Loading...
HomeMy WebLinkAbouta0019'-0" FOUNDATION 9' - 1 " 8' - 1 " T/ 2nd FLR. DBL. TOP ⅊ T/ 1st FLR. DBL. TOP ⅊ 9' - 1 " 8' - 1 " T/ 2nd FLR. DBL. TOP ⅊ T/ 1st FLR. DBL. TOP ⅊ T/ 2nd FLR. SUBFLR. T/ 2nd FLR. SUBFLR. 1x6 WINDOW TRIM BRICK SILL - SLOPE 1" - PROJECT BOTTOM 1" - TYPICAL BRICK THRESHOLD - DTL. 06/D1.0 12" 1'-012" 1'-012" 1x8 GUTTER BOARD - w/ ALUMINUM GUTTER & DOWNSPOUTS 12" x 9 12" HARDBOARD FRIEZE - w. BRICK LADDER - w/ BARGE MOULD FIBERGLASS / ASPHALT SHINGLES 10 12 10 12 1x6 CORNER TRIM 1 2" x 9 12" HARDBOARD FRIEZE - NAIL TO FIBER CEMENT PANEL - w/ BARGE MOULD 12" 10 12 1826P 9 1 4 " 6' - 3 " 4'-0" 4'-0" 5'-2 12" 812" 12 10 12 10 8' - 8 3 4 " 7" 01-02 A1.1 1'-012" FIBER CEMENT PANEL (SMOOTH) - w/ 1x2 BATTENS @ 16" o.c. J4 BOARD-N-BATTEN SHUTTER @ 47" TALL 12" BRICK SOLDIER - PULL 12" FROM VENEER BRICK ROWLOCK ABOVE SOLDIER - PULL 34" FROM VENEER J4 BOARD-N-BATTEN SHUTTER @ 71" TALL BRICK SILL - SLOPE 1" - PROJECT BOTTOM 1" J4 BOARD-N-BATTEN SHUTTER @ 63" TALL 1x8 RAKE BOARD - EXTEND 16" FROM SHEATHING 1x8 GABLE FRIEZE - w/ FIBER CEMENT PANEL BACK UP 1x10 TRIM (CUT ARCH) - w/ 1x4 TRIM SURROUND - w/ 1x1 NAIL TO FACE OF TRIM ALONG T/ EDGE r =1 ' - 5 3 4 " FIBER CEMENT PANEL (SMOOTH) - w/ 1x2 BATTENS @ 16" o.c. r = 2 5 ' - 1 1 1 2 " CURVED RAKE BOARD - ENTEND 12" FROM SHEATHING - DETAIL 02/A1.1 WINDOW DRYWALL BRICK VENEER BRICK SILL - SLOPE 1" - PROJECT BOTTOM 1" J4 BOARD-N-BATTEN SHUTTER @ 71" TALL 4'-0"4'-0" 1'-012" 4 12 12 D1.0 r =4 ' -2 7 8 " T/ 1st FLR. SUBFLR. T/ 1st FLR. SUBFLR. 11 6 6 6 3 5 10 7 169 12 4 1 2 5 3 1 2 15 10 1x4 CORNER TRIM 5 12 8 12 8 24" 4 12 12 812 8 Note: All square footage calculations are taken to face of veneer. Gross square footage: Includes square footage that takes into account floor space in a two-story volume. Net square footage: Gross square footage minus the floor space in a two-story volume. Net square footage should be used for determining appraisal value. SQUARE FOOTAGE GROSS AREA NET AREA BASEMENT (FINISHED) BASEMENT (UNFINISHED) FIRST FLOOR GARAGE PATIO PORCH SECOND FLOOR 1010 Sq.Ft. 1694 Sq.Ft. 1689 Sq.Ft. 657 Sq.Ft. 192 Sq.Ft. 117 Sq.Ft. 1805 Sq.Ft. 1010 Sq.Ft. 684 Sq.Ft. 1689 Sq.Ft. 657 Sq.Ft. 192 Sq.Ft. 117 Sq.Ft. 1509 Sq.Ft. ALL SIDES: HORIZONTAL OR SHAKE SIDING TO BE FIBER CEMENT BOARD SIDING MATERIAL: W I L L I A M L . K A U F H O L Z A R C H I T E C T T A L L Y N S RI D G E RE A S O N FO R PL O T : PL O T DA T E : Job No. Sheet No. IN HO M E S I T E N O . OF F I C E R E V I E W : MA S T E R BY : DA T E : C DA T E : 39 4 0 OL Y M P I C B L V D E R L A N G E R , KY 41 0 1 8 PH : (8 5 9 ) 34 1 - 4 7 0 9 F I E L D SP E C HO T L I N E : (8 5 9 ) 34 1 - 4 7 0 9 CO P Y R I G H T A L L RI G H T S R E S E R V E D F I S C H E R HO M E S , In c . JO B IN F O : DA T E : P E R M I T : S I G N -O F F : CO N S T R U C T I O N : RE V I S I O N : R E V I S I O N : RE V I S I O N : RE V I S I O N : HO M E TY P E : PL A N : 6/ 2 9 / 2 0 1 8 2: 1 0 PM # TLR010190000 T L R 0 1 0 1 9 0 0 0 0 * M A R K E T HO M E * 1 4 4 0 4 TR A H A N DR I V E C L A Y T O N 54 - 3 7 0 - C L A Y T O N FR E N C H MA N O R WI T H BR I C K C A R M E L , IN 1 9 0 5 /2 0 1 7 MP -- - - -- - - -- - - 6 -2 7 -1 8 -- - - 6 -2 9 -1 8 -- - - -- - - -- - - -- - - -- - - -- - - fi e l d s p e c c h a n g e @ f i s c h e r h o m e s . c o m R E V I S E D BY : -- - - -- - - -- - - S A P P H I R E T R A D E S U P P O R T s a p p h i r e t r a d e p a r t n e r s @ f i s c h e r h o m e s .c o m Fi s c h e r Ho m e s In d i a n a p o l i s II , L L C f/ k / a Fi s c h e r Ho m e s In d i a n a p o l i s II , L. P . A1.0 MATERIAL LEGEND 1 3 1x8 RAKE BOARD 4 1x8 GUTTER BOARD - w/ ALUM. GUTTER & DOWNSPOUTS 12" x 912" HARDBOARD FRIEZE - TRIM TO T/ WINDOWS 5 FIBERGLASS / ASPHALT SHINGLES 6 PREFINISHED CORNER TRIM - TYPICAL w/ VINYL SIDING <OR> 1x4 CORNER TRIM - TYPICAL w/ FIBER CEMENT PLANK SIDING / PANELS 7 1x6 WINDOW JAMB TRIM 8 9 1x8 WINDOW JAMB TRIM 1x10 WINDOW JAMB TRIM 12 1x12 KICK PLATE - TRIM TO FIT 13 (2) 1x8 KICK PLATE - BUTTED TOGETHER 10 214"h. x 4"d. CAST STONE SILL - PROJECT BOTTOM 1"± HORIZONTAL SIDING - REFER TO BOX NOTE BELOW FOR MATERIAL - SEE DTL SHEETS WS-V OR WS-F SHAKE SIDING - REFER TO BOX NOTE BELOW FOR MATERIAL - SEE DTL SHEETS WS-V OR WS-F FIBER CEMENT BOARD PANEL - STUCCO FINISH - SEE DTL SHEET WS-F ALL MATERIALS ARE 'TYPICAL' UNLESS OTHERWISE NOTED FIBER CEMENT BOARD PANEL - SMOOTH FINISH - SEE DTL SHEET WS-F CULTURED STONE VENEER - REFER TO SELECTIONS - SEE DTL SHEETS WS-C BRICK VENEER - SEE DTL SHEETS WS-B WAVEY-EDGE CEDAR SIDING - SEE DTL SHEETS WS-V OR WS-F 11 BRICK SILL COURSE - SLOPE 1" - PROJECT BOTTOM 1" 2 1x8 GABLE FRIEZE NOTE: REFER TO A7.0 FOR THE ROOF PLAN, RIDGE VENT LOCATIONS, AND GUTTER AND DOWNSPOUT LOCATIONS. 14 214"h. x 234"d. CAST STONE SILL - PROJECT BOTTOM 34"± 15 12" x 912" HARDBOARD FRIEZE, LAPPED - TRIM TO T/ WINDOWS 16 1x8 BAND BOARD 17 1x6 CORNER TRIM 18 1x12 TRIM 19 1x8 TRIM 20 35 8"h. x 65 8"d. CAST STONE SILL -PROJECTBOTTOM 1"± FIBER CEMENT BOARD PANEL - VERTICAL SIDING - SEE DTL SHEET WS-F 21 1x4 TRIM 22 1x10 TRIM 23 1x6 TRIM 24 BLOCKING @ TRUSS CANTILEVER NOTE: DASHED LINES BELOW T/ FOUNDATION DEPICT INSTALLED WINDOWS OR DOORS - LOCATED PER A2.0 SCALE = 1'-0" FRONT ELEVATION 1/4"01 SCALE = 1'-0" LEFT SIDE ELEVATION 1/8"02 SCALE = 1'-0" REAR ELEVATION 1/8"03 SCALE = 1'-0" RIGHT SIDE ELEVATION 1/8"04 07/24/18 William Hohlt