Loading...
HomeMy WebLinkAbout98Mezzanine Floor Plan 1/8" = 1'-0" D.8 E.5 14 i PLATFORM RIGGING AREA 61085 H.5 i Enlarged Sank-ryPlatform 2 1 /4" = 1'-0" COPYRIGHT Aspen Group, Inc. © 2009 RB RC RD CR E rC L RG RH RL (RA EnlargQd Plan @Sanctuary Risers 1/4" = 1' C A 61 ^ T I I A In %/ 5 b.603 N H.5 FLOOR PLAN KEYNOTES A.2 PREPARE SUBSTRATE FOR NEW FLOORING AND BASE MATERIAL THIS ENTIRE ROOM. REFERENCE ROOM FINISH SCHEDULE & SPECIFICATIONS FOR PRODUCT TYPES A.10 HYDRAULIC CHAIR LIFT A.30 SEMI -RECESSED FIRE EXTINGUISHER & CABINET MOUNTED AT 34" A.F.F.-REFER TO MECHANICAL DRAWINGS FOR EXTINGUISHER RATINGS, LOCATIONS AND NOTES A.35 ROOF TOP ACCESS- LADDER WITH SAFETY CAGE A.36 ACCESS TO CATWALK A.47 STRUCTURAL CROSS -BRACING - SEE STRUCTURAL A.48 GUARDRAIL PER CODE REQUIREMENTS 9.8 Enlarged Plan @ Sanctuary Risers 1/4" = 1'-0" C) - - 4 --- 'A .10 — b.30 RE Enlarged Plan 1/4" = 1'-0'1 Tech Booth kCL RG Q 4 Enlarged Plan @Sanctuary Risers 1/4" = 1'-0" Mezzanine Floor Plan • N0. s AR10300155 i . • i STATE OF • 1 ANP..` Signalure SEAL: DATE: 12/22/2009 DRAWN BY: Author SHEET: A.b.106 N 07-0055 L 0 Z U) c O 70 U C:m N CU a� CU a) N w w C a CU T o O Y U CU IZ 0 d U N o U) m O O � N cD C M O O Z Mezzanine Floor Plan • N0. s AR10300155 i . • i STATE OF • 1 ANP..` Signalure SEAL: 0 FILE NAME: DATE: 12/22/2009 DRAWN BY: Author SHEET: A.b.106 ASPEN PROJECT #: 07-0055 L 0 Z � .Q U C:m N CU CU a) N w w C a T o IZ 0 U o 0 FILE NAME: DATE: 12/22/2009 DRAWN BY: Author SHEET: A.b.106 ASPEN PROJECT #: 07-0055