Loading...
HomeMy WebLinkAboutAshland A-plnS E T B A C K T O F A C E 24" HVAC TRAY HTU26 HTU26 HARDWARE 7 - HTU26 90 - H2.5A P L U M B I N G W A L L RIDGEOFFSET GE01 T01A TG01 GE02 T02A GE 0 3 T0 3 A T0 3 C GE 0 3 A GE04 V01 V02 V03 V04 V05 V06 GE 0 5 GE 0 6 V0 7 V0 8 V0 9 V1 0 V1 1 V1 2 V1 3 V1 4 V1 5 T0 1 ( 2 ) T0 1 B ( 2 ) T0 2( 2 ) T0 2 B ( 6 ) T03(5) T03B(2) T03D(2)T03E(8) 49 - 1 1 - 0 0 19 - 0 4 - 0 8 30 - 0 6 - 0 8 49 - 1 1 - 0 0 11-11-00 7-09-00 20-03-00 39-11-00 39-11-00 37 - 0 8 - 1 2 13 - 0 0 - 0 0 19 - 0 1 - 0 0 6- 0 4 - 0 8 6-02-13 7- 0 9 - 0 0 5- 0 3 - 0 0 1 -1 1 -0 4 2 -0 0 -0 0 8- 0 0 - 0 0 I R C 2 0 0 6 T P I 2 0 0 2 20 T L L - 10 T D L - 10 BD L M /I H O M E S A S H L A N D A 1/ 4 " = 1 ' M a r c h 6 ,2 0 1 7 JG A S H L A N D A CU S T O M E R : LO C A T I O N : MO D E L : J O B #: DA T E : D E S I G N E R : D E S I G N I N F O R M A T I O N : SC A L E : 9 0 2 8 O l d S R 6 7 S o u t h M o o r e s v i l l e ,I N 4 6 1 5 8 (3 1 7 )8 3 4 -5 3 8 0 Truss Placement Guide 1) This layout is intended for the purpose of truss location and placement only. Refer to the building plans for actual building construction. 2) All dimensions shown 00-00-00 are in feet-inches-sixteenths. 3) Trusses are spaced 24" on center unless otherwise noted. 4)Donotcutormodifytrusses. 5) Refer to the individual truss design drawings for the location of member bracing, uplift and truss end reactions. 6) Installation of all temporary and permanent bracing is essential. See truss drawings, BCSI-B2 Summary Sheet and building designer requirements. II I 06/11/18 Mike Sheeks