Loading...
HomeMy WebLinkAboutA011.08 " 8" 4 '-0 " 1 0 '-4 5 /8 " 1 0 '-4 5 /8 " 6'-9" 6'-5 1/4" 2 '-0 " 8'-8" 9'-6 7/8" 9'-6 7/8" 4'-0" OU T S I D E OF EX I S T I N G BR I C K TO CE N T E R L I N E OF NE W PI E R OUTSIDE OF EXISTING BRICK TO CENTERLINE OF NEW PIER FOUNDATION FRAMING FOUNDATION /DECK FRAMINGNOTES: -FURNISH & INSTALL (19) NEW 18"Ø X 36"D CAST-IN-PLACE CONCRETE PIERS AS SHOWN ON PLANS. -FURNISH & INSTALL (19) NEW 6X6 TREATED POSTS AS SHOWN ON PLANS. NEW POSTS TO BE ANCHORED TO NEW PIERS WITH SIMPSON STRONG-TIE (OR EQUIV) MOUNTING BRACKET. -FURNISH & INSTALL 6 MIL BLACK PLASTIC VAPOR BARRIER ON GROUND BELOW JOISTS. -FURNISH & INSTALL TREATED TRIPLE 2X12 DECK BEAMS AS SHOWN ON PLANS & DETAILS. -FURNISH & INSTALL TREATED 2X8 DECK JOISTS @ 16" O/C OVER NEW BEAMS AS SHOWN ON PLANS & DETAILS. -FURNISH & INSTALL DOUBLE 2X8 BEAM AT FIREPLACE BUMP-OUT AS SHOWN ON PLANS. TOP OF BEAM TO BE FLUSH WITH TOP OF JOISTS; ATTACH TO DOUBLE JOIST WITH SIMPSON STRONG-TIE (OR EQUIV) HANGER. #1 of 12 Date: 04.24.18 Sheet: Revision: www.caseindy.com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f) These drawings have been prepared by Case Design & Remodeling solely for its use and should not be reproduced or relied upon by any other parties. Dimensions shown or scaled are subject to change per actual job condition and must be verified. Materials are to be supplied as specified as equal or standard when not uniquely specified. Installed materials may vary in appearance from drawings. Reference manufacturer's product data for actual appearance and specifications. An d e r s o n Re s i d e n c e Th r e e - S e a s o n s Ro o m Ad d i t i o n & Ou t d o o r Li v i n g Ar v i e & Ke l l y An d e r s o n 60 1 7 Ta n a n a Dr . Ca r m e l , In d i a n a 46 0 3 3 Approved By: Date: 4 FINAL Craig Dice Designer cdice@caseindy.com Dave Null Lead Designer dnull@caseindy.com PROPOSED FOUNDATION & DECK FRAMING PLAN SCALE: 3/16" = 1' FOUNDATION PLAN AA DECK FRAMING PLANBB #2 06.20.18 07/12/18 Mike Sheeks