.13
1 232 842.0 371.50 $11,145.00
Approved Project Budget: $11,145.00
Travel and Expenses: $0.00
Invoice Total;(Amount Due): $11,145:00
Terms: Net 15
Project Name: Sidewalk Trip Hazard Removal 2018
Notes: This invoice is for work completed by Precision Concrete Cutting(PCC)based on the November 20,2017 proposal as accepted by Jim Hobbs.
Work was performed April 30,2018 thru May 1,2018.
Audit completed,onsite walk thru with Jerry Timar(Precision Concrete)on May 1,2018.
PCC removed the trip hazards within specification making a slope according to customer specifications for the specified Areas or Jobs.
All concrete has been cut to a neat and uniform finish.
Each trip hazard has been cut to a"0"point of differential(0 inch vertical height delta)
Each trip hazard has been completely cut all the way to the edges of the walkway(sod and temporary patches removed)
All areas around cuts including walkways,grass,and landscaping left clean.
Itemized invoicing(Invoice Detail)per cut is attached for your audit.
APPROVALS(acceptance of work completed):
Precision Concrete,Inc. Customer
Name:Sarah Temple Name:
Position: Project Coordinator Position:
Signature: Signature:
Date: Date:
Form:INVOICE 180535-6 for City of Carmel-Village of West Clay
Summary
form v8
VOUCHER NO. WARRANT NO. Prescribed by State Board of Accounts City Form No.201 (Rev.1995)
ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
Vendor# 367635
I
PRECISION CONCRETE CUTTING N SUM OF$ CITY OF CARMEL
1896 GOLDEN EYE DRIVE An invoice or bill to be properly itemized must show:kind of service,where performed,dates service
rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
HOLLAND, MI 49424
Payee
$40,893.75
Purchase Order#
ON ACCOUNT OF APPROPRIATION FOR
Street Department Terms
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
101190 180435-7 43-509.00 $6,440.63 1 hereby certify that the attached invoice(s),or 4/30/18 180435-7 $6,440.63
2201 Encumbered 2201 2201 2201
101190 180435-2 43-509.00 $4,780.31 bill(s)is(are)true and correct and that the 4/30/18 180435-2 $4,780.31
2201 Encumbered 2201 materials or services itemized thereon for 2201 1 2201
101190 180435-1 43-509.00 $11,169.95 4/30/18 180435-1 $11,169.95
which charge is made were ordered and 2201 2201
2201 Encumbered 2201
101190 180535-6 43-509.00 $1,252.66 received except 5/3/18 180535-6 $1,252.66
2201 Encumbered 2201 2201 2201
101190 180535-5 43-509.00 $4,400.63 5/3/18 180535-5 $4,400.63
2201 Encumbered 2201 2201 2201
101190 180535-4 43-509.00 $12,675.19 5/3/18 180535-4 $12,675.19
2201 Encumbered 2201 2201 2201
5/3/18 I 180535-3 I $174.38
101190 180535-3 43-509.00 $174.38
Monday, July 02, 2018 2201 2201
2201 Encumbered 2201
Huffman, Dave
Director
I hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
20
Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer
INVOICE Summary
ORS xI� I Invoice: 180435-1
coNr1 Date: 04/30/18
Trip Hazard Removal specialists Purchase Order:
Supplier Number:
Job Site: Bill to: Remit to:
Village of West Clay City of Carmel Precision Concrete,Inc.
contact:Jim Hobs attn:Jim Hobbs 1896 Goldeneye Drive
Area 1,see locations below 3400 W.131st St Holland,MI 49424
Carmel,IN 46032 Carmel,IN 46074
(616)403-1140-phone
Work Completed: Phone: (317)733-2001 (616)582-5951-fax
25-Apr-18 Fax: Federal ID#:80-0183496
Email:jhobbs@carmel.in.gov
Cost Per Inch Foot
$30.00
Job • RR(Remove .
,No. - and.Replace)or #of Trip Linear'
(Area). Location. .out of scope Hazards Cut .Feet; ` ...Inch Feet •'.= Cost
1 Chartwell St 1 17 60.5 24.13 $723.75
2 Archdale St 0 11 38.5 24.25 $727.50
3 1 Friar's Ln 0 1 3 12.5 1 7.34 $220.31
L104 Filson St 0 13 33.0 16.38 $491.25
5 Academ Lane E and W Dr 0 9 26.0 13.16 $394.69
6 Chew St 0 7 27.0 9.00 $270.00
7 Horbeck Stand Greencroft St 0 4 15.0 4.81 $144.38
8 Deers ne Green St 2 66 216.0 89.31 $2,679.38
9 Trowbridge High St 0 27 87.5 43.66 $1,309.69
Treaty Line St 0 21 88.0 30.66 $919.69
11 Glebe St 1 57 183.5 68.06 $2,041.88
12 Tradd St 5 60 197.5 67.91 $2,037.19
13 Broad St 1 66 230.5 72.41 $2,172.19
14 Greenville St 0 12 1 36.5 10.94 $328.13
15 University Crescent 0 23 73.0 21.19 $635.63
16 New Market St 0 2 8.0 1.50 $45.00
10 398 1.333.01 504.69 1 $15140.63
Approved Project Budget: $11,169.95
Travel and Expenses: $0.00
Credit Applied for Out-Of-Scope Work -$3,970.68
L_Inv_o)ce Total(Amount Due)_-_$11,169.951
Terms: Net 15
Project Name: Sidewalk Trip Hazard Removal 2018
Notes: This invoice is for work completed by Precision Concrete Cutting(PCC)based on the November 20,2017 proposal as accepted by Jim Hobbs.
Work was performed April 10,2018 thru April 25,2018.
Audit completed,onsite walk thru by Dave Reiner(Precision Concrete)on April 25,2018.
PCC removed the trip hazards within specification making a slope according to customer specifications for the specified Areas or Jobs.
All concrete has been cut to a neat and uniform finish.
Each trip hazard has been cut to a"0"point of differential(0 inch vertical height delta)
Each trip hazard has been completely cut all the way to the edges of the walkway(sod and temporary patches removed)
All areas around cuts including walkways,grass,and landscaping left clean.
Itemized invoicing(Invoice Detail)per cut is attached for your audit.
APPROVALS(acceptance of work completed):
Precision Concrete,Inc. Customer
Name:Sarah Temple Name:
Position: Project Coordinator Position:
Signature: Signature:
Date: Date:
Form:INVOICE 180435-1 for City of Carmel-Village of West Clay
form v8
Summary
INVOICE Summary
4'.
Invoice: 180435-2
/ P ��` �EM' r��f� Date: 04/30/18
Tdp Hazard Removal Specialists Purchase Order:
Supplier Number:
Job Site: Bill to: Remit to:
Village of West Clay City of Carmel Precision Concrete,Inc.
contact:Jim Hobs attn:Jim Hobbs 1896 Goldeneye Drive
Area 2,see locations below 3400 W.131st St Holland,MI 49424
Carmel,IN 46032 Carmel,IN 46074
(616)403-1140-phone
Work Completed: Phone: (317)733-2001 (616)582-5951-fax
30-Apr-18 Fax: Federal ID#:80-0183496
Email: jhobbs@carmel.in.gov
Cost Per Inch Foot
$30.00
Job; RR(Remove
No. and Replace)or I of Trip Linear
(Area); Location; out of scope Hazards Cut ,'Feet InchrFeet Cost
1 Frogmore St 0 2 8.0 2.50 $75.00
2 Trowbridge High St 1 29 92.5 33.41 $1,002.19
3 Horseguard Close 0 12 35.0 11.00 $330.00
4 Queens Troop Close 0 6 20.5 4.66 $139.69
5 Broughton St 0 21 66.0 22.03 $660.94
6 Grenville St 1 17 53.0 16.44 $493.13
7 Bird Cage Walk 1 6 21.0 7.13 $213.75
8 Chapel Square St 0 4 18.0 7.66 $229.69
9 Cecil St 0 3 9.0 1.69 $50.63
10 Horseferry Rd 0 22 82.0 42.75 $1,282.50
11 New Market St 1 10 38.5 10.09 $302.81
4 132 443.5 159.34 $4,780.31
Approved Project Budget: $4,780.31
Travel and Expenses: $0.00
Invoice.Tota_I(Amount Due). $4,780.31
Terms: Net 15
Project Name: Sidewalk Trip Hazard Removal 2018
Notes: This invoice is for work completed by Precision Concrete Cutting(PCC)based on the November 20,2017 proposal as accepted by Jim Hobbs.
Work was performed April 26,2018 thru April 30,2018.
Audit completed,onsite walk thru by Dave Reiner(Precision Concrete)on April 30,2018.
PCC removed the trip hazards within specification making a slope according to customer specifications for the specified Areas or Jobs.
All concrete has been cut to a neat and uniform finish.
Each trip hazard has been cut to a"0"point of differential(0 inch vertical height delta)
Each trip hazard has been completely cut all the way to the edges of the walkway(sod and temporary patches removed)
All areas around cuts including walkways,grass,and landscaping left clean.
Itemized invoicing(Invoice Detail)per cut is attached for your audit.
APPROVALS(acceptance of work completed):
Precision Concrete,Inc. Customer
Name: Sarah Temple Name:
Position: Project Coordinator Position:
Signature: Signature:
Date: Date:
Form:INVOICE 180435-2 for City of Carmel-Village of West Clay
form v8 Summary
INVOICE Summary
Ilf�''`` ►� Invoice: 180535-3
!i lE f �Tl Date: 05/03/18
Trip Hazard Removal Specialists Purchase Order:
Supplier Number:
Job Site: Bill to: Remit to:
Village of West Clay City of Carmel Precision Concrete,Inc.
contact:Jim Hobs attn:Jim Hobbs 1896 Goldeneye Drive
Area 3,see locations below 3400 W.131st St Holland,MI 49424
Carmel,IN 46032 Carmel,IN 46074
(616)403-1140-phone
Work Completed: Phone: (317)733-2001 (616)582-5951 -fax
1-May-18 Fax: Federal ID#:80-0183496
Email: jhobbs@carmel.in.gov
Cost Per Inch Foot
$30.00
Job IU(Q W1
No £uC�In�fi3?Jr, .#of Trip Linear
(Area), Location Hazards Cut ,'Feet Inch Feet Cost r..
1 Beaufain Stand Blythe St 4 15.0 5.81 $174.38
4 15.0 5.81 $174.38
Approved Project Budget: $174.38
Travel and Expenses: $0.00
Invoice Total(Amount Due)_ $174.38j_
Terms: Net 15
Project Name: Sidewalk Trip Hazard Removal 2018
Notes: This invoice is for work completed by Precision Concrete Cutting(PCC)based on the November 20,2017 proposal as accepted by Jim Hobbs.
Work was performed on May 1,2018.
Audit completed,onsite walk thru with Dave Reiner(Precision Concrete)on May 1,2018.
PCC removed the trip hazards within specification making a slope according to customer specifications for the specified Areas or Jobs.
All concrete has been cut to a neat and uniform finish.
Each trip hazard has been cut to a"0"point of differential(0 inch vertical height delta)
Each trip hazard has been completely cut all the way to the edges of the walkway(sod and temporary patches removed)
All areas around cuts including walkways,grass,and landscaping left clean.
Itemized invoicing(Invoice Detail)per cut is attached for your audit.
APPROVALS(acceptance of work completed):
Precision Concrete,Inc. Customer
Name: Sarah Temple Name:
Position: Project Coordinator Position:
Signature: Signature:
Date: Date:
Form:INVOICE 180535-3 for City of Carmel-Village of West Clay
form v8 Summary
INVOICE Summary
Invoice: 180535-4
Date: 05/03/18
Trip Hazard Removal Specialists Purchase Order:
Supplier Number:
Job Site: Bill to: Remit to:
Village of West Clay City of Carmel Precision Concrete,Inc.
contact:Jim Hobs attn:Jim Hobbs 1896 Goldeneye Drive
Area 4,see locations below 3400 W.131st St Holland,MI 49424
Carmel,IN 46032 Carmel,IN 46074
(616)403-1140-phone
Work Completed: Phone: (317)733-2001 (616)582-5951 -fax
2-May-18 Fax: Federal ID#:80-0183496
Email: jhobbs@carmel.in.gov
Cost Per Inch Foot
$30.00
Job RR(Remove`
No. ' and Replace)or #of TripLinear
(Area) Location. out of scope Hazards Cut ;Feet Inch.Feet, _ Cost
1 Treaty Line St 0 0 124.0 53.22 $1,596.56
2 Tradd St 0 19 71.5 24.66 $739.69
3 Ed emont Way 0 18 59.5 14.63 $438.75
4 Stanhope St 0 70 224.5 91.97 $2,759.06
5 Apsley Ln 3 22 77.5 21.06 $631.88
6 Rhettsbury St 0 79 276.2 117.23 $3,516.75
7 Meeting House Rd 0 50 159.5 72.19 $2,165.63
8 New Market St 0 12 41.5 10.16 $304.69
9 Branford St 0 9 35.5 17.41 $522.19
3 279 1,069.7 422.51 $12,675.19
Approved Project Budget: $12,675.19
Travel and Expenses: $0.00
Invoice Total(Amount Due)_ $1_2_,675.191
Terms: Net 15
Project Name: Sidewalk Trip Hazard Removal 2018
Notes: This invoice is for work completed by Precision Concrete Cutting(PCC)based on the November 20,2017 proposal as accepted by Jim Hobbs.
Work was performed on May 1,2018 thru May 2,2018.
Audit completed,onsite walk thru with Dave Reiner and Jerry Timar(Precision Concrete)on May 2,2018.
PCC removed the trip hazards within specification making a slope according to customer specifications for the specified Areas or Jobs.
All concrete has been cut to a neat and uniform finish.
Each trip hazard has been cut to a"0"point of differential(0 inch vertical height delta)
Each trip hazard has been completely cut all the way to the edges of the walkway(sod and temporary patches removed)
All areas around cuts including walkways,grass,and landscaping left clean.
Itemized invoicing(Invoice Detail)per cut is attached for your audit.
APPROVALS(acceptance of work completed):
Precision Concrete,Inc. Customer
Name: Sarah Temple Name:
Position: Project Coordinator Position:
Signature: Signature:
Date:1 Date:
Form: INVOICE 180535-4 for City of Carmel-Village of West Clay
form v8 Summary
INVOICE Summary
�;�� � � Invoice: 180535-5
!* � UTI Date: 05/03/18
Trip Hazard Removal Specialists Purchase Order:
Supplier Number:
Job Site: Bill to: Remit to:
Village of West Clay City of Carmel Precision Concrete,Inc.
contact:Jim Hobs attn:Jim Hobbs 1896 Goldeneye Drive
Area 5,see locations below 3400 W. 131st St Holland,MI 49424
Carmel,IN 46032 Carmel,IN 46074
(616)403-1140-phone
Work Completed: Phone: (317)733-2001 (616)582-5951 -fax
2-May-18 Fax: Federal ID M 80-0183496
Email:jhobbs@carmel.in.gov
Cost Per Inch Foot
$30.00
Job RR(Remove '.
No.. { and Replace)or #of Trip Linear
Location out of scope Hazards Cut Feet Inch Feet, Cost
1 Limehouse St 0 12 45.5 15.91 $477.19
2 Blore Heath 2 24 85.0 33.22 $996.56
3 Bonaventure Ave 0 20 71.0 33.25 $997.50
4 Milford St 1 33 119.5 46.44 $1,393.13
5 Bull Ct 1 4 12.0 2.94 $88.13
6 Hourglass Dr 0 9 36.0 13.19 $395.63
FL:
Parsons Gate 0 1 4.0 1.75 $52.50
4 103 373.0 1 146.69 $4,400.63
Approved Project Budget: $4,400.63
Travel and Expenses: $0.00
Invoice Total(Amount Due): $4,400.631
Terms: Net 15
Project Name: Sidewalk Trip Hazard Removal 2018
Notes: This invoice is for work completed by Precision Concrete Cutting(PCC)based on the November 20,2017 proposal as accepted by Jim Hobbs.
Work was performed May 1,2018 thru May 2,2018.
Audit completed,onsite walk thru with Jerry Timar(Precision Concrete)on May 2,2018.
PCC removed the trip hazards within specification making a slope according to customer specifications for the specified Areas or Jobs.
All concrete has been cut to a neat and uniform finish.
Each trip hazard has been cut to a"0"point of differential(0 inch vertical height delta)
Each trip hazard has been completely cut all the way to the edges of the walkway(sod and temporary patches removed)
All areas around cuts including walkways,grass,and landscaping left clean.
Itemized invoicing(Invoice Detail)per cut is attached for your audit.
APPROVALS(acceptance of work completed):
Precision Concrete,Inc. Customer
Name: Sarah Temple Name:
Position: Project Coordinator Position:
Signature: Signature:
Date: Date:
Form:INVOICE 180535-5 for City of Carmel-Village of West Clay
form v8
Summary
INVOICE Summary
Invoice: 180435-7
Date: 04/30/18
Trip Hazard Removal specialists Purchase Order:
Supplier Number:
Job Site: Bill to: Remit to:
Village of West Clay City of Carmel Precision Concrete,Inc.
contact:Jim Hobs attn:Jim Hobbs 1896 Goldeneye Drive
Area 7,see locations below 3400 W. 131st St Holland,MI 49424
Carmel,IN 46032 Carmel,IN 46074
(616)403-1140-phone
Work Completed: Phone: (317)733-2001 (616)582-5951 -fax
20-Apr-18 Fax: Federal ID#:80-0183496
Email: jhobbs@carmel.in.gov
Cost Per Inch Foot
$30.00
Job RR(Remove
No. and Replace)or #.of Trip ,:.Linear.
(Area) Location :' out of scope? Hazards Cut _ Feet Inch.FeetCost-
1 Leighton Ct 1 25 108.0 36.88 $1,106.25
2 Finchley Rd 2 49 169.5 60.22 $1,806.56
3 Montcalm St 0 14 46.5 13.66 $409.69
4 Shaftesbury Rd 0 57 180.5 64.31 $1,929.38
5 Hoover Rd 1 4 16.0 5.75 $172.50
6 113lisland St 0 34 112.0 33.88 $1,016.25
4 183 632.5 1 214.69 $6,440.63
Approved Project Budget: $6,440.63
Travel and Expenses: $0.00
Invoice Total(Amount Due): _
----= --- ---�------ $6;440.63
Terms: Net 15
Project Name: Sidewalk Trip Hazard Removal 2018
Notes: This invoice is for work completed by Precision Concrete Cutting(PCC)based on the November 20,2017 proposal as accepted by Jim Hobbs.
Work was performed April 19,2018 thru April 20,2018.
Audit completed,onsite walk thru by Jerry Timar(Precision Concrete)on April 20,2018.
PCC removed the trip hazards within specification making a slope according to customer specifications for the specified Areas or Jobs.
All concrete has been cut to a neat and uniform finish.
Each trip hazard has been cut to a"0"point of differential(0 inch vertical height delta)
Each trip hazard has been completely cut all the way to the edges of the walkway(sod and temporary patches removed)
All areas around cuts including walkways,grass,and landscaping left clean.
Itemized invoicing(Invoice Detail)per cut is attached for your audit.
APPROVALS(acceptance of work completed):
Precision Concrete,Inc. Customer
Name: Sarah Temple Name:
Position: Project Coordinator Position:
Signature: I Signature:
Date: Date:
Form:INVOICE 180435-7 for City of Carmel-Village of West Clay
farm v8 Summary
INVOICE Summary
IV
�**W a**� Invoice: 180535-6
Date: 05/03/18
Trip Hazard Removal Specialists Purchase Order:
Supplier Number:
Job Site: Bill to: Remit to:
Village of West Clay City of Carmel Precision Concrete,Inc.
contact:Jim Hobs attn:Jim Hobbs 1896 Goldeneye Drive
Area 6,see locations below 3400 W.131st St Holland,MI 49424
Carmel,IN 46032 Carmel,IN 46074
(616)403-1140-phone
Work Completed: Phone: (317)733-2001 (616)582-5951 -fax
1-May-18 Fax: Federal ID#:80-0183496
Email: jhobbs@carmel.in.gov
Cost Per Inch Foot
$30.00
Job " RR(Remove
No ,
Replace)or. Trip
and #of Linear
(Area) Location - out of scope- Hazards Cut `,Feet Inch Feet Cost
1 Mowbray St 0 13 52.5 30.72 $921.56
2 Bellin rath St 0 26 94.5 42.91 $1,287.19
3 Telfair St 0 27 98.0 32.50 . $975.00
4 Meeting House Rd 1 68 233.5 96.22 $2,886.56
5 Burke Dr 0 26 100.0 45.44 $1,363.13
6 Horesham St 0 20 68.0 34.56 $1,036.88
7 Branford St 0 40 151.5 71.72 $2,151.56
8 Hermits a Ln 0 12 44.0 17.44 $523.13
1 232 842.0 371.50 $11,145.00
Approved Project Budget: $11,145.00
Travel and Expenses: $0.00
Invoice Total Amount Due: _ $111,145.00'-,
Terms: Net 15
Project Name: Sidewalk Trip Hazard Removal 2018
Notes: This invoice is for work completed by Precision Concrete Cutting(PCC)based on the November 20,2017 proposal as accepted by Jim Hobbs.
Work was performed April 30,2018 thru May 1,2018.
Audit completed,onsite walk thru with Jerry Timar(Precision Concrete)on May 1,2018.
PCC removed the trip hazards within specification making a slope according to customer specifications for the specified Areas or Jobs.
All concrete has been cut to a neat and uniform finish.
Each trip hazard has been cut to a"0"point of differential(0 inch vertical height delta)
Each trip hazard has been completely cut all the way to'the edges of the walkway(sod and temporary patches removed)
All areas around cuts including walkways,grass,and landscaping left clean.
Itemized invoicing(Invoice Detail)per cut is attached for your audit.
APPROVALS(acceptance of work completed):
Precision Concrete,Inc. Customer
Name: Sarah Temple Name:
Position: Project Coordinator Position:
Signature: Signature:
Date: Date:
Form:INVOICE 180535-6 for City of Carmel-Village of West Clay
form v8 Summary