Loading...
HomeMy WebLinkAbout327763 07/20/18 `^?4F� CITY OF CARMEL, INDIANA VENDOR: 366795 ONE CIVIC SQUARE H W C ENGINEERING CHECK AMOUNT: $*****6,601.75* /_� CARMEL, INDIANA 46032 601 SOUTH 3RD ST CHECK NUMBER: 327763 .y«oN�°` TERRE HAUTE IN 47807 CHECK DATE: 07/20/18 DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION 202 R4340100 101057 2018005S0002 6,601.75 ASA 6: CARMEL DR AAA VOUCHER NO. WARRANT NO. Prescribed by State Board of Accounts City Form No.201(Rev.1995) Vendor# 366795 ALLOWED 20 ACCOUNTS PAYABLE VOUCHER H W C ENGINEERING IN SUM OF$ CITY OF CARMEL 601 SOUTH 3RD ST An invoice or bill to be properly itemized must show:kind of service,where performed,dates service rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc. TERRE HAUTE, IN 47807 Payee $6,601.75 ON ACCOUNT OF APPROPRIATION FOR Purchase Order# Engineering Terms Date Due PO# ACCT# DATE INVOICE# DESCRIPTION DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT 101057 2018-005-S- 43401.00 $6,601.75 1 hereby certify that the attached invoice(s),or 7/2/18 2018-005-S- Carmel Drive and AAA Way-Design $6,601.75 0000002 0000002 2200 Pneumbered 202 bill(s)is(are)true and correct and that the 2200 202 materials or services itemized thereon for which charge is made were ordered and received except Wednesday,July 18,2018 Jeremy Kashman Director I hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have audited same in accordance with IC 5-11-10-1.6 ,20 Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer Confidence in the buitt environment, 601 South 3rd Street ENGINEERINGTerre Haute,Indiana 47807 tivrr�w.h.vicenglnerrring.com Carmel City of Attn:Kate Lustig One Civic Square IF .p t O ► o S74 Carmel, IN 46032 ,ZO2_ 2y 3y 0% 00 July 2,2018 Invoice No: 2018-005-S-0000002 Project 2018-005-S Carmel-Carmel Drive&AAA Way PO#101057 Professional Services from May 28.2018 to July 1.2018 - - ---- -- -- -- -- -- --- - -- - - -- - Phase 10 Survey Fee Total Fee 17,500.00 Percent Complete 100.00 Total Earned 17,500.00 Previous Fee Billing 14,131.25 Current Fee Billing 3,368.75 Total Fee 3,368.75 Total this Phase $3,368.75 - - -- ---- - - - -- -- ----- -- - - --- --- - - --- -- - -- - ----- - - -- Phase 11 Route Survey Plat Fee Total Fee 3,700.00 Percent Complete 84.00 Total Earned 3,108.00 Previous Fee Billing 0.00 Current Fee Billing 3,108.00 Total Fee 3,108.00 Total this Phase $3,108.00 -- ------ - - ----- - ------- - - ----- ------ - --- -- -------- Phase 20 Stormwater Design _ Fee Total Fee 36,000.00 Percent Complete 0.00 Total Earned 0.00 Previous Fee Billing 0.00 Current Fee Billing 0.00 Total Fee 0.00 Total this Phase 0.00 - - - --- -- --- --- - - - -- --- - - - ----- - - -- -- -- - --- - -- - --- - Phase 30 Roadway Design Fee Total Fee 231,100.00 Indianapolis Terre Haute I Lafayette I Scottsburg vnvw.htiveengin eering.com t Project 2018-005-S Carmel-Carmel Drive&AAA Way Invoice 0000002 Percent Complete 0.00 Total Earned 0.00 Previous Fee Billing 0.00 Current Fee Billing 0.00 Total Fee 0.00 Total this Phase 0.00 - - ------- --- --------- -- ------- - --- -- - - --- --- - Phase 31 Lighting Design Total this Phase 0.00 - ------- - -- -- -- - -- -- -- - - - ---- - - - --- --- - -- -- - -- Phase 40 Landscape Architecture Services Fee Total Fee 19,300.00 P_erc_ent Complete 0.00 Total Earned 0.00 Previous Fee Billing 0.00 Current Fee Billing 0.00 Total Fee 0.00 Total this Phase 0.00 - - ------ - ------ - - -- --- - - -- -- -- - -- ---- - -- - --- - - Phase 50 Utility Coordination Professional Personnel Hours Rate Amount Designer/Technican 1.25 100.00 125.00 Totals 1.25 125.00 Total Labor 125.00 Billing Limits Current Prior To-Date Total Billings 125.00 0.00 125.00 Limit 19,100.00 Remaining 18,975.00 Total this Phase $125.00 - - - - -- -- --- ---- ----- -- - - -- ---- - - -- -- - ----- - - - - Phase 60 RW Engineering Services Fee Number of units 0.00 850.00 Total Fee 0.00 Total Eamed 0.00 Previous Fee Billing 0.00 Current Fee Billing 0.00 Total Fee 0.00 Total this Phase 0.00 - - ---- -- ------- ----- -- -- - -- --- - - ----- - -- ---- - - Phase 70 Bidding Services Fee Total Fee 7,500.00 Percent Complete 0.00 Total Earned 0.00 Indianapolis [ Terre Haute ( Lafayette I Scottsburg www.hwcengineering_com Page 2 • Project 2018-005-S Carmel-Carmel Drive&AAA Way Invoice 0000002 Previous Fee Billing 0.00 Current Fee Billing 0.00 Total Fee 0.00 Total this Phase 0.00 - - - - ---- - ---- -- - -- -- -- - - - -- - -- - -- -- - - - - - -- -- - - Phase 80 Contract Administrative Services Billing Limits Current Prior To-Date Total Billings 0.00 0.00 0.00 Limit 28,500.00 Remaining 28,500.00 Total this Phase 0.00 Total this Invoice $6,601.75 Outstanding Invoices Number Date Balance 0000001 6/1/2018 14,131.25 Total 14,131.25 Indianapolis j Terre Haute j Lafayette ; Scottsqurg tnvw.hwcengineeri ng.com Page 3