HomeMy WebLinkAbout328220 07/31/18 Coq
`��,._1''' CITY OF CARMEL, INDIANA VENDOR: 371561
ONE CIVIC SQUARE WHITE CONSTRUCTION, INC. CHECK AMOUNT: $****13,815.50*
9:® �� CARMEL, INDIANA 46032 3900 E.WHITE AVENUE CHECK NUMBER: 328220
�,��*oN�, CLINTON IN 47842 CHECK DATE: 07/31/18
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
900 4462870 101438 3 13,815.50 3/7/18 CONTRACT; 108
VOUCHER NO. WARRANT NO. Prescribed by state Board of Accounts City Form No.201(Rev.1995)
Vendor# 371561 ALLOWED 20 ACCOUNTS PAYABLE VOUCHER
WHITE CONSTRUCTION, INC. IN SUM OF$ CITY OF CARMEL
3900 E. WHITE AVENUE An invoice or bill to be properly itemized must show:kind of service,where performed,dates service
rendered,by whom,rates per day,number of hours,rate per hour,number of units,price per unit,etc.
CLINTON, IN 47842
Payee
$13,815.50
ON ACCOUNT OF APPROPRIATION FOR Purchase Order#
Engineering
Terms
Date Due
PO# ACCT# DATE INVOICE# DESCRIPTION
DEPT# INVOICE# Fund# AMOUNT Board Members DEPT# FUND# (or note attached invoice(s)or bill(s)) AMOUNT
101438 3 44-628.70 $13,815.50 1 hereby certify that the attached invoice(s),or 7/16/18 3 City Center Drive and 3rd Ave SW RAB- $13,815.50
2200 900 2200 900 Community Crossing Grant
bill(s)is(are)true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
Wednesday,July 25,2018
Jeremy Kashman
Director
I hereby certify that the attached invoice(s),or bill(s),is(are)true and correct and I have
audited same in accordance with IC 5-11-10-1.6
,20—
Cost
20Cost distribution ledger classification if claim paid motor vehicle highway fund. Clerk-Treasurer
CITY OF CARMEL
PROJECT NO. 16-ENG-108
City Center Drive and 3rd Avenue SW RAB
Progress Estimate Summary Sheet Et Signature Page
Progress Estimate No 3
Partial x
Final
Earned to date $ 1,303,405.82 P.O. n y3$
Previous payments $ 729,093.89 900 -4 4 b 2 8-4-D
Earnings this estimate $ 574,311.93
Retainage $ 57,431.19 s o
Amount due Contractor $ 516,880.74
PO 101438- $" 13,815.50
PO'"101429- $ `'. 503;069.24
CONTRACTOR: DATE: 717—3/10'>
White Construction Phone: (800) 355-9401
3900 East Whilte Avenue, PO Box 249 Fax: (765)832-2075
Clinton, IN 47842
CONSULTANT: Qj DATE:
AMERICAN STRUCTUREPOINT, INC. Phone: (317) 547-5580
7260 Shadeland Station Fax: (317) 543-0270
Indianapolis, Indiana 46256-3957
APPROVED BY: DATE:
CITY OF C EL
American Structurep®int, Inc.
Payment Invoice
16-ENG-108 - City Center Drive and 3rd Avenue SW RAB
Description The existing signalized intersection will be reconstructed to a multi-lane roundabout. The project
construction will include reconstructing the median and outside curb lines for a multi-lane roundabout.
The asphalt pavement will be milled and reconstructed as needed for the roundabout intersection.
Additionally the pedestrian facilities adjacent to the vehicular travel lanes will be altered to improve
pedestrian safety and mobility. The existing storm water system will be reconstructed as needed for the
intersection improvements. Additional lighting will be installed for the roundabout intersection. The
private drives located within the limits of the intersection reconstruction will be replaced. Streetscape
improvements along 3rd Avenue SW and around the roundabout will be constructed. Access to
properties within the project limits will be maintained during construction.
Payment Number 3
Pay Period 06/01/2018 to 06/30/2018
Approval Date 07/16/2018
Prime Contractor White Construction
3900 East Whilte Avenue,PO Box 249
Clinton,IN 47842
Payment Status Pending
Awarded Project Amount $3,288,270.00
Authorized Amount $3,288,270.00
Line mber,rt� It01
emP
omit ¢� 4 CurenthPa�d Quantity Unit .-nice Amount
-
NINE 5 �ay.. £ ... e
- _
Section:,i Description ,
0001 0001 LS 0.450 $150,000.000 $67,500.00
CONSTRUCTION ENGINEERING
0004 0004 SYS 154.000 $25.000 $3,850.00
CENTER CURB,CONCRETE,REMOVE
0005 0005 LFT 94.000 $10.000 $940.00
CURB,CONCRETE,REMOVE
0006 0006 LFT 367.000 $10.000 $3,670.00
CURB AND GUTTER,REMOVE
Project Total: $574,311.93 -
Payment Invoice: 07/16/2018
16-ENG-108-City Center Drive and 3rd Avenue SW RAB Page 1 of 5
Fix 'Yi 5wa �. .�",
LineN,umber= �� ��Item @�.# �,Unit ��`� ;�����`a Current Paid Quantity `�� i�,Y UnttPxice � ��` Amaunt LL
0007 0007 SYS 111.330 $7.500 $834.98
SIDEWALK CONCRETE,REMOVE
0009 0009 EACH 2.000 $875.000 $1,750.00
LIGHT STANDARD AND FOUNDATION,REMOVE
0010 0010 EACH 3.000 $900.000 $2,700.00
SIGNAL POLE FOUNDATION,REMOVE
0012 0012 CYS 2,111.500 $25.000 $52,787.50
EXCAVATION,COMMON
0020 0020 SYS 512.750 $15.000 $7,691.25
SUBGRADE TREATMENT,TYPE II
0021 0021 SYS 2,000.000 $25.000 $50,000.00
SUBGRADE TREATMENT,TYPE IC
0022 0022 CYS 42.560 $50.000 $2,128.00
STRUCTURE BACKFILL,TYPE 2
0025 0025 SYS 139.550 $75.000 $10,466.25
WIDENING WITH PCC BASE,6 IN.
0029 0029 TON 25.270 $90.000 $2,274.30
HMA,INTERMEDIATE,TYPE C, 19.0 mm
0030 0030. TON 115.460 $80.000 $9,236.80
HMA,BASE,TYPE C,25.0 mm
0038 0038 SYS 251.110 $100.000 $25,111.00
DECORATIVE CONCRETE PAVEMENT,TRUCK APRON,7 IN.
0045 0045 LFT 985.200 $38.000 $37,437.60
STRAIGHT CONCRETE CURB
0046 0046 SYS 3.500 $500.000 $1,750.00
CENTER CURB,D
0047 0047 LFT 1,659.500 $33.000 $54,763.50
CURB AND GUTTER,TYPE H
0048 0048 LFT 349.000 $47.000 $16,403.00
Project Total:$574,311.93 .
Payment Invoice: 07/16/2018
16-ENG-108-City Center Drive and 3rd Avenue SW RAB Page 2 of 5
) ^ffF �.ti:, h-
'€
Line:Number Item. Unat ;a a ;�Gurrent.Paid uanti
.74 � UnitPce , s ountH
ROLL CURB,CONCRETE
0049 0049 SYS 304.700 $65.000 $19,805.50
PCCP FOR'APPROACHES,6 IN.
0050 0050 SYS 399.150 $107.000 $42,709.05
PCCP FOR APPROACHES,9 IN.
0056 0056 LFT 160.000 $8.000 $1,280.00
PIPE,TYPE 4,CIRCULAR, 6 IN.
0057 0057 LFT 139.500 $60.000 $8,370.00
PIPE,CLASS III RCP,CIRCULAR, 12 IN.
0061 0061 CYS 10.700 $65.000 $695.50
AGGREGATE FOR UNDERDRAINS
0062 0062 SYS 124.800. $1.500 $187.20
GEOTEXTILES FOR UNDERDRAIN
0067 0067 EACH 3.000 $3,000.000 $9,000.00
INLET,J10
0071 0071 EACH 2.000 $4,000.000 $8,000.00
MANHOLE,CIO
0072 0072 EACH 1.000 $5,000.000 $5,000.00
MANHOLE,J13
0074 0074 EACH 13.000 $125.000 $1,625.00
ROAD CLOSURE SIGN ASSEMBLY
0075 0075 EACH 29.000 $60.000 $1,740.00
DETOUR ROUTE MARKER ASSEMBLY
0076 0076 EACH 8.000 $100.000 $800.00
CONSTRUCTION SIGN,A
0077 0077 EACH 8.000 $40.000 $320.00
CONSTRUCTION SIGN,B
0078 0078 LS 0.250 $150,000.000 $37,500.00
MAINTAINING TRAFFIC
Project Total: $574,311.93
Payment Invoice: 07/16/2018
16-ENG-108-City Center Drive and 3rd Avenue SW RAB Page 3 of 5
I,ineNuanlaer �, �=� I'tem �[Tnat� U� �� 4�=�� �Gurrent�)'aad�Q4uantaty � �;`� Unat�Prce �� ; Aanoatnt
0079 0079 LFT 240.000 $10.000 $2,400.00
BARRICADE,III-A
0080 0080 LFT 72.000 $10.000 $720.00
BARRICADE,III-B
0090 0090 LFT 120.000 $13.000 $1,560.00
CONDUIT,PVC,2 IN., SCHEDULE 80
0092 0092 LFT 120.000 $15.000 $1,800.00
CONDUIT,PVC,4 IN., SCHEDULE 80
0093 0093 LFT 120.000 $17.000 $2,040.00
CONDUIT,PVC,4 IN., SCHEDULE 80,WITH 4-1 IN.INNERDUCTS
0131 0131 LFT 70.100 $30.000 $2,103.00
12"WIDE CONCRETE BAND
0133 0133 LFT 423.000 $35.000 $14,805.00
24"WIDE CONCRETE BAND
0145 0145 LFT 18.800 $50.000 $940.00
24"WIDE SCORED CONCRETE BAND
0163 0163 LFT 135.000 $90.000 $12,150.00
12"DUCTILE IRON WATER MAIN
0164 0164 LFT 19.500 $65.000 $1,267.50
8"DUCTILE IRON WATER MAIN
0165 0165 LFT 154.500 $50.000 $7,725.00
STRUCTURE BACKFILL
0166 0166 LFT 519.000 $25.000 $12,975.00
HMA PATCHING,TYPE C
0170 0170 EACH 2.000 $25000.000 $4,000.00
8"CONNECTION
0171 0171 EACH 2.000 $2,500.000 $5,000.00
10"CONNECTION
0172 0172 EACH 4.000 $3,000.000 $12,000.00
Project Total: $574,311.93 .
Payment Invoice: 07/16/2018
16-ENG-108-City Center Drive and 3rd Avenue SW RAB Page 4 of 5
4 r S F �,.
Eine Number_ ,�, „Item ��Untt Current Paid iaritIt. � 'g r �
Q Y Vert?Priced a Amount
�. �����+.
zF€
12"CONNECTION
0173 0173 EACH 1.000 $750.000 $750,00
HYDRANT RETIREMENT
0178 0178 EACH 1.000 $1,250.000 $Y,250.00
12"CUT&CAP
0180 0180 . EACH 1.000 $2,500.000 $2,500.00
REMOVE,REPLACE FIRE HYDRANT
Section Totah,$574,311.93
Project Total: $5.. 4,311.93
Summary
Current Approved Work: $574,311.93 Approved Work To Date: $1,303,405.82
Current Stockpile Advancement: $0.00 Stockpile Advancement To Date: $0.00
Current Stockpile Recovery: $0.00 Stockpile Recovery To Date: $0.00
Current Retainage: $57,431.19 Retainage To Date: $130,340.58"
Current Retainage Released: $0.00 Retainage Released To Date: $0.00
Current Liquidated Damages: $0.00 Liquidated Damages To Date: $0.00
Current Adjustment: $0.00 Adjustments To Date: $0.00
Current Payment: $516,880.74 Payments To Date:. $1,173,065.24
Previous Payment: $528,272.00 Previous Payments To Date:_ $656,184.50
Payment Invoice: 07/16/2018