Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GN011.0 - Remodel Statement of Work - Second Floor
GN011.0 - Remodel Statement of Work - Second Floor 10590 Ditch Rd Carmel, IN 46032 Bedroom 2 ● Refinish wood floor ● Replace fan/light ● Replace shelves in closets ● Replace attic access doors ● Add smoke detector(LS) Bedroom 2 Bathroom ● Remove shower ● Remove whirlpool tub and abandon its plumbing (P) ● Add wall for built-in shower (S) ● Replace toilet ● Replace vanities ● Move plumbing for vanities (P) Bedroom 3 ● Add fan/light (E) ● Refinish wood floor ● Replace closet shelves ● Replace vanity ● Replace light fixture ● Add smoke detector (LS) Bedroom 4 ● Add fan/light (E) ● Refinish wood floor ● Replace closet shelves ● Replace vanity ● Replace light fixture ● Add smoke detector(LS) Jack and Jill Bathroom (between Bedrooms 3 and 4) ● Replace toilet ● Replace shower/tub ● Move plumbing for new shower/tub (P) Hallway ● Refinish wood floor ● Replace balusters and handrails ● Add bookcase to Great Room overlook ● Replace smoke detector(LS) Utility Closet ● Replace HVAC system (M) (E - On Electrical drawing; LS - On Life Safety drawing; P - On Plumbing drawing; S - On Structural drawing; M - On Mechanical drawing) 07/09/18 Mike Sheeks