HomeMy WebLinkAboutA000.1\A1;SEE STR. SECT.
N.T.S.
\A1;1"\A1;10"
\A1;10"
\A1;11 1/4"\A1;1 1/2"FRAMED FLOOR SYSTEM-\PREFER TO PLANS
PREMANUFACTURED STAIR SYSTEM-REFER TO BUILDING SECTION
SECURE SIMPSON STRAP TIE "LSTA-36" TO FLOOR FRAMING SYSTEM FIRST, THEN PLACE AND SECURE STAIR SECTION INTO POSITION. COMPLETE BY ATTACHING STRAP TO STAIR SYSTEM ALONG UNDERSIDE AS SHOWN
STAIR TREAD / ATTACHMENT DETL.
BACKFILL MATERIAL PER IRC
BITUMINOUS WATERPROOFING PER SPEC.
4" PERFORATED DRAIN TILE W/ SOCK IN MIN. 2" STONE BED W/ MIN. 6" STONE COVER SCHEDULE 30 DRAIN TILE AND BLEEDERS PER PLAN \A1;8"
TYPICAL WALL SECTION - SIDING
\A1;8"\A1;4"\A1;4"\A1;1'-4"
SCALE 1/2" = 1'-0"
8" x 16" CONT. POURED CONCRETE FOOTING - PER SPEC.
4" CONC. SLAB OVER 6 MIL VAPOR RETARDER 6" MIN LAP OVER 4" GRANULAR FILL
\A1;8"\PMIN.
2x4 TREATED SILL PLATE W/ ANCHOR BOLTS PER SPEC. 6' O.C., MIN. 12" FROM END
GRADE FLOOR SYSTEM PER SPEC.
R13 BATT INSULATION AT BAND
2x4 BOTTOM PLATE3/4" T&G SUBFLOOR OVER FLOOR SYSTEM, ATTACHMENT PER SPEC.
SHEATHING PER SPEC. OVER 2X4 STUDS AT 16" O.C. W/ R13 BATT INSULATION HOLD PLATE BACK FOR SHEATHING
SIDING PER SPEC.
7'-1" WINDOW HEIGHT AT 8'-1 1/8" PLATE HEIGHT\P8'-1" WINDOW HEIGHT AT 9'-1 1/8" CEILING HEIGHT1/2" GYP. BD
8" CONCRETE WALL PER PER SPEC.
R13 BATT INSULATION AT BOND
\A1;3 3/4"
12x\A1;1'-1 1/4" O.H.R-38 INSULATION W/ BAFFLEST.O. PLATE WOOD HEADER - SEE FLOOR PLANS
DBL. 2x4 TOP PLATE
5/8" GYP. BD
\A1;ICE & WATER SHIELD TO 24"\P INSIDE OF EXTERIOR WALL LINECOMPOSITION ROOF SHINGLES PER SPEC OVER 15# BLDG. FELT w/ STARTER STRIP AND METAL DRIP OVER ROOF DECK PER SPEC ON PRE-ENGINEERED ROOF TRUSSES PER PLAN
EXTERIOR SIDE OF STUD WALL
CORNICE PER ELEVATIONS
MANUFACTURED ENGINEERED FLOOR JOISTS - SEE SHOP DAWINGS FOR ADDITIONAL INFORMATION
3/4" T&G SUBFLOOR OVER FLOOR JOIST., ATTACHMENT PER SPEC.
TOP OF PLATEFIRST FLOOR
FIRST FLOOR PL.SECOND FLOOR
BOTTOM OF HEADER
GARAGE PL.
SECOND FLOOR PL.
BOTTOM OF HEADER
SCALE 1/4" = 1'-0"SECTION THRU GARAGE
\A1;9'-1{\H0.750000x;\S1#2;}"
\A1;1'-0{\H0.750000x;\S5#8;}"
\A1;9'-1{\H0.750000x;\S1#8;}"
\A1;1'-0{\H0.750000x;\S5#8;}"
\A1;9'-1{\H0.750000x;\S1#8;}"
\A1;8'-1{\H0.750000x;\S1#8;}" (W'DOW HEAD HT, TYP.)
\A1;8'-1{\H0.750000x;\S1#8;}" (W'DOW HEAD HT, TYP.)
45632
GARAGE O. ENTRY KITCHEN
UNFINISHED BASEMENT
GAME ROOMBATH
PRE-ENGINEERED ROOF TRUSSES \P@ 24" O.C. MAX. SEE TRUSS DRAWINGS DESIGNED & PREPARED \PBY OTHERS
TOP OF FOOTING 1
78910111213141516
TOP OF PLATEFIRST FLOOR
FIRST FLOOR PL.SECOND FLOOR
BOTTOM OF HEADER
GARAGE PL.
SECOND FLOOR PL.
BOTTOM OF HEADER
SCALE 1/4" = 1'-0"SECTION THRU STAIRS
TOP OF FOOTING
\A1;9'-1{\H0.750000x;\S1#2;}"\A1;14 R AT 7.58 = 8'-10{\H0.7x;\S1/8;}"
\A1;16 R AT 7.609 = 10'-1{\H0.7x;\S3/4;}"
PRE-ENGINEERED ROOF TRUSSES \P@ 24" O.C. MAX. SEE TRUSS DRAWINGS DESIGNED & PREPARED \PBY OTHERS
FLOOR SYSTEM \PPER MANUF.
FLOOR SYSTEM \PPER MANUF.
R-38 BLOWN \PINSULATION
\A1;1'-0{\H0.750000x;\S5#8;}"
\A1;9'-1{\H0.750000x;\S1#8;}"
\A1;1'-0{\H0.750000x;\S5#8;}"
\A1;9'-1{\H0.750000x;\S1#8;}"
\A1;8'-1{\H0.750000x;\S1#8;}" (W'DOW HEAD HT, TYP.)
\A1;8'-1{\H0.750000x;\S1#8;}" (W'DOW HEAD HT, TYP.)
11121314
654321
7
\A1;10'-0"
12345678910111213141516
UNFINISHED BASEMENT
KITCHENFOYERBATHO.BATH
WICLOFTBATH128
89
1516
10
3124567
11121314
1098
1516
\A1;16 R AT 7.609 = 10'-1{\H0.7x;\S3/4;}"
PLAN NAME
SHEET
COMMUNITY NAME
PRODUCTION MANAGER
LAWSON COMMUNITY ID
RELEASE DATE:DATE / DESCRIPTION
NPC PLAN NUMBERLAWSON PLAN IDLEGACY PLAN NUMBER / NAME
SPECIFICATION LEVEL
GARAGE HANDING
REV #
PROJECT TYPE
CURRENT
NOTE: SCALES NOTED ON DRAWINGS RELATE TO FULL SIZE PLOTS ON 22x34 SHEETS - 11x17 SHEETS REPRESENT 1/2 SCALE PLOTS
ARCHITECT OF RECORD:ENGINEER OF RECORD:
05/11/2018Joel Hampshire
(c) Copyright PulteGroup, Inc. - 2012
I n d i a n a D i v i s i o n
1 1 5 9 0 N . M
e r i d i a n S t , S u i t e 5 3 0
C
a
r m
e l , I n
d
i a
n
a
4
6
0
3
2
SINGLE FAMILY
WestClay
----
GARAGE RIGHT
Red
Plan 2
1816.0000
LOT 319
4634
SCHWARZ ENGINEERINGGODUCO DESIGN - ARCHITECTS
PLOTTED: May 11, 2018 / Anupam.jain / PLAN-4634-IN-WCLY-FRMP.DWG
B u i l d i n g S e c t i o n s a n d D e t a i l s
F u l l B a s e m e n t - N o B r i c k L e d g e
3.30a
07/11/18
William Hohlt