Loading...
HomeMy WebLinkAboutRieth-Riley Construction Co, Inc/Eng/CO #2/-21,730.83/116th & Towne Road RAB – Project #16-ENG-53City of Carmel Project 16 -ENG -53 116th Street and Towne Road RAB CHANGE ORDER #2 Extra work and revisions to existing contract items for the proposed roundabout. Contract Price prior to this Change Order $1,231,067.88 Contract Price will be decreased by this Change Order $21,730.83 New Contract Price including this Change Order $1,209,337.05 Original Contract Amount $1,099,625.56 ....... _ Adjusted Contract Cumulative % Change Price from Original Contract N/A N/A $1,231,067.88 12% Col $131,442.32 _ � cot ($21730.83) � , - 33705 10% $12119, . , CITY OF CARMEL TO: CONTRACT CHANGE ORDER NO.: 2 DATE: 3-9-18 PROJECTNAME: 16-F,NG-53 l I St & Towne R.d RAB CITY REQ. NO.: CITY PO NO.: 100178 CITY PO DATE: 2/16/17 _. Qeo� ��� I. You are directed to make the following changes in this Contract: See Page 3-4 for all for all changes in contract v 0 SCHEDULED ADJUSTMENT ITEM AMOUNT (t1_(Kf _L QAYS 17. The following referenced Documents further describe the changes outlined inParagraph I, and are to be considered a part of this Change Order: R.F.P,:__z _W.D.C. No.: Other:.,Cha. nge Order..2_._.._._.... ..... The changes result in the following adjustment of. Contract Price and Contract Time: Contract Price prior to this Change Order $ l,?31.067.88 Contract Price will be increased/decreased by this Change Order $_(21,730.83) New Contract Price including this Change Order $1,209 ,337 0 Contract Time Prior to this Change Order N/A Days N/A Completion Date Net increased; decreased resulting from this Change Order_ ._NLA Days Current Contract Time including this Change Order N/A Days N/A Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Approved: Recommended Accepted: 14 Lt.�R ce i.e INCE F,NGII EE'R boa .Address silerE $o0 City/S tatelzip By: Phone: 5��-Zle-•ZR!!'T � Date: X��>• N - h � �e >rl S�Fu C�l�l'i CONTRACT( ii Address CitylStat lil, Date: _S -11`1,F ATT S: hristine S. A auley, Clerk - Treasurer ,p�i� Date: --7 a Project No.: 16 -ENG -53 D escr I o ti o n: 116th Street and Towne Road Roundabout Tope: Overrun/Underrun Summary; Balance to contract Items Change Order Description: This change order represents the overruns and underruns fur the conuact Items. The totals for (hese items resulted in an overall underrun of $22973,93 The addition of two pey items were needed to complete the new lighting work on the project. It was determined that a new meter/meter base was needed to proped,/ operate the lighting installed on the project. Per IPL requirements contractors are to Install steel conduit from the controller caWnet aril stubbed up to the utility pole from where power would be fed„ The new 200 amp meter base costs SS50.00/11ACH and the steel conduit has a price at S2340/1.FT, Approximately 30 LFT of pipe will be needed for a total of $693.00. These two items MR add $1243.00 to the contract. The two combined change: to the contract ra;utt M an ovefad underrun of S21,730,83 to the current contract amount. The original contract amount was $1,^.99,fi25,56. Change Order 1 added $131,442,32 to the contrad giving it a project amount of $1,231,067.88, With this change order the revised project amount now totals 51,209,337,05. TMs amount is just under 1011 of the original contract amount Awarded Project Amount: $1,099,625.56 Authorized Prolou Amount: $1,131,067,88 Change Order Amount: Revised Project Amount: $1,209,337.05 Quantity Changes: Rein No Description uli Unit Fries OuanuN Amount 5 7..'TEhiPC^BARN ACRROW GGA IuTRUCTION ENTP,APiCF.IEXIT CYS LS S 1.:30 S 117:.00 -298,00 -100 32199 001 (51.475.001 a TEMPORARY INLET PROTECTI(JN, CURB EACH $ 80.00. •30,OU 132.400,001 1n TE&WOPMYIt4i.ETPF40TECTION,DITCH EACH i 00.00 .11100 {5800.00) 1t TEMPORARY MULCH ' Toni S 39G.0U •9.UQ ($3,5 tO.wl 12 TEMPORARY SILT` FENCE LFT .$ 1,00 -4:142,00 111,455 601 17 TEMPORARY SEED MRCTURs LBS 5 0,25 -37210 (593.00) 14 SUDGRADETREATMENT TYPE 11 M 3 312 -144.00 ($51.5.,181 16 17 ABORROW STRUCTURE BACKFILL, TYPE I CYS CYS i v 28,.05 28.4)1 540.30 -71130 ,. 165 42 ($2.047,85) 19 COMPACTED AGGREGATE N0.53 8bS j TON S 29.43 7724 $2.27317 20 MODENINO WITH MMA, TYPE C TON i 130.00 8,01 x1,041.30 21 MILL'14G. ASPHALT,1 ir21N SYS 3 2.09 343.00 $71087 23 HMA SURrAGE, TYPE B, 9.6 MM TON $ 116.00 19.67 11,862.05 24 RMA, St,1RFACE, TYPE C. 9.5 Mhz TON 3 76,00 16.05 $1.143,60 25 HMA INTERMWATG, TYPE 9,19,0 MIA TON S 61.00 19.45 31.576.26 26 HMA INTERMEDIATE, TYPE C.18.0 MM TON S 63.00 ' -16.28 ($1,025.54) 27 HMA BASE. TYPE C. 25.0 MM TON S 5100 -116.46 156.838.221 28 HMA INTERMEDIATE, TYPE C, 00. I" MM TON S 61,00 ' 00.95 (34.939.78) 34 CURB RAMP, CONCRETE SYS 3 10500 4,27 $83286 32 DETECTABLE WARNING SURFACES SYS $ 30.00. •5.45 ($163 X01 33 BARRM CURB AT RA13 TURN APRON LFT 3 25 00 1,00 $25.00 34 CURB AND GUTTER, CONCRETE. TYPE 0 LFT 3 20,00 -164.00 ($9.280.00) 35 CUF48 AND GUTTER. CONCRETE, TYPE lit LFT S 21.30 -8.00 (51 20 Op) 36 _ CENTER CURD, A. CONCRETE SYS 3 140.00 3.22 $4511,80 39 _ MODIFIED ROLL CURB LFT = 24,00. -700 ---7i, 68 ($168 00) 40 HMA FOR APPROACHES, TYPE C TON $ 586.55. 72.00 (31,133.10) 42 MONUMENT, SECTION CORNERS EACH 1 600,00 -Ica ($1100100) 43 13ENCII MARK POST EACH 3 075 00 -2001 (51.350.00) 47 MOBILIZATION AND DEMOBILIZATION FOij SEEDING - EACH $ 60.00 -2.00 r_ ($j8o OM 48 FERTILIZER _ TON S 500.00 -110 35C0.00 49 TOPSOIL CYS $ 24.32 7.00 $170.24 50 SODDING. NURSERY SYS $ 3.50 5,835,00 $20,482.50 54 PIPE, TYPE 4. CIRCULAR, A IN LFT S 6.76 -282.00 ISs 760 5", 55 PIPE. UNDERORAIN.OUTLET 61N - - LFT $ 12.00 -126,00 56 PIPE, TYPE 2, CIRCULAR. 12 IN LFT - 60.3 -40.Q0 ($2,24020) ' 60 64 VI DEO INSPECTION FOR PIPE _ AGGREGATE FOR UNDERORAINS LFT - CYS S $ 2-t9 59.00 -758.()0 21.00 (3iAW02) ($1,239.00) 65 GUOTEXIILGtff FOR UNOERORAIN SYS 5 1.65 309.UC !$344.851 67 TRENCH DRAIN - LFT S 362,78 1.50 5544.17 00 CASTING, ADJUST TO QtRAGF, TYPE I _.... ...A._.._ EACH S 642.00 o -2 U0 —(_.,1... (5,284.005 99 CONSTRUCTION SIGN. A EACH S 15000 7 0 , $1.05300 92 eARRICAOE.III "A Lf $ 6.00 3900 1215,00 93 6ARRICA.OE. 0140 irT $ 800 -4800 {LZII300;00; 90l SIGN. GROUND MOUNTED RESET EACH S 200.00 •1.00 ($200001 108 HANL-HOLE. LIGHTING EACH 1 7.15.00 -t OQ (6T75,00i 101 VYIRE.. XH4W, NO 4 COPPER, IN PLASTIC DUCT, 4 1 /C ,-. r_. LFT $ 11.00 -735A0 ($8,085 001 112 _m___............_ ,,AALF. POLE ClsiCIJIT THVJN. NO t0 COPPER, STRANDED 11C I.fT c O b!: -46000; ._...... (S.tia 0(V 117 WJSULATION LINK. WATERPROOFED EACH $ 30.00 `-' $120"1.) 118 24' LFT S —4.00 4.30 224,W. $1 008.0(1 119 LINE, THERI, OPLASTIC, BROKEN. WHITE. 4 IN LFT j 0.50 141001 570 50 120 ONE, THERMOPLASTIC, SOLID. WHFT, 4I LFT S 0.50 180Q 58.00 121 LINE. THERMOPLASTIC, DOTTED, VIHiTF, 0 IN LFT $ 2.00 t777i t777 5120,00 122 t.INE, THIFF(MO >L.ASTIC. DOTTED O IN LFT f1.54 22 00 (39.00 123 TEETHI, WHITE LIT S 10.00 4.00 14000 - 124 LINE. THERMOPLASTC, SOLID. WH E,81, t.FT $ 1.00 12t„30 S1121,00 125 t 1NF. THEWOPLAST IC. SOLID. YELLOt`J. 4 IN LFT S OSO -17.00 126 YELLOW. 112 LFT 5 025 ABODO ($12225) 127 WL`ICATIONARRO`N,'FISliliOOK' EACH -E 2600 -24,00 (540.00) 128 INDICATIONARROW _ EACH S 80,16, -4.00 ($327.00) 129 SNOWPLOWABLE RAISED PAVEMENT MARKERS EACH $ 1.00 42,00 (S42001 130 LINE THERMOPLASTiC, SOLID, YELLO'N, BIN LFT 6 1 00 480.00 � Saa, 00 133 CONDUIT, PtIC, 1 IN LFT $ 9.00 -50,00 (mado1 134 MILLING, SCARIFICATION SYS $ 500 -;740 ($?05.00) 147 MOT FOR TIMSERfGUARDRAIL-GUILFORD RC LS S 1,783.B0 -LOU (11.763,801 149 MOTFORR[C'TAMGULARRAPVU LASHING BEACONS LS S 8.100,21 .100 ($9.190.21) 15A STABILISATION SYS S 753 -185.40° 1$1,398,091 Sc4tsvfAl(IurpW1 pa-Is1 ($22,973.131 New Items: buo0a Order Tutal I(}213110.031 m - 'ek 5,- /-y Contr a r_: o� Da;e Memo To: Doug Haney, Corporation Counsel From: Lisa Scott CC: Jeremy Kashman Date: 06/28/18 Re: C.O. #2116th Street & Towne Road RAB Project #16 -ENG -53 Doug, please find attached 1 original of same change order for project #16 -ENG -53 116th & Towne RAB. Please review & initial for the next BPW Meeting. Change Order #2- Original Contract Amount: $1,099,625.56 Decrease: $21,730.83 New Contract Amount $1,209,337.05 Thank you, Lisa Scott 0 Page 1