Loading...
HomeMy WebLinkAbout48NOTE: STAKE TREES ONLY UPON THE APPROVAL OF THE LANDSCAPE ARCHITECT NOTE: WRAP TREE TRUNKS ONLY UPON THE APPROVAL OF THE LANDSCAPE ARCHITEC MARK THE NORTH SIDE OF THE TREE IN THE NURSERY, AND ROTATE TREE TO FAI NORTH AT THE SITE WHEN EVER POSSIBL SET TOP OF ROOT BALL FLUSH TO GRADE OR 25-50 MM (1-2 IN.) HIGHER IN SLOWLY DRAINING SOILS. 200 MM (8 IN.; 75 MM (3 IN.) MULCH. DO NO PLACE MULCH IN CONTACT WITH TREE \� MIN. 2400 MM (8FT.) DIAM/ NOTE: DO NOT HEAVILY PRUNE THE TREE AT PLANTING. PRUNE ONLY CROSSOVER LIMBS, CO -DOMINANT LEADERS, AND BROKEN OR DEAD BRANCHES. SOME INTERIOR TWIGS AND LATERAL BRANCHES MAY BE PRUNED; HOWEVER, DO NOT REMOVE THE TERMINAL BUDS OF BRANCHES THAT EXTEND TO THE EDGE OF THE CROWN. EACH TREE MUST BE PLANTED SUCH THAT THE TRUNK FLARE IS VISIBLE AT THE TOP OF THE ROOT BALL TREES WHERE THE TRUNK FLARE IS NOT VISIBLE SHALL BE REJECTED. DO NOT COVER THE TOP OF THE ROOT BALL WITH SOIL 100 MM (4 IN.) HIGH EARTH SAUCER BEYOND EDGE OF ROOT BALL REMOVE ALL TWINE, ROPE AND WIRE, AND BURLAP FROM TOP HALF OF ROOT BALL TRUNK. MAINTAIN THE MULCH IF PLANT IS SHIPPED WITH A WIRE BASKET AROUND THE WEED -FREE FOR A MINIMUM OF ROOT BALL, CUT THE WIRE BASKET IN FOUR PLACES AND THREE YEARS AFTER PLANTING. FOLD DOWN 200 MM (8 IN.) INTO PLANTING HOLE. PLACE ROOT BALL ON UNEXCAVATED OR TAMPED SOIL NOTE: FOR DIMENSIONS OF PLANTING AREAS, TYPES OF SOIL AMENDMENTS, OR SOIL TAMP SOIL AROUND ROOT BALL BASE REPLACEMENT, SEE "SOIL IMPROVEMENT DETAILS." FIRMLY WITH FOOT PRESSURE SO THAT ROOT BALL DOES NOT SHIFT. NOTE: THIS DETAIL ASSUMES THAT THE PLANTING SPACE IS LARGER THAN AN 8' SQUARE OPEN TO THE SKY, AND NOT COVERED BY ANY PAVING OR GRATING. TREE PLANTING DETAIL FOR B&B IN ALL SOIL TYPES SEASONAL COLOR 12' H STEEL OR EDGE 18' r c...� SHRUB MULCH FINISH GRADE PLANTING SOIL MIX -j NOTE: BREAK THROUGH ANY EXISTING 'HARD -PAN' AND REMOVE AS NECESSARY TO PROVIDE GOOD PERCOLATION AND POSITIVE DRAINAGE SEASONAL COLOR & NOT TO SCALE mail on] I WA NOT TO SCALE BED WIDTH 24' U.N.O. 24' U.N.O. SHRUB CROWN BED 2-3" ABOVE FINISH GRADE. TOP OF ROOTBALL TO BE A MIN. OF 2" ABOVE FINISH �.+ GRADE. • MULCH PLANTING SOIL MIX SPADE OR STEEL EDGE o� �- NOTE: BREAK THROUGH ANY EXISTING 'HARD -PAN' AND REMOVE AS NECESSARY TO PLANTING PROCEDURE PROVIDE GOOD PERCOLATION AND POSITIVE 1. LAYOUT BED AND OUTLINE WITH SPADE EDGE. DRAINAGE. 2. ROTOTILL BED TO 12" DEPTH. SPREAD 6" MIN. LAYER OF PLANTING SOIL MIX OVER BED. ROTOTILL PLANTING SOIL MIX INTO TOP OF BED. 3. INSTALL PLANTS, MULCH AND WATER THOROUGHLY. HEDGE PLANTING $ L801 NOT TO SCALE STEEL OR EDGE WIRE OR CABLE SIZES SHALL BE AS FOLLOWS: TREES UP TO 65 MM (2.5 IN.) CALIPER - 14 GAUGE TREES 65 MM (2.5 IN.) TO 75 MM (3 IN.) CALIPER - 12 GAUGE TIGHTEN WIRE OR CABLE ONLY ENOUGH TO KEEP FROM SUPPING. ALLOW FOR SOME TRUNK MOVEMENT. PLASTIC HOSE SHALL BE LONG ENOUGH TO ACCOMMODATE 35MM (1.5 IN.) OF GROWTH AND BUFFER ALL BRANCHES FROM THE WIRE TUCK ANY LOOSE ENDS OF THE WIRE OR CABLE INTO THE WIRE WRAP SO THAT NO SHARP WIRE ENDS ARE EXPOSED. 13 MM (0.5 IN.) — DIAM. PLASTIC HOSE GALVANIZED WIRE OR CABLE TWIST WIRE TO TIGHTEN. 3- 240 x 40 MM (1.5 x 1.5 IN.) HARDWOOD STAKES OR OTHER I I E APPROVED STAKE MATERIAL ALL STAKES SHALL BE DRIVEN OUTSIDE C. N E THE EDGE OF THE ROOT BALL o' co THE FIRST STAKE SHALL BE DIRECTLY SOUTHWEST OF THE TREE TRUNK. ASSURE THAT THE BEARING SURFACE OF THE PROTECTIVE COVERING OF THE WARE OR CABLE AGAINST THE TREE TRUNK IS A MINIMUM OF 12 MM (0.5 IN.). REMOVE ALL STAKING AS SOON AS THE TREE HAS GROWN SUFFICIENT ROOTS TO OVERCOME THE PROBLEM THAT REQUIRED THE TREE TO BE STAKED. STAKES SHALL BE REMOVED NO LATER THE END OF THE FIRST FULL GROWING SEASON AFTER PLANTING. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REMOVE STAKING MATERIALS. TREE STAKING DETAIL TREES 3" CALIPER OR LESS 4 L801 NOT TO SCALE NOTE: FOR DETAILED REQUIREMENTS RELATED TO THE PLANTING OF THE TREE IN THE IMPROVED SOIL, SEE "TREE PLANTING DETAIL" LOAMY SOIL BACK FILL WITH EXISTING SOIL IN SANDY LOAM SOILS, ADD 20% MAX. BY VOLUME COMPOSTED ORGANIC MATERIAL TO THE EXISTING SOIL Ku GALVANIZED WIRE OR TWIST WIRE TO TIGHT 4" HIGH EARTH NOTE: LOCATE 1 STAKE DIRECTLY SOUTHWEST OF TREE TRUNK PLAN VIEW HARDWOOD STAKES OR OTHER APPROVED STAKE MATERIAL (TYP. OF 3) MULCH 13 MM (0.5 IN.) DIAM. PLASTIC HOSE TREE TREE STAKING DETAIL 1 L801 NOT TO SCALE LAWN AREA 'I ffiv '— 1:1 SLOPE ON SIDES OF VERTICAL EDGE PLANTING HOLE TAMP SOIL AROUND J UNEXCAVATED OR ROOT BALL BASE 2 TIMES THE ROOT BALL COMPACTED MOUND UNDER FIRMLY WITH FOOT DIAMETER THE ROOT BALL TO PREVENT PRESSURE SO THAT SETTLEMENT. ROOT BALL DOES NOT SHIFT. LOAMY SOILS INCLUDE THE FOLLOWING USDA TEXTURAL CLASSIFICATIONS AND HAVE A CLAY CONTENT OF BETWEEN 15 TO 27% LOAM, SANDY LOAM AND SILT LOAM. NOTE THAT SOILS AT THE OUTER LIMITS OF THE LOAM CLASSIFICATIONS MAY PRESENT SPECIAL PLANTING PROBLEMS NOT ANTICIPATED BY THIS DETAIL. LOAMY SOILS ARE DEFINED AS GRANULAR OR BLOCKY FRIABLE SOILS, A MIXTURE OF SAND, SILT AND CLAY PARTICLES WITH A MINIMUM OF 1.5% BY DRY WEIGHT ORGANIC MATTER. THE SOIL MUST NOT BE SO COMPACTED AS TO IMPEDE ROOT GROWTH OR DRAINAGE. THE SOIL STRUCTURE SHALL NOT BE PLATY OR MASSIVE. THE SOIL MUST BE TESTED FOR TEXTURE, DRAINAGE CAPABILITY, PH, AND NUTRIENT VALUES PRIOR TO DETERMINING ANY ADDITIONAL SOIL IMPROVEMENTS. CONTRACTOR SHALL CONSULT LANDSCAPE ARCHITECT IN POOR SOIL CONDITIONS. NOTE: TREES PLANTED IN NON RESTRICTED SOIL CONDITIONS. THIS DETAIL ASSUMES THAT THE AREA OF LOAMY SOIL AVAILABLE TO EACH TREE IS A MINIMUM OF 500 SQUARE FEET. SOIL IMPROVEMENT DETAIL 5 L801 NOT TO SCALE 18' U.N.O. ROW SPACING SHRUB (PER PLAN) SHREDDED BARK MULCH PLANTING SOIL MIX (AS SPECIFIED) FINISH GRADE NOTE: BREAK THROUGH ANY EXISTING 'HARD -PAN' AND REMOVE AS NECESSARY TO PROVIDE GOOD PERCOLATION AND POSITIVE DRAINAGE. PLANTING PROCEDURE 1. LAYOUT BED AND OUTLINE WITH SPADE EDGE 2. ROTOTILL BED TO 12" DEPTH. SPREAD 4' MIN. LAYER OF PLANTING SOIL MIX OVER BED. ROTOTILL PLANTING SOIL MIX INTO TOP OF BED. 3. INSTALL PLANTS, MULCH AND WATER THOROUGHLY. SHRUB MASS PLANTING 6 L801 NOT TO SCALE NOTE: STEEL LAWN EDGING SHALL BE USED AT ALL LAWN EDGES AND AT EDGES OF MULCHED AREAS (FOR CONTAINMENT). STEEL OR SP EDGE PLANTING OR MULCHED AREA MULCH AS SPECIFIED EXISTING GRADE OR GRADE OF PLANTING AREA NOTE: TRENCH EDGE SHALL CREATE A CLEAN SEPERATION BETWEEN AREAS; AND SHALL CREATE SMOOTH AND EVEN LINES (AS INDICATED ON THE PLANS). SPADE EDGE 2 L801 NOT TO SCALE 12' U.N.O. ROW SPACING GROUNDCOVER (PER PLAN) SHREDDED BARK MULCH PLANTING SOIL MIX (AS SPECIFIED) FINISH GRADE a r. NOTE BREAK THROUGH ANY EXISTING 'HARD -PAN' AND REMOVE AS NECESSARY TO PROVIDE GOOD PERCOLATION AND POSITIVE DRAINAGE. PLANTING PROCEDURE 1. LAYOUT BED AND OUTLINE WITH SPADE EDGE. 2. ROTOTILL BED TO 12" DEPTH. SPREAD 4" MIN. LAYER OF PLANTING SOIL MIX OVER BED. ROTOTILL PLANTING SOIL MIX INTO TOP OF BED. 3. INSTALL PLANTS, MULCH AND WATER THOROUGHLY. GROUNDCOVER MASS PLANTING 3 L801 NOT TO SCALE DATE: 12/18/09 THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. © COPYRIGHTED BY THE SCHNEIDER CORP. (2007) %1 Schneider THE SCHNEIDER CORPORATION Historic Fort Harrison 8901 Otis Avenue Indianapolis, IN 46216-1037 Telephone: 317.826.7100 Fax: 317.826.7200 www.schneidercorp.com Architecture Civil Engineering Environmental Engineering Geotechnical Services GIS * LIS Home Builder Services Interior Design Land Surveying Landscape Architecture Transportation Engineering CrD d F� d CDI—� z p� I-1 E- Irl H z z d_ z Q z O a w w x o W W S O � � A A w o < F� F•� � w a U CD Q E- W x E- � a�