Loading...
HomeMy WebLinkAboutM003.0CG BG BB AB A2B C1 C1 CG1 DB D1B EB FG FB V1 V2 V3 V4 V5 V6 V7 V9 V12 V15 V18 V10 V13 V16 V8 V11 V14 V17 V19 V20 PB PB JUS26 HUS26 JUS26 JUS26 JUS28 JUS28 JUS26 HUS26 JUS28 JUS28 JUS28 JUS28 JUS28 JUS28 JUS28 JUS26 JUS28 JUS28 JUS26 JUS28 JUS26 JUS26 JUS28 JUS26 JUS26 JUS28 JUS28 JUS26 JUS26 JUS28 JUS26 JUS26 JUS28 JUS28 JUS28 JUS28 JUS26 HUS26 A1(7) A2(3) C(5) D(3) D1(12) E(3) A3(2) A(3) PB1(15) 11-08 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-11-08 2-00-00 2-00-00 2-00-00 2-00-00 1-09-12 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-09-12 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 1-10-08 1-06-00 1-05-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 Order #: 18070278 The Grove at Legacy - 185B Carmel, Indiana 46033 Carter Lumber 2901 N. Morton St. Franklin, Indiana 46131 (317) 346-1300 THIS IS A TRUSS PLACEMENT DIAGRAM ONLY. These trusses are designed as individual building components to be incorporated into the building design at the specification of the buildingdesigner. Seeindividualdesignsheetsforeachtrussdesign identified on the placement drawing. The building designer is responsiblefortemporaryandpermanentbracingoftheroofandfloorsystem and for the overall structure. The design of the truss support structure including headers, beams, walls, and columns is the responsibility of the building designer. For general guidance regarding bracing, consult "Bracing of Wood Trusses" available from the Truss Plate Institute, 583 D'Onifrio Drive; Madison, WI 53179. SHOP DRAWING APPROVAL THIS LAYOUT IS THE SOLE SOURCE FOR FABRICATION OF TRUSSES AND VOIDS ALL PREVIOUS ARCHITECTURAL OR OTHER TRUSS LAYOUTS. REVIEW AND APPROVAL OF THIS LAYOUT MUST BE RECEIVED BEFORE ANY TRUSSES WILL BE BUILT. VERIFY ALL CONDITIONS TO INSURE AGAINST CHANGES THAT WILL RESULT IN EXTRA CHARGES TO YOU. REVIEWED BY:__________________________ APPROVED BY:______________________________ DATE:___________ Pyatt Builders Scale: NTS Date: 7/21/18 Drawn By: K. Bronnenberg Model Austin