HomeMy WebLinkAbout5r
ROCK DAM REQUIRED
IN DITCH ( TYPICAL) I ; °� I1 ,
LJ P��r
0�
X (WOODS)
I
e
6EN C H MARK
U565 - Y 42 (NAVD 88 )
A STANDARD D15K, 5TAMPED Y 42 1954
2.0 MILES SOUTH ALONG THE CHICAGO, IN61ANAPOL15 AND LOUISVILLE
RAILWAY FROM THE 5TATION AT CARMEL, HAMILTON COUNTY, 11 '/2 RAILS
NORTH OF MILEP05T 5 170, 10 RAIL5 NORTH OF THE CRO55ING OF THE
INDIANA RAILROAD, 7 RAIL5 SOUTH OF THE CRO55ING OF 111th STREET,
2 YARDS EAST OF THE EAST RAIL, IN THE TOP OF THE NORTHEAST CORNER
OF A CONCRETE SWITCH SASE, AND ABOUT 8 INCHES LOWER THAN THE TRACK.
ELEV. = 858.62
'Qb+
DWG FILE: C:\98\327\PLAN\98327GP1 SPELLCHK:
PLOT SCALE: 1:30.000 EDIT DATE: 04/24/98
L PLOT ORIGIN: 4302.83.5635.74 EDITED BY: JCS - S121
40 5Q. YD 5. OF
G" MIN. DIM. RIPRAP
REQUIRED
ROCK DAM REQUIRED
IN DITCH ( TYPICAL )
�Ma1(���
mqllw�
CAUTION !!
THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES
SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND
EVIDENCE ( including, but not limited to, monholes, inlets,
valves, and morks made upon the ground by others ) AND
ARE SPECULATIVE IN NATURE. THERE MAY ALSO BE OTHER
EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO
ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND
EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS OF SAID
EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY
THE CONTRACTOR PRIOR TO ANY AND ALL CONSTRUCTION.
1-800-382-5544
CALL TOLL FREE
- INDIANA UNDERGROUND -
GENERAL GRADING NOTES:
1. ALL WORK TO CONFORM TO STATE AND LOCAL REGULATION5.
2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO
5TARTING CONSTRUCTION. THE CONTRACTOR SHALL DE RE5PON5IbLE FOR
ALL FIELD DIMEN51ON5. IF ANY D15CREPANCIE5 ARE FOUND IN THESE PLANS
FROM THE ACTUAL FIELD CONDITION5, THE CONTRACTOR 5HALL NOTIFY
THE ENGINEER IMMEDIATELY.
5. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN
EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT.
VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTOR'S AND/OR UTILITY
COMPANIES 50 A5 NOT TO CAUSE DAMAGE.
4. THE CONTRACTOR 5HALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE
CON5TRUCTION 15 TO START, TO VERIFY IF ANY UTILITIES ARE PRESENT ON
5ITE. ALL VERIFICATION5 (locotion, size and depth ) 5HALL bE MADE BY THE
APPROPRIATE UTILITY COMPANIES. WHEN EXCAVATING 15 AROUND OR OVER
EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY
50 A REPRESENTATIVE OF THAT UTILITY COMPANY CAN BE PRESENT TO
INSTRUCT AND Ob5ERVE DURING CONSTRUCTION.
5. TRENCHES FOR ALL STORM DRAIN LINES 5HALL bE BACKFILLED COMPLETELY
WITH ENGINEERED GRANULAR MATERIAL IF WITHIN 10 FEET OF PAVEMENT.
G. AFTER 5TRIPPING TOP501L MATERIAL, PROOFROLL WITH A MEDIUM WEIGHT
ROLLER TO DETERMINE LOCATIONS OF ANY POCKETS OF UN5UITAbLE
MATERIAL. THE NECE55ITY FOR 5UbDRAIN5 AND/OR REMOVAL OF ANY
UN5UITA5LE MATERIAL WITHIN THE PROP05ED PARKING AREAS WILL bE
DETERMINED AT THE TIME OF CONSTRUCTION.
7. PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS. AFTER
IN5TALLATION, CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY,
"BIRD BATH" CONDITION5.
8. ALL PROP05ED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL
GRADE ELEVATION5.
9. 5EE APPROPRIATE DETAILS TO DETERMINE 5UbGRADE ELEVATIONS BELOW
FIN15H GRADE ELEVATIONS INDICATED.
10. FLOW LINE ELEVATION5 GIVEN AT END OF CONCRETE END 5ECTION5.
0' 30' 60'
SCALE: 1"=30'
LEGEND
TOR
TOP OF RIM
INV
STORM SEWER - STRUCTURE DATA TABLE
BOC
STR.
NO.
STRUCTURE
TYPE
CASTING
TYPE
FOW
FACE OF WALK
BOW
ELEVATIONS
FLOWLINE
GRADE
(z)
CONNECT
TO
STRUCT.
REMARKS
[i4 TYPE T.O.C. UPSTM DNSTM
I L__
1
36' PIPE CATCH BASIN
R-2560
185
30'
RCP
834.00
829.62
827.77
1.0
2
-
2
TYPE 'C" INLET
3287-15
22
30'
RCP
832.94
827.77
827.55
1.0
3
-
3
TYPE 'C' INLET
3287-15
167
30'
RCP
833.03
827.55
825.88
1.0
4
-
4
TYPE"C'INLET
3287-15
82
30'
RCP
829.18
825.88
822.8
1 3.5
OUT
CONCRETE END SECTION REOUIRED
DWG FILE: C:\98\327\PLAN\98327GP1 SPELLCHK:
PLOT SCALE: 1:30.000 EDIT DATE: 04/24/98
L PLOT ORIGIN: 4302.83.5635.74 EDITED BY: JCS - S121
40 5Q. YD 5. OF
G" MIN. DIM. RIPRAP
REQUIRED
ROCK DAM REQUIRED
IN DITCH ( TYPICAL )
�Ma1(���
mqllw�
CAUTION !!
THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES
SHOWN ON THIS PLAN ARE BASED UPON ABOVE GROUND
EVIDENCE ( including, but not limited to, monholes, inlets,
valves, and morks made upon the ground by others ) AND
ARE SPECULATIVE IN NATURE. THERE MAY ALSO BE OTHER
EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO
ABOVE GROUND EVIDENCE OR FOR WHICH NO ABOVE GROUND
EVIDENCE WAS OBSERVED. THE EXACT LOCATIONS OF SAID
EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY
THE CONTRACTOR PRIOR TO ANY AND ALL CONSTRUCTION.
1-800-382-5544
CALL TOLL FREE
- INDIANA UNDERGROUND -
GENERAL GRADING NOTES:
1. ALL WORK TO CONFORM TO STATE AND LOCAL REGULATION5.
2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO
5TARTING CONSTRUCTION. THE CONTRACTOR SHALL DE RE5PON5IbLE FOR
ALL FIELD DIMEN51ON5. IF ANY D15CREPANCIE5 ARE FOUND IN THESE PLANS
FROM THE ACTUAL FIELD CONDITION5, THE CONTRACTOR 5HALL NOTIFY
THE ENGINEER IMMEDIATELY.
5. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN
EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT.
VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTOR'S AND/OR UTILITY
COMPANIES 50 A5 NOT TO CAUSE DAMAGE.
4. THE CONTRACTOR 5HALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE
CON5TRUCTION 15 TO START, TO VERIFY IF ANY UTILITIES ARE PRESENT ON
5ITE. ALL VERIFICATION5 (locotion, size and depth ) 5HALL bE MADE BY THE
APPROPRIATE UTILITY COMPANIES. WHEN EXCAVATING 15 AROUND OR OVER
EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY
50 A REPRESENTATIVE OF THAT UTILITY COMPANY CAN BE PRESENT TO
INSTRUCT AND Ob5ERVE DURING CONSTRUCTION.
5. TRENCHES FOR ALL STORM DRAIN LINES 5HALL bE BACKFILLED COMPLETELY
WITH ENGINEERED GRANULAR MATERIAL IF WITHIN 10 FEET OF PAVEMENT.
G. AFTER 5TRIPPING TOP501L MATERIAL, PROOFROLL WITH A MEDIUM WEIGHT
ROLLER TO DETERMINE LOCATIONS OF ANY POCKETS OF UN5UITAbLE
MATERIAL. THE NECE55ITY FOR 5UbDRAIN5 AND/OR REMOVAL OF ANY
UN5UITA5LE MATERIAL WITHIN THE PROP05ED PARKING AREAS WILL bE
DETERMINED AT THE TIME OF CONSTRUCTION.
7. PROVIDE POSITIVE DRAINAGE WITHOUT PONDING, IN ALL AREAS. AFTER
IN5TALLATION, CONTRACTOR TO TEST FOR, AND CORRECT, IF ANY,
"BIRD BATH" CONDITION5.
8. ALL PROP05ED SPOT ELEVATIONS ARE THE FINAL PAVEMENT AND FINAL
GRADE ELEVATION5.
9. 5EE APPROPRIATE DETAILS TO DETERMINE 5UbGRADE ELEVATIONS BELOW
FIN15H GRADE ELEVATIONS INDICATED.
10. FLOW LINE ELEVATION5 GIVEN AT END OF CONCRETE END 5ECTION5.
0' 30' 60'
SCALE: 1"=30'
LEGEND
TOR
TOP OF RIM
INV
PIPE INVERT
BOC
BACK OF CURB
GUT
GUTTER
FOW
FACE OF WALK
BOW
BACK OF WALK
FLO
FLOWLINE
TOB
TOP OF BANK
SWL
SWALE
EOW
EDGE OF WATER
EDP
EDGE OF PAVEMENT
DS
DRAIN SPOUT
PVC
PLASTIC PIPE
POST •
EXISTING POST
PWP i
EXISTING POWER POLE
- -oel - -
EXISTING OVERHEAD ELECTRIC
- -x- -
EXISTING FARM FENCE
EXISTING SANITARY PIPE
�S`
EXISTING SANITARY MANHOLE
(o)
EXISTING CLEANOUT
0
EXISTING DRAIN SPOUT
•
GP
EXISTING GUARD POST
*LP
EXISTING LIGHT POLE
EXISTING TREE
���
0
EXISTING SPOT ELEVATION
X
--------- 000
EXISTING CONTOUR
000.00 X
PROP05ED SPOT ELEVATION
000
PROP05ED CONTOUR
®ER05ION
CONTROL 5LANKET
-X- -X-
51LT FENCE
ER05ION CONTROL NOTES
1. LAND ALTERATION WHICH 5TRIP5 THE LAND OF
VEGETATION, INCLUDING REGRADING, SHALL 5E DONE IN
A WAY THAT WILL MINIMIZE ER0510N.
2. CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL
ORDINANCES THAT APPLY.
5. TH15 PLAN SHALL NOT BE CON51DERED ALL INCLU51VE
A5 THE CONTRACTOR SHALL TAKE ALL NECE55ARY
PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING
THE 5ITE.
4. ADDITIONAL ER05ION AND SEDIMENT CONTROL MEA5URE5
WILL BE INSTALLED IF DEEMED NECESSARY by ON 5ITE
IN 5PECTION.
5. SEDIMENT LADEN WATER SHALL DE DETAINED DY
ER05ION CONTROL PRACTICES A5 NEEDED TO MINIMIZE
SEDIMENTATION IN THE RECEIVING STREAM. NO STORM
WATER SHALL 5E DISCHARGED FROM THE 5ITE IN A MANNER
THAT CAU5E5 EROSION AT THE POINT OF D15CHARGE.
6. WA5TE5 AND UNUSED BUILDING MATERIALS SHALL
NOT bE ALLOWED TO BE CARRIED FROM THE 5ITE 5Y
STORM WATER RUNOFF. PROPER DISPOSAL OF ALL WA5TE5
AND UNUSED BUILDING MATERIALS 15 REQUIRED.
7. 5EDIMENT 5EING TRACKED ONTO PUBLIC OR PRIVATE
ROADWAYS 5HALL 5E MINIMIZED. CLEARING OF ACCUM-
ULATED 5EDIMENT 5HALL NOT INCLUDE FLUSHING WITH
WATER, CLEARED 5EDIMENT 5HALL BE RETURNED TO THE
5ITE FOR D15PO5AL.
8. 501L WHICH HA5 ACCUMULATED NEXT TO ER0510N CONTROL
DEVICES 5HALL 5E COLLECTED AND RE-D15TRI15UTED ON
5ITE AFTER EACH RAINFALL EVENT, AND AT LEAST ONCE A WEEK.
9. IF IN5TALLATION OF STORM DRAINAGE 5Y5TEM 5HOULD DE
INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE ENDS 5HALL
bE COVERED WITH FILTER FABRIC.
10. ALL EX15TING 5TRUCTURE5, FENCING, TREES AND ETC., WITHIN
CONSTRUCTION AREA 5HALL BE REMOVED AND D15P05ED OF OFF
5ITE. BURNING 15 NOT ALLOWED ON 5ITE.
11. SCHEDULE OF EARTHWORK ACTIVITIES:
a) THE DURATION OF TIME WHICH AN AREA REMAINS
EXP05ED 5HALL SE KEPT TO A PRACTICAL MINIMUM. THE
AREA 5HALL DE 5TADILIZED A5 50ON A5 P055IbLE.
TEMPORARY VEGETATION OR MULCHING 5HALL BE U5ED
TO PROTECT EXP05ED AREAS IF PERMANENT VEGETATION
CANNOT BE SEEDED WITHIN 14 DAYS OR ACTIVITY
CEA5E5 FOR MORE THAN 21 DAYS OR A5 DIRECTED 5Y
THE ENGINEER.
b) TOP501L REPLACEMENT 5HALL TAKE PLACE FROM
MARCH 1 TO OCTOBER 51. 5TOCKPILE TOP501L AT ALL
OTHER TIMES OF THE YEAR. PERMANENT AND FINAL
VEGETATION AND STRUCTURAL ER0510N CONTROL DEVICES
5HALL bE IN5TALLED WITHIN SEVEN (7) DAYS AFTER FINAL
GRADING OR A5 50ON A5 P05515LE.
W
W
N
Z (a
Oz
r
W
W
0
0
0
R� R'
��� �`�P•���STfRf�•� ���
* 880303
ME OF
I/0�
CERTIFIED BY
U)
O
M
W
0
Z
Q
0
Z
Z a
O a
Z Z
a
aW
W
UA
N
Z�
V=
r
N
W
0
Z Q
O�
j
Q W
J 2
W a
DATE:
04/24/98
SCALE:
1" = 50'
DRAWN BY:
b.E.5.
CHK'D BY:
IR.R.H.
JOB NO.
98-527
REVISIONS
SHEET NO,
C&O
OF