Loading...
HomeMy WebLinkAboutWaterstone Homeowners Association/Eng/25,000/Agreement for Payment of Project CostAGREEMENT FOR PAYMENT OF PROJECT COST This Agreement entered into by and among the Waterstone Homeowners Association, Inc. (the "Association"), and the City of Carmel, Indiana, acting by and through its Board of Public Works and Safety, (the "City") WITNESSETH: WHEREAS,, the Association is the owner of, and has maintenance responsibility for, Waterstone Lake (the "Lake"), which is located between the Bay Hill and Windpointe Subdivisions (the "Subdivisions"). Both Subdivisions are located in Carmel, Hamilton County, Indiana; WHEREAS, the Lake's outfall structure has failed, thereby preventing the Lake from maintaining the normal pool water level; WHEREAS, the Association has entered into contracts with Excavating Unlimited and Associa OnCall, (the "Contractors") to design and construct the necessary repairs to the outfall structure and other associated drainage pipes (the "Project") WHEREAS, the Contractors have completed the Project at a cost of Seventy One Thousand Nine Hundred Forty Six Dollars and Eighty Four Cents ($71,946.84); WHEREAS, the City is willing to reimburse the Association up to Twenty Five Thousand Dollars ($25,000) in order to help offset the cost of the Project. IT IS THEREBY AGREED by and between the parties as follows: 1. The City and the Association agree that the design, scope, implementation, construction, and contract administration of the Project is the sole responsibility of the Association, and that the City bears no responsibility as to the design, construction, or completion of the Project. C:\Users\jkulirnan\D"kiopthVaterstone\lVaterstone HOA Project Cosi Agreement Draft legal —isions.docx All costs of the Project shall be. paid by the Association. Upon completion of the Project, the Association may file verified claims with the City for reimbursement up to $25,000. 3. The Association, acknowledges and represent as follows: a. The Association, and/or its representatives have been solely responsible for the design and implementation of the Project. b. The City does not make any representation or warranty that the Project, as designed, will provide substantial positive benefits to the Lake or land within the Subdivision. c. The sole purpose of this Agreement is for the City to assist in paying part of the cost for the Project as selected, designed, constructed, and managed by the Association. d. By providing assistance to the Association in paying part of the cost of the Project, the City shall not be deemed to have accepted any future jurisdiction or maintenance duties for the Lake, nor shall the City's participation in the funding of this Project be deemed as an admission or assumption of liability for any future Lake -related projects within the Subdivision unless the City has any such duties prior to the date of execution of this Agreement. e. The Association represents and warrants that it has the authority to contract with the Contractors to perform the work for the Project, including lawftil means for ingress and egress to the Project, the use of land that is necessary to complete the Project, and to dispose of the spoils from the Project. 4. The Association agrees to indemnify and hold harmless the City for any and all liability which might result from the construction of the Project, and any and all claims that may C 1Usetigkashman\�esAzop�\Vatersmne\R'ar. stone HOA Peeled Cost Agtec—t Drat Icyal revisions doe:, be brought against the Association or the City arising out of the design, implementation and conclusion of the Project, it being the understanding of the parties that the Association shall be solely responsible for any and all indirect or direct liability to any person or entity resulting from the construction of the Project. S. The City shall have a reasonable right of access to the Project site, and shall be informed of the progress of the Project on a regular basis. Representatives of the City may inspect the Project, but have no duty to change, alter, redesign or take any acts concerning the construction of the Project, other than to assure that the reimbursement payments described above are due and owing for a portion of the work which has been completed. 6. The City shall not have any duty with respect to the Project other than issuing reimbursements to the Association as set out above. 7. This Agreement constitutes the entire agreement between the Association and the City with respect to the subject matter hereof, and supersedes all prior oral or written representations and agreements regarding same. This Agreement may only be modified by written amendment executed by both parties hereto, or their successors in interest. 2018. ALL OF WHICH IS AGREED by and between the parties on the dates set out herein. APPROVED by the Waterstone I Iomeowners Association this Z day of M.?' , WATERSTONE HOMEOWNERS ASSOCIIATION,,, INC. By Printed: 1v--r_a14a1 Title: President, Waterstone Homeowners Association CiUscrs\jkyLrnanlDukiop\1l'aierswne\1Vat<rs�on< HOA Noj_t Cost Ag--( D,.A le;al mdsioos doca ATTEST: \ B Printed: Title: WaterstoneHOA Board Member Approved and Adopted this I day of `� I 20M. CITY OF CARMEL, INDIANA By and through its Board of Public Works and Safety BY: /nesrainard, Presidi Office Date: 1,7 Lori S. Wats embe Date: 7 'b G ATTEST% Christine S. P;E�ilk-Treasurer Date: ��//// C:1Uscrs`jk=hm='DesktopUVaterstone\lVaterstore HOA Project Cosi Agreement Draft legal re6sions docs