Loading...
HomeMy WebLinkAboutA001#1 of 14 Date: 04.16.18 Sheet: Revision: www.caseindy.com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f) These drawings have been prepared by Case Design & Remodeling solely for its use and should not be reproduced or relied upon by any other parties. Dimensions shown or scaled are subject to change per actual job condition and must be verified. Materials are to be supplied as specified as equal or standard when not uniquely specified. Installed materials may vary in appearance from drawings. Reference manufacturer's product data for actual appearance and specifications. Ba c k e Re s i d e n c e Ma s t e r Ba t h r o o m & Cl o s e t Re m o d e l Ji m & Be t s y Ba c k e 10 4 8 0 Br e c k e n r i d g e Dr i v e Ca r m e l , In d i a n a 46 0 3 3 Approved By: Date: 1 FINAL #5 #2 #3 #4 06.01.18 04.24.18 05.02.18 05.24.18 BACKE PROJECT SCOPE OF WORK: MASTER BATH REMODEL, RELOCATING MASTER CLOSET DRAWING SHEET INDEX CARMEL, IN CRITICAL / SPECIAL INFO - SALVAGE: TOILET, FAN LIGHT COMBO IN TOILET ROOM, EXISTING MIRROR, EXISTING CEILING FAN IN GUEST BEDROOM, (1) EXISTING FAUCET - H.O. PROVIDED: EMBEDDED VANITY MIRROR/LIGHT FIXTURE, GLASS SHOWER ENCLOSURE, HVAC WORK CLOSET SYSTEM IN NEW MASTER CLOSET PAGE 1 : COVER SHEET PAGE 2 : EXISTING PLAN PAGE 3 : PROPOSED PLAN PAGE 4 : PROPOSED ELECTRICAL PAGE 5 : EXISTING & PROPOSED CLOSET PLAN PAGE 6 : PROPOSED ELECTRICAL CLOSET PLAN PAGE 7 : PROPOSED ELEVATIONS PAGE 8 : PROPOSED ELEVATIONS PAGE 9 : PROPOSED ELEVATIONS & CABINET SCHEDULE PAGE 10 : WALL SECTION PAGE 11 : PERSPECTIVES PAGE 12 : SELECTIONS Sydney Spurgeon Lead Designer sspurgeon@caseindy.com Katie Kramer Designer kkramer@caseindy.com #6 06.14.18 07/06/18 William Hohlt