Loading...
HomeMy WebLinkAbout85cl Lo Ln 0 0 0 U W O a i 3 BUILDING SECTION THROUGH CONNECTOR RAMP 3/16"=1'0" COPYRIGHT Aspen Group, Inc. © 2009 (Lr—'- -.. " BUILDING SECTION THROUGH NURSERY & AWANA 3/16"=1'0" M BUILDING SECTION PLAN NOTES 1 EXISTING ROOF STRUCTURE TO REMAIN 2 EXISTING EXTERIOR WALLS TO REMAIN EXISTING FOUNDATION TO REMAIN 40 EXISTING CONCRETE SLAB TO REMAIN NEW OPENING IN EXISTING EXTERIOR WALL SUSPENDED ACOUSTICAL CEILING 0 DRYWALL BULKHEAD - REFER TO BULKHEAD DETAILS SHEET: ACOUSTICAL CEILING CLOUD g EXISTING DRYWALL CEILING. PATCH AND REPAIR AS REQUIRED. 10 EXISTING COLUMN BEYOND TO REMAIN. FURR OUT AROUND. 11 STADIUM SAVER SYSTEM FOR SUPPORTS OF H.C. ACCESSIBILITY RAMP. 12 METAL PIPE AND GLASS H.C. HANDRAIL. 13 NEW ROOF TOP UNITS - REFER TO STRUCTURAL DWGS. 14 PARAPET WALL BEYOND 15 NEW 4" CONCRETE SLAB OVER STADIUM SAVER SYSTEM. 16 CASEWORK. REFER TO INTERIORS DRAWINGS. 17 42" HIGH WALL WITH WOOD CAP. REFER TO INTERIORS DRAWINGS. 18 RESTROOM VANITY WITH SINKS. REFER TO INTERIORS DRAWINGS. 19 MIRROR. REFER TO INTERIORS DRAWINGS. 20 DUCTWORK - REFER TO HVAC DRAWINGS. 21 ADA COMPLIANT METAL AND GLASS HANDRAIL SYSTEM. 22 CASEWORK AND/OR SHELVING BY OWNER I f Ire* r 'NO. i iAR10300155 .: i STATE OF sigT1 StidrE U z L co O � (o U U Z W U) .�C E w CD z W s = J_ rn co D 0) � m ^, 0 Q W o F— �_ N O z� U N DATE: c: M TERRI HARTMAN Q O SHEET: A.a.-301 Y 07-0055 U � � i Z Q1 O U) C N £ Ln U 2 p I � U ^ a � U O • c O v i O 3 W L 0 O loL 00 Ln X r .cn m i O 0) Z ) WEU m a m U) O W U E Cl W W ❑ U Z 0 io aEi o U) J H co 0 0 W � � Q N Q 11111 Y F 1 O 1 K M Y t 4 t Z/ I f Ire* r 'NO. i iAR10300155 .: i STATE OF sigT1 StidrE U z L co O � (o U U Z W U) .�C E w CD z W s = J_ rn co D 0) � m ^, 0 Q W o F— �_ N O z� U FILE NAME: N DATE: c: M TERRI HARTMAN Q O SHEET: A.a.-301 ASPEN PROJECT #: 07-0055 U � � i Z Q1 O U) C N £ Ln U ° LnU p I � U ^ a � O • c O v i O 3 L 0 loL 00 Ln X r .cn W i O 0) FILE NAME: A-301 DATE: 12-29-09 DRAWN BY: TERRI HARTMAN SHEET: A.a.-301 ASPEN PROJECT #: 07-0055