HomeMy WebLinkAboutRieth-Riley Construction Co, Inc/Eng/CO #6/-297,648.39/Range Line Road and 4th Street RAB – Project #16-ENG-31City of Carmel Project 16 -ENG -31 Range Line Road and 41" St. RAB CHANGE ORDER #6 Change order represents added items for additional work at the roundabout and to adjust quantities to finalize PO 100473 which represent the Range Line and 4`h Street SW RAB and 41h Street SW, west of the Monon Trail. Contract Price prior to this Change Order $7,705,495.11 Contract Price will be increased by this Change Order --------------------------------------------`-------------------------------- New Contract Price including this Change Order - - - --------------------------------- {$297,648.39} $7.407,846.72 Adjusted PO # PO -10472 PO -100473 PO -100473 Contract Price 4th SW West Project Veterans Way RL & 4th RAB of Monon Original $2,797,315.57 $654,132.69 $501,298.89 $5,378,409.93 Contract Change Order 1 $1,605,251.69 $6,983,661.62 Change Order 2 $51,521.68 $7,035,183.30 Change Order 3 $52,244.51 $7,087,427.81 Change Order 4 $556,312.82 $7,643,740.63 Change Order 5 $61,754.48 $7,705,495.11 Change Order 6 ($297,648.,L;- $7,407,846.72 Adjusted Amount $5,010,401.76 1 $470,483.29 $501,298.89 $7,407,846.72 TO: Rieth Rilev Construction Co. Inc 1731 West Minnesota Street Indianapolis. IN 46221 CITY OF CARINEL CONTRACT CHANGE ORDER NO. 719/2018 PROJECTNAME: l6 -ENI G-31 CITY REQ. NO.: CITY PO NO.: 100473 CITY PO DATE: 61U2017 1. You are directed to make the follotcing chang-es in this Contract: 6 =ells fi€r additional u:u r rwirdahout and adjust quantities to f nalizc PO 100473. SCHEDULED ADJUST;4IE.NT Cj_C j AMOUNT t+1ORt-)DAYS See detail ofitems and summary of changed costs in attached Table 1'0'1'AL OF CIIANGE ORI3ER I-FENlIS -$297.648.39 tF Del It. The followine referenced Documents further describe the changes outlined its Paragraph 1. and are to be considered a part of this Changs: Order: R.F.Y.:f_�_W.D.C. NO.: nia Other: _ R\ Reouest from the City of Carmel per yrolwsais included herein The changes result in the following, adjustment ot-Contract Price and Contract Time: Contract Price prior to this Change Order 57.705.495.11 Contract Price will he increased by this Change Order 6297,043,11)t New Contract Price including this Change Order 57.407.846.72 Contract Time prior to this Change Order 150 Days October 12017 Completion Date Net increased resulting from this Change Order 0 Days Current Contract Time including this Change Order October 1 20t7 Completion Date This Change Order is for full and final settlement of all direct. indirect. impact costs and time extensions incurred at any time resulting from the performance of' the changed work. The Above Chanees Are Recommended The Above Changes Are Accepted App t o,, ed AOSSROAD ENGINEERS ENGINEER 3.417 Shermmn Drive Address Beech Grove, IN 46107 Citytstatefzip By: Phone: 317-780-1355 Date/ / / t Rieth-Riley Congntetion Co. Ine, Jan:�s Brainard. ?Mayor CONTRACTOR 1751 West Minnesota Street )Crean% Kaslutan_ Cita En ' er Address Indianapolis. IN 46221 Christine S. Date: 16 -ENG -31 4th and Ranee Linc RAS CHAN"GE ORDER #6 TABLE (tm Na Description tacit j Loit Price I OrionN Quantity OriY sl Annun/ Foal QuantitV s Final Amount ONer Under I t - --ion Engineering LS S 61.410,00 1 0.5 S 30.705.00 8.4-' 5 24 ,3=.0.= ; S (..141,D01 3 -- --(d Office MO S 1,462.85 1 9 $ 13165.65 8.18 S 11 9r -.I I S 1 199.54 4 Office Ecuiomant MO S 1 375.33 9 $ 12,377,97 2.26 S 3 10.37 11 9. 6.80 5 Maintenance of TrafC. LS , S 31 047.00 1 S 31,047.00 0.90 S 27,942.30 5 3.104.70) 10 Storm Water Qua' .ManacerneM Bud e! DOL 1 S 1.00 15636 S 15.836.00 2,480,00 S 2.480.00 $ 13156.001 I'll Su rade Trea mens, Iv' SYD S 24,48 1482 I S 38.279.38 2.841,96 5 69.571,18 S 33.291.82 121 Sub rade Treatment, I -E SYD S 11.50 5254 S 60421.00 1,918.05 S 22.057.58 $(38,363,43111 lal Su rade Treatment Type It SYD 18.01 503 S 9,059.03 860.70 S 11.899.21 S 2.840.15 14 Structural Backfill, Type 1 LFT $ 18.81 976 $ 16.406.66 769.00 S 12.926.89 $ 3.479.67) 15 Compacted Aggregate No. 53 Stone TON S 23.34 1605 $ 37,460.70 1.39146 $ 32.481.34 $ 4,979,36 16 Siubgrade Treatment(Undistributed) CYD S 65.79 500 S 32,895,00 61.12 $ 4.021.08 $ 28 873.92 17 Geogrid SYD S 3.57 255 $ 910.35 326.00 S 1.163.82 S 253.47 18 As halt Millin 1.5' SYD S 6.81 1278 S 8,447.58 68."22 IS 450.93 $ .996.65 19 HMA Surface, T e'C'. 9.5 mm TON S 95.13 262 $ 24.924.06 199.21 S 18 96917 S 5.954.19 20 HMA Intermediate. Type 'C' 19.0 mm TON S 70,83 436 $ 30.794.88 129 79 IS 9.167.07 $ 21.627.81 211 HMA Intarmediate: T 'C', O.G. 19.0 mm TON S 66.31 484 S 32.094.04 405.89 S 2_6.914.57 $ 5,179,47 221 HMA Base. T C'. 25.0 mm TON $ 67.11 1153 S 77:377.83 728.65 IS 48.899.70 S 28.478.13 23 HMA Surface. T 'B`: 9.5 mm TON $ 93.21 350 S 32,623.50 245.66 1 S 22.89'.9' S 9,725.53 24 HMA Intermediate, T 'B' 19.0 mm TON S 83.05 334 S 27 736.70 530,86 1 $ 44.089.58 S 16.350,86 25 HMA Base, Type B'. 25.0 mm TON S 76.14 358 S 2".258,12 430.73 I S 32.795.78 S 5.537.88 26 A halt for Tack Coat TON S 0,01 5 $ 0,05 0.00 $ $ 0.05 27 PCCP, 7" SYO 3104.45 157 S 16,398.65 156.30 $ 16.325.54 1 S 3.11 28 Sdewalk, Concrete SYD S 41.76 1708 $ 71 328.08 812.65 S 33 938.26 S 37 389.82 29 Ramp. Concrete Includes Detectable Warning Eten SYD $ 177,19 106 $ 18,782.14 126.71 S 22.451,74 $ 3.689.80 30 1 Concrete Curb, Barrier LFT S 14,31 1604 S 22.274.24 1,276.18 S 18.929.85 S 3,344.39 31 Mcd-fied Roll Curb LFT S 32.48 205 $ 6,658.40 223.00 $ 7.243.04 S 584.64 321 Center Curb. Type D SYD S 185.10 15 $ 2,475.50 11.00 1,816.10 860,40 331 Curb and Gutter. Concrete. Type Il LFT $ 21.84 2093 S 45,711.12 2,25245 $ 49,19151 S 3,482.39 34 6" Variable Barrier Curb LFT $ 60.61 59 $ 3.575.99 54.00 $ 3.272.94 $ 303.05 35 Conuete Band LFT S 11514 26 $ 3.009.24 0.00 IS S 3,W9.24 36 PCCP for A reaches Residential 6' SYD S 74.06 197 $ 14.589.82 220.26 1 $ '6,312.45 S 1.722.64 37 PCCP for Approaches. Cemmerz:ai 9" SYD S 69.91 306 $ 21.392.46 303.43 S 21.212.79 $ 179.87 39 Topsoil tAssume6'Thick) CYD $ 52.59 491 S 25,821.69 285.00 S 14.986.15 S !10.53334 40 Sodding, Nursery YD S 3.50 2943 S 10.300.50 2,709.87 S 9.484.55 S 815.96 41 Pipe. PVC, Circular. 5" LFT S 56.73 7 S 397.11 0.00 S S '397.11 43 _ Pipe, PVC, Circular 12" LFT S 5&.53 83 S 4,857.99 114,00 S 6.672.42 S 1114.43 44 Pipe. Type 2, Circular. 12" 11 FT S 53.42 665 S 35.524.30 525.00 5 28.045.50 S 478.80 45 Pipe. Type 2. Circular. 15" LFT S 60.61 73 S 4,424.53 63.50 $ 3.848.74 S 575.80 46 Mpe. Type 2. Circular. 18" LFT $ 64,62 148 S 9,56176 137.50 $ 8.885.25 5 678.51 50 Mechanical PW For RCP Pipe EA $ 722,49 4 S 2.889.96 0.00 $ $ (2.889.96 51 Pipe. Type 4 Circuar, 6" LFT $ 6.25 2495 S 15,593.75 2,346.00 S 14 882.50 S 931.25 52 Pipe Underdrain Outlet, 6' LFT S 26.50 49 S 1,293.50 0.00 S $ 1,298.50 53 Aggregate for Underdrwn CYD S 45.10 232 S 10.463.20 276.72 $ 12,480.07 $ 2.016.87 54 Geotextile for Underdrain SYD S 1,85 2248 S 4,155.10 2.005.49 S 3,710.18 S 444.94 63 Manhole. C4 EA S 4,878.83 5 S 24,394.15 4.00 $ 19,515.32 $ 4,878.83 681 Reolace,Castin and Adjust to Grade EA S 11.260.28 0 $ 1.00 $ 1260.28 S 1,260.28 891 Adjust Casting to Grade EA S 690.87 9 $ 8,217.83 4.00 S 2.763.48 5 3.454.35 70 Sign Post Square, Type 1, Reinf, Ano, Base LFT S 20.00 299 S 5,980,00 305.00 S 6.100.00 S 120.00 71 Relocate Existing Sign EA S 350.00 2 S 700,00 0.00 S S 00,00 73 Sign, Sheet. with Legend 0.080' SFT 5 21.00 153.75 S 3,228.75 152.00 $ 3,192.00 S ,75 75 Service Point. 11, Modified EA 5 1,500.00 2 S 3,000. 1.00 S 1,500.00 S 1,500.00 76 Controller Cabinet. Pt, Modified EA S 3,200.00 2 $ 6,400, 1.00 S 3,200.00 S 3.200.00 77 Controller Cabinet FCundaWn. P1 Modified EA S 1,900.00 2 S 3800.00 1.00 $ 1,900.00 S 1.900.00 78 Handhole. Lighting EA S 800.00 7 S 5.800.001 6.00 S 4.800.00 S 800.00 791 Wire, 04 Copper in Plastic Duct in Trench. 4 IIC LFT 5 14.00 759 S 10.626.00 1,05200 S 14 728.00 $ 4.102.00 80 Conduit. Steel. Galvanized. 2" LFT S 16.00 1985 S 21.840.00 1.862.00 S 29.792.00 $ 7,952.00 81 Wire. #4 Copper in Plastic Duct 4 110 LFT 5 8.00 1385 $ 10:920.00 0.00 S S 10.920.00 82 bhtno Foundation, 18" Diameter. Concrete, with Gra EA 5 850,00 to S 8,500.00 2.00 S 1,700.00 S 6,800.00 831 L! ht Pole 15' Height, Ornamental EA S 5,900.00 10 S 59,000. 3.00 S 17 700.00 S(41,300.0011 Bel Handhole, Communications EA $ 1.3W.00 9 S 11,700. 6.00 $ 7,800.00 S 3.900.00 87 Handhole. 3' Diameter, Communications EA S 2.500.00 2 $ 5,000.00 1,00 S 2.500.00 $ 500.00 9C 4" Innerrduct with 3 x 1-112" Innerducts LFT S 16.00 1801 S 26.816.00 1,132.00 S 18.112.00 $ 10 704,00 91 4" PVC. Schedule 80 LFT S 15.00 SD S 750.00 80.00 $ 1.200.00 S 450.00 92 rans. M.rk. Thermo, Solid While. Crosswalk Whlte. 2 LFT S 12.00 120 5 1.440.00 0.00 $ 5 1.440.00 93 Trans. Mrk. Thermo. Stcp Bar. 24" LFT S 12.00 79 $ 948.00 11.00 S 132.00 S 816.00 94 Line, Thermo, Seed. Yellow 4" LFT $ 2.00 3460 S 6,M.00 1,287.00 $ 2,574.00 S 4,346.00 95 Line. Thermo, Sclid, Yeilax, 8" LFT $ 4,00 68 $ 272.00 0,00 $ S 272.00 961 Line. Thermo Solid, White, 4" LFT $ 2,00 $92 S 1,784,00 50.00 $ 100,00 S 1.884.D0 97 Line, Thermo, Solid, White. 6" LFT S 3.00 97 $ 291.00 150.00 S 450.00 $ 159.00 99Une, Thermo, Dotted. White, 4" LFT S 2.00 50 $ 100.00 40.00 S $0.00 S 20.00 100 Line, Thermo, Dotted White. 8" m LFT S 4,00 102 S 408.001 100.00 1 $ 400.00 $ 8.00 101 Ins. ,',Irk Thermo Yield, White 3'. Shark Tooth, Yield 1 LFT IS 15.00 1 68 1 S 1.020.001 48.00 IS 720.00 $ 300.00 16 -ENG -31 4th and Range Linc R.aB CHANGE ORDER 96 TABLE Item va Dtscriptiue Uait Usk Pvkc Original tit: Original Amoant Fatal r0111Y Fisil Mostar OrtdUsder 1021a ssverse T: arki , T-wmoplasfc, ?aaewrian Crossi'EA $ 150.c0 8 S 1,200.CC, 6.00 S 800.00 1 S(300.00) 106 Snow towable Raised Pavement V arse+, Blue EA $ 250.00 1 S 250.00 0.00 $ $ 250.00` 1071 Snm*rNabte Raised Pavement Mar,?r. Yellow EA S 82.40 6 $ 494.40 10.0: S 824,00 S 329.60 lie 12" D.1. Water Main LFT S 9C.22 1805 S 162,847.10 1,656.5': S 149.449.43 S 13.397.67 118 Compazted Aggregate Backfill, Watermain LFT S 18.14 1645 S 30,827.30 1,656.50 S 31,042.81 S 215.51 120 Complete Fire Hydrant Assembly EA 1 S 5.488,65 3 1 $ 16.465.95 4,00 S 21.954.60 S 5.488.85 125 4" Gate Valve EA S 1.173.66 1 S 1,173.66 0.00 S 5 ;1 173.66 127 8" Connecticns EA S 3.529.50 1 S 3,529.50 2.00 S 7.059.00 3 3.529.50 129 Lon side Services EA S 2.397.00 1 S 2.997.00 4.00 S 9.548.00 3 7,191,00 131 T Blow Off Assembly EA S 1.775.83 1 S 1,775.83 3.00 S 5,327,49 $ 3.551,66 132 Re ace Meter Pit Undistributed EA S 3.453.97 1 3 3,453:97 3.00 S 10.361.91 $ 6,907.94 1331 Line Stop IT(Undistributed) EA S 8,341.77 1 S 6:34117 0,00 g S 8,341,77 1341 Una Stop 8" Undistributed EA S 8,041.77 1 $ 6.041.77 0.00 S 3 6,041.77 135 line Stop B' Undistributed EA S 5.741.77 1 S 5,741.77 0.00 S $ "5.741.77 136 Team Inserts Valve 12" Undistributed EA $ 18,841.77 1 S 1&841.77 0.00 S S 118.841.77 137 Team inserts Valve 8 Undistributed EA S 10.541.77 1 S 10,54117 0.00 $ $ '10.541.77 138 Team inserts Valve 6" 'ndisthbuted EA $ 8.141.77 1 S 9,141.77 0.00 $ $ (9,141.77) 139 Valve Retirement EA $ 1.009.06 e $ 8054.36t,DO S 1.009.06 $ 5,045,30 140 Hydrant Retirement EA S 1,149.72 1 S 1,149.72 0.00 S $ 1 149.72 141 2' Concrete Cap for Watermain SYD S 44.27 90 S 3184 3n 0.00 1 S $ (3,984,30) 142 Fiowable Fill For Wate mainCYD $ 87.72 85 S T 456.20 0.00 $ $ ,456,20 1 Tranch Drain LFT 5 312.33 1 S 31233 6.00 S 1.873.98 S 1.561.65 149 Amhway Reiocatlon LS 5 239237,56 1 $ 239.237.56 0.50 S 119.e18118 $ 119.618.78 15D Manhole. C-10 EA $ 3460.78 0 S 2.00 S 8 921.58 S 6,921,58 '51-A ted Crosswalks. Chan Ordx #1 LS $ 135 300.00 0 S 0.64 S 86 526,00 $ 88 526.00 160 R Line RAB ArchwayAdditional Cost LS 15 21.000.00 1 S 21,000,00 0.50 S 10 SQO.00 $ 10,50C,Ccs 161 Miller Auto tr T3M LS S 4,235.00 0 $ 1.D0 S 4,235.00 S 4.23:.00 163 As Mobilization for West Le of RAS tS S 2.500.00 0 S 1.00 S 2500.00 5 2.SC _.CC 1!34 51h Street Matenal Cast Storm Strxtwes` LS $ S.SE _3 5 1.00 $ 6 569.39 1 ;'- 41h Street acd 6th Street L' h Material LS S W. ? = $ 1.00 $ 61.062.34 5 81.Gc= 3a TO1:'LorC'fi:1�GEORDERITT-MS 15 (297,648.39 ORIGINAL CONTRACT PRIG= S 7,705.495.11 MAL MANGE ORDER *6 S i'_97.643 391 NEW CONTR4C7,WOU\T INCLUDINO APPROVED CIA,\\GE• ORDERS S 7 407,846.72 116 -ENG -31 4TH AND FUNGE LIVE [LAS EXHIBIT A I ou h,n a been directed to make the fnlloaing changrs is this Curowwl: its I Nn i rseriptioe Reason For C'Ys"gr' Adiushci quaruntes to huiancc orsgntai cmilrart quamaoss serves the w" quavmtts used for east 1 Constn ction Engineering stem Adjusted q.,w,t rs to Fwla"ce onSnud cmucaec quanuatrs stews the actual quantmen used fee eskh 3 F=Nd ORce flint Ad-wacJ quantutes to balance ortjst" nruuact quaintness swws the actual quantities used foreadt 4 Office E to . nt Itan Adiusted quamnus to Lwtmtce oeigual axnraet quunuurs .etsus dor Altut yuxtttOes used foreaci 5 Maintenance of Tratric item Adj ata quantities to balance otip sal contract quaatnties serstu the aluat quamuics used for suit 10 Storrs Mater Quality Management Budget „ Adjusted quarutusi to tralarce original euotrxt qusnu es terws the actual quinates used for ead, 11 Suborade Treatment. IV 11,cru Adjusted quatnuai to balance cutetnai e.aur,,:t qus"tittes versus the actual quamuttes used for each 12 Su rade Treatment. i -B te", Adjusted quammes to bola t onyanat a ritrxt quantaws verso+ the actual quatuuttes used fa each 13 Sub rade Treatment Type 11 ;tern Adjusted quarutnes to bai.mce original contract quantities %&sus the actual guatntes used foe eadi 14 Structural Backfill, Type I ,rem AJiumed quamuues to balance original contract quantities versus the A;t" gtamubes used for each t5' Compacted re ate No. 53 Stone .Adjusted quxiorses to baLtnce migia contract quanrties hems the actial yuamhcs used for each 18 Subgrade Treatment (Undistributed) item Adjusted qua renes m balance OnJ;1Dal Conessi gtsanrnies a ersus the actual quanttnes used for eadt 17 Ge id utero Adjusted y.wntttus to balance otiguwt eo"traet quanmios swsus the anud quem t— "ani fa -,:h Is Asphalt Kl in9. 1.5" ..,. Ifintri iltftaatCJ gnanitiCa W balaal't Qft§1nWt CanitraCt gnaatttiiej 4Nit15 rt1C aCtu3t yUantoo, Used or teat 19 HMA Surfrce. T e'C'.9.5 tom it Adtus<ed quamatiss to balance ongmai coteraci quantities ceruts the actual quanRurs used for em:h 20 HMA Intermediate. Type'C".1&0mm Item Adjusted guatimes so baLmce ongitat contract quuntures versus the actual quutontws. used for each 27 HMA Intermediate. T 'C', O.G.19.0 men Item .Adjusted quatuates a balalee onyual conutio quanwsss tersus the octal quantities used for exit 22 HMA Base. T e'C'.25.0mm .nem .Adiusted qu ar ntes to balance crioutl wntrxa quantuies versus the actual quataities used far exit 23 HMA Surface, T W. 9.5 mm tam AdjusW quaantities to balance arijjin it convect quantities crews the actual quamtties used for ea.,: 24 HMA Intermediate, Type 'Er 19.0 mm item Adjusted quagnies it) balance original coruexv qu,lrttiiese s .sews the xtual quantities used fm each 25 ..� HIMA Base, Type'B', 25.0 etas Item _ Adjusted quamnten to balance —sural co"tract quo uarcs .tress the actual quaru rtes used for each 251 Aspnait for Tack Coat Item Adjusted quantities to balance onttinai contact quantiles versus the acr ai quyttiues used for er_ -. 27 PCCP. 7' nern Adjusted quaiuntes to balance angsauu contrast quantities, hems the actual quaminirs used for each 28 Sidewalk. Concrete item Adjusted gtwnutxs to balance resytnai contract quantiles versus the actual quantities used far acts 29 Curb Ramp. Concrete. Includes Detectable Warming Elements teem Adjusted quantities to "atce ongtnal contract quantities tarsus the actual quamaics used for tact 30 Concrit a Curb, Barrier tat" Adjusted quantaws to tulanca original contracl quantities testes the wtosl quantities used for each 311 Modified Poll Curb item Adjusted quantities to Manor onginat contract gtantiuies . erxus the wtual quanutics used for each 32 Center Curb. Type 0 item _. .Adiusted quantities to (Want original eontraet gnu antics tarsus the wtual quancnits used for each 33 Curb and Gutter, Concrete. T ae it own Adjusted tpantaws to trdx+ce ongtnal outran quarnatues yaws the actual quamuies used for cacti 34 5- Vadaole Harrier Guru ne^t Adiusted low.la es to bWArce onwitai ContrxK q mlmies versus the wtual quantities uwd tar each 35 Concrete Barhd nem. AJiuued quvrovows to bal:xtre vvtgma; contract yuattnus cpsus rite actual qoa tioes used far rush 36 PCCP for Approaches, Residential, 6" 111m Adjusted qusturies ro balarwre wibnmat en"txy gttanlaws tersus the x-tual goaMines used for cues 37 PCCP for.4p oaches. Commercial, 9" itty" Adjusted quattiies a Lwlatca origami c»ntract quan o its wolus the -t-if quantnies used ftu each 39 To soil (Assume 6" Thick) ,m Adjusted quantities to balmier onatnat contract quantities %wsus the areal quantities used fur each 40 Sodden . Numary item Adjusted quantities to tulancc origami contract quaettmes versus the genal quantities used for each 41 R e. PVC. Circular. cr i Adjusted qunntuies to balance uipi d auuract quau"tes versus the actual quantities used (breach 43 Pipe. PVC. Circular. 12' them Adjusted tpiattahes so haLxice ort,7ral contract quamates %wsus the actual yu:uunirs used for each 44 Pipe. Type 2. Circular. 12" item Adp sued qusihtie i to Ltd.vtce orstptal contact gttanfituc= �etws the actual quantities used for each 45 Pipe, Type 2. Circular, IS" 111em 16-ENG-31 4TH AND RANGE LINE RAS EXHIBIT A 1 ou hale hh,n drferied to make the falfu%inr changes to this (ooiratt: Ism Na 13-110041 Reaseo i`ar C bsw iA&ustre quanmtes to bedo we ortgmal cavmraci quantities vefsas :ht actual 4uarunees used frrt end% 48 Pipe. Type 2, Circular, 18' Adjustead yrlartntn to balance angontd contrect gvtsmntes vrrws the aenai gcurmres used !Or rsdt SC Meehan cal PI For RCP pipe,/e,, .AJ)asted qusn"ve" 10 hila! 't Vtitnnat Contract gfAnlnles tetti0s the a "11 q!lafttittes used ion each 51 Pipe, Type 4. GirixAar, 6' Tian Adjusted quantities to balance ongtiml co ntraat gruntnres versus the acrust q,muincs osal fa each 52 Pipe, Underdrain Outlet. 6" ,tem AtIps eJ quottins to t atanx ofiginal conusot quantities torus :he octan quanrittes used fat each 53 Aggregate for Underdrain ,ice Adjusted quantrttet to ha a anginal contract gwntitus aersos the actual quaul tors usod for each 54 Geaexti#s for Underdrain Adjusted quritinei to brt:mce ongmal contract quantities versus the acnral q;taruTncs used for ea h 62 Manhole. C4 n n. Ad)uswd quarumes to balanct onyind emtrxt quamktes versus the acotat quantities used fa each 58 i Replace Casting and A use >a Gratle ji crit a Adjusted qu nures 10 bon itanct gmal contract qu3muws versus the aetual quantities used for each 89 Adjust Casein to Gad® ,tent, Adjusted quamu:es to halarc, orgpnai c tit Av qu autos vasal the actual goamnies used for each 70, Sign Post. Square. Type 1. Reint, Ant. Base ice„ rldUsted go=lt:ea to WWWe original cant n -= quantities versus the aual quantities u-u for each 71 Relocate Exist S7 n ,yrc 73' Sign. Sheet, with le o.C80' .AAnisted quannites to b sfain t: a original conact yuanmus taws the auttul yusmihes used i4f each herrn 75 Service Point 11. Modified AJ)usted quaniom to balurwc engaul cont-act quinines versus the actual quaninhes used for emit item T8 Controller Cabinet. Pt, Medved Adjusted quantities to ba�ance mguaat cat*act quantities versus the acuai gu;avtntts used kt each ilea. Adtusu d geunutics to balance Unetnal ctntrxt quwtutes versus tete actual qux:sties used for cjsch 77 Controller Cabinet Fcundalion, Pt, Modified em AJtussed quannttes to b:dwce anginal contra quartmes tcf,cws the actual qumnnes used fur each 78 Handtlole, Lighting sit-in Adjusted quantities to hilar- engird conrxi qurtnnes versos the xtu:d quunnhes used for tact T9 Nhre, *4 Copper in Plastic Duct in Trench. 4 t1C uorit Adjusted quantities to halawe Ongtnai canbwt quartmes versos the xtuat quanii:ws usrvd fur rich 8o Condtet. Steel, Galvanized. 2' item. Adiusard quantities to bulance ortipma contract quaatitits versus the toad quantities used fix a sdi 81 Ore. 04 Copper in Plastic Dud, 4 1I tient Adjust+! quantities to balance ongtnal catiract gttanuurs vrrssia the xtwvt quantiises used fur weft 82 Lighting Foundation, 18' Diameter. Concrete. with Ground item_ .Adiusu:d quantula to balawt ongmai —batt q"1111 es versus dot actual gut wws used for each 83 LI tit Pole 1e.•' Height. Ornamental n em Adjusted quantities to balance onitnat contract quantities versus nu the aci quanuues used fur exfi 88 HafAttola. Ccmmunications flefly Adjusted quantities to balance ong:.—I cwitrewi quantjies caws the actu:d quanities used ror tacit 87 Hnr fJthala. 3' Demeter. er. Cemmuraeations A Adjusted quantittts ro balance ortgtnsit . rutact quannues versus the actual qualities used for each 90 4' innerrduct with 3 x 1-1)2" Innerducts item Adjumed quwtltws to badattee Original contract quwteues versus the actual quantities used for each 91 C PVC, Schedtde 80 Ttcm 92 Trans. Mrk. Thermo, Solid White, Crosswalk, While, 24' Adjusted quuntutes to balwvt umptid( cmuxy quinmies versus the sawA quantities used for tach item Adjusted quamnecs to balance original crtirat:t quantities vasa$ the xnud gtlantitits used for each 93_Trans. Mrk, Thermo, Stop Sar. 24' ...__.__......-- , .Adjusted quaantees to bWmkv ofigltnd c.mtrxt quantities versus the wusj quanuties used for tach 94� Line. Thermo, Solid, Yellow 4" , iAdjustcd quaninws, to balance original vntrxr quantities versus the arneJ gvansrties used for each 95' Line. Tharno, Scrod, Yelioay. 8' , ' ,tdjwted yuannhes to baler a ongtnai contract qurtiies vrrsus The;utual gwnits un used for each 981 Line, Thermo, Solid, White. 4" item (Adjusted quamntes to balmwr unjnnai writraet quantities versus the xtmd quantities uuxd for each 97� Line. Thermo, Slid, Mte. fi Unca ' i.Adjuswdqutmtaws to balmonginat eoniract gttamitits versus the xjtcd quantities used for each 99` line, Thermo, Dotted. While. 4' Man 3Adjuaed quantum to balance onjunal c niract quanutits versus the actual quantitees used fo: tac9t 100 Line, Thermo. Dated WMte. 8' .teem 101 Trans. Mrk. Thermo Veld, While, Y. Shark Tech. Yield Line 'Adjustrd quantities to balatw<nngtnsd contract Guantrtnls versus rhe acntad quaftijttes used fot each ,%tn AJjusttdquuitmts 10 belanct anginal contract quantifies versus the at:tuod qu:auwts used for each 102 Transverse ktarki . Theme lestic. Pedestrian Crossi .. item. Adjawedituaetitics to balance ongrnai contract gtuvatttes versus the actual gwm,ttcs used for each 108 Sn owable Raised Pavement Marerr. Bluei Adjtawcdquant:ues to lmlance ongtnal coruract quatunies vcries the avtuui quantities used to each 107 Snowplowabie Raised Pavement Marker. Yellow n em Adjusted quantities to balance otdprna) connst gtumnUes versus the xtuat quanonts used for each tie! 2` 0.1. Water Main iter 16 -ENG -31 4TH A\D MANGE UNE RAB EXHI BIT A 1 ou have been directed to male the (oliowing changes in this CmIract: kew ijtMcription Ressar Fac Closer guantrues to u'ar4Y ompla, Ctifiu= qu3ntnxs Vtr— the xthnl 4uwtit," med for tach 119 Compacted Aggregate 8ackfilf, Watermain ie, ,tem ! Ad)ueted gtunimes to bal irCc mgYnal contr3o quantum% versos The actwl quaf'titieS used fur 120 Compete Fire H• crani Asseftly Item Adjusted quauhties to tia:.n Y Ytprnal Cmtract gnantitroi \enu5 the actio{ i uty;titiel used (m t".tt". 125 4" Gate Valve O t. Adjusted yuaurnes to balmet original contract quamciies versus the actual gow.unies used for C.srh 127 8' COM916 ions n AdiusteJ ytci:utncs to MwWv ariginat cvuhuact quantities Iaxis the wand luaruilles used for each 129 Lon side Services 'tam Adjusted quantities ar haiance original comran quantruts versus the scrim{ yuamuits used for each 131 2" Slow Off Assemb T Ad)usted quxtttua to Isalonv a wtpnat cmiracr quanntes tarsus the act quminues used for ea dt 132 Replace Meter Pit (Undisftuded) inns Atf)usted guamnles to N%Um r original emiat quantities versus the actio{ quaraures used for each 133 Line Stop 12" Jndistnbutedi flon Ad)usteJ yu renew to Winne urhgiaa; cmmict goxnutes tersus the actind quantities used * extra 134 Line St 8" (Undistributed) nem. AJ)usleJ yuannties ".O btdance oripmai cmtr= quantities verses the uetu A quantities uad tett each 135 Line St S"(Undistributed) Item Adjust til qumicties to baivhoe oripoat cm racy quantities versus tiro acus{ qu amucs used for each 136 Team Inserla Valve 1T Undistri Wee) Item Ad)ustcd quayrties to balmtee origirid contract quantun terms I;* acruid maim ues used Eur each 1371 Team Inserts Valve 8" Undistributed) sem A4mvcd quamnars •n hwance ontpnd canvas quant fees tows the x' -it yuamnics used for each 138 ____Team insert Valve 8" Untbstrtbuted' ,gym Ad)usted quaran:es :o titlaxce orryttnat cami:acl quantuas nernats the xtixd ghumaules used Par <:w -h 133 Vat,.- Retirement atm Adjusted quarUnies .a balance OnStnat contract quantities worstis the xusd qumnacs used for east 140 Brant Retiremarl ,rte Adjusted quantities to baVance ongind contract quanulies versos rhe xtud quwitaes used for eaci 141 1st Concrete Cap for Watermain sem es Ad)ustod 4vannito Malone onglod contact 4umiumes versus the atttW yuantnies used far race 142 Firnvabie Fib Fa Watermain Hens Adjusted quarimes to balami:Original coma l quantities versus die xtual quasnucs used for each 148 Trench Drain .tem .Adjusted quantities to batamv iviprad cottuuu quantnes versus the annal yuaruties tisai foresw4h 148 Arctmay Relocation ,wm AttitutcJ quattit:es m batitrmer ixigmai contract gtranunies ursirs rhe xttW q.wanies used for —h 130 Manhole. C-10 item 151-A Lighted Crosswalks. Chiange Order 91 _ Cosi ul'the Ilgtncd crosswatLs that were adJcJ to the connive and then deleted 160 R&Ve Line RAS Archway Additicnai Cost Additional rnxs due to cmbili=ion of the xchwx offof die sue 161 Miller Auto Lighbrig T8M Added tights per direction of Carnet Enytm erng for'tiler .Ana pa king Int -- 183 Asphalt Mobilization for West Leg Of RA 8 hes arid- fir addiuomal mobdir mom fee due to delay's with propene uWursa nt. 164 8th Street Material Cost (Strom Structures) Thus nein was added to pp for remaining storm areteture material tha :aasn'< inaatitJ ^- 168 4th Street and 6th Street Lighting Materia{This Item ass aditd to pat far tenoning fight pile n atrnal that assn t nvstatlev Memo To: Doug Haney, Corporation Counsel From: Lisa Scott CC: Jeremy Kashman Date: 07/10/18 Re: C.O. #6 Range Line Road 4 I St. RAB Project #16 -ENG -31 Doug, please find attached 1 original of same change order for project #16 -ENG -31 Range Line & 4 I St. RAB. Please review & initial for the next BPW Meeting. Change Order #6- Original Contract Amount: $2,797,315.57 Decrease: $297,648.39 New Contract Amount $7,407,846.72 *** Combined contract with Veterans Way and 4th SW West of the Monon"` Thank you, Lisa Scott 9 Page 1